-
Adelaide subway study stage 1. Expansion into North and West Adelaide. Survey of geology, buildings and underground services.
There is no abstract created for this record-
Document
Published: 01 Jan 1974
-
Bull 051 Engineering Geology of the Adelaide City Area
The importance of engineering geology has been emphasised since the 1950s. when construction commenced in the city of a new generation of multistorey buildings. Foundation drilling along with geological and geophysical services provided by the...-
Document
-
RB 00667 Minlaton and Stansbury stratigraphic bores. Subsurface stratigraphy and micropalaeontology.
Minlaton Bore intersected 596 feet of Lower Permian (?lowermost Sakmarian) glacigenes and then a lower Middle to Lower Cambrian succession 2459 feet thick consisting in downward sequence of Ramsey Limestone (105 feet), red bed clastics (456 feet),...-
Document
Published: 01 Aug 1900
-
RB 00711 Black Point no. 1A well. Subsurface stratigraphy and micropalaeontological study.
Beach Petroleum Black Point No. 1 Stratigraphic Well intersected 574 feet of mostly recent and lower Tertiary sediments before entering lower to middle Cambrian red-bed arkrose of an unnamed formation which has been mapped at Pint Point and Rocky...-
Document
Published: 01 Dec 1900
-
RB 00677 Grange 1 well. Subsurface stratigraphy.
Grange No. 1 Well was drilled to a depth of 1983 feet, and penetrated a sedimentary sequence of Quaternary and Tertiary rocks to 1872 feet before bottoming in red shale and grey slates of Proterozoic Age. Pleistocene to Recent sandy clays with some...-
Document
Published: 01 Jan 1962
-
RB 00693 Beach Petroleum NL's Troubridge Shoal 1 stratigraphic well. Subsurface stratigraphy.
Beach Petroleum Troubridge Shoal No. 1 Stratigraphic Well, drilled to a depth of 1600 feet intersected Recent, Subrecent and Tertiary sediments to 850 feet below which 750 feet of Lower Permian glacial marine rocks were intersected. The Tertiary...-
Document
Published: 01 Jul 1900
-
RB 00686 Port Vincent no. 1 stratigraphic well. Subsurface stratigraphy.
Pt. Vincent Stratigraphic well was drilled to a depth of 150 feet, penetrating recent to subrecent sands and shellbeds to 40 feet, before entering and bottoming in limestones and marls of Miocene age (Port Willunga Beds).-
Document
Published: 01 Mar 1900
-
RB 66/00999 Palaeontological examination of material collected from three sand-producing water wells situated between Angle Vale and Gawler.
There is no abstract created for this record-
Document
Published: 29 Feb 1972
-
RB 67/00006 Chemistry Building Forensic Laboratory, Kintore Ave, Hd Adelaide. Geological investigations, progress report no. 1, design stage.
Foundation investigations for the proposed Chemistry Building, Forensic Laboratories in Kintore Avenue, were requested in a Minute from the Director, Public Buildings Department dated 1st September 1966. The proposed building is rectangular in shape,...-
Document
Published: 01 Jan 1968
-
RB 67/00058 Exploration for argillaceous material for cement manufacture, Yorke Peninsula - Adelaide Cement Co. Ltd.
Investigations carried out since 1964 have shown that although there are large reserves of Permian, Tertiary and Quaternary clays present near Klein Point, their chemical composition or physical characteristics render them unsuitable for use in the...-
Document
Published: 01 Jan 1970
-
RB 67/00999 Palaeontological examination of material from a building foundation test bore located near Kintore Avenue, Adelaide.
There is no abstract created for this record-
Document
Published: 19 Jan 1967
-
RB 66/00128 Waymouth Street Telephone Exchange geological investigations - Progress report no. 2, design stage T/A 199, Hd Adelaide.
Further drilling to determine foundation conditions at the proposed Waymouth Street Telephone Exchange was requested in a letter from the Director of Works dated 5th February. It was requested that this work be carried out in liaison with Soilmech Pty...-
Document
Published: 01 Jan 1968
-
RB 66/00072 Commonwealth Law Courts building, geological investigations progress report no.1, design stage TA 453, Hd Adelaide - Commonwealth Department of Works.
Foundation investigations for the proposed Commonwealth Law Courts Building were requested in a letter dated 3rd November, 1967 from the Acting Director of Works. The proposed building will be about 130 feet long and 100 feet wide. No other details...-
Document
Published: 01 Jan 1968
-
RB 66/00073 Preliminary report on the stratigraphy of the Dublin 1:63 360 map area.
The Dublin 1:63 360 map area is located on the ADELAIDE 1:250 000 map area, and is centred about 40 miles north-west of Adelaide. Within this area, possible Adelaide System rocks are unconformably overlain by Tertiary marine limestones, sands, silts...-
Document
Published: 01 Jan 1968
-
RB 71/00061 Stratigraphy and engineering properties of the soil and rock horizons beneath the Adelaide city area, Hds Adelaide and Yatala.
The geological conditions and rock and soil properties existing beneath the Adelaide city area, have, of necessity, become more important as both the size of buildings, and the extent of construct ion has increased. Drilling and excavation in the area...-
Document
Published: 08 Apr 1971
-
RB 72/00237 Forensic Science and Motor Vehicles Department buildings, TA 300, 301, Hd Adelaide. Foundation investigations, design stage - Public Buildings Department.
Drilling to determine foundation conditions for the proposed Forensic Science and Motor Vehicles Buildings was requested by Mr. A. Dancauskis of the Public Buildings Department. The two buildings will be from 6 to 9 stories high, will have basements,...-
Document
Published: 08 Dec 1972
-
RB 61/00144 Diamond drilling operations, Klein Point limestone - Adelaide Cement Co. Ltd.
Adelaide Cement Co. Ltd. has operated a Limestone quarry from the cliffs near Klein Point, Yorke Peninsula since 1925. The annual output is about 250,000 tons; production to date exceeds three and a half million tons. A programme of diamond drilling...-
Document
Published: 01 Jan 1967
-
RB 63/00073 Stratigraphy and micropalaeontology of the Willunga bore WB1, a re-examination.
In the light of accumulated stratigraphic and foraminiferal data a re-examination has been made of the Willunga Bore W.B. 1 , drilled in 1951 - 1952 3½ miles east of the coastal type section of the Tertiary sequence in the Willunga Sub-basin and St....-
Document
Published: 23 Sep 1966
-
RB 61/00108 Immanuel College, Camden Park, bore no. 1 stratigraphy and micropalaeontology.
Water bore No. 1 located at Immanuel College in Camden Park, 4½ miles south-west of Adelaide, was sunk to a total depth of 350 feet on a portion of the Para Fault Block bounded by two splinters of the Para Fault. Recent to Pleistocene clays overlie...-
Document
Published: 01 Jan 1965
-
RB 75/00057 Inkerman Coalfield dewatering investigation report no. 1. Aquifer test no. 1.
The low grade lignite deposits which form the Inkerman coalfield lie within a sequence of unconsolidated Tertiary sediments 100 m thick in the northern St. Vincent Basin. Drilling and test pumping in three aquifers has provided approximate...-
Document
Published: 01 Jan 1975