-
RB 96/00021 Palynological dating and correlation of Mesozoic sediments from the ABMINGA 1:250 000 sheet, SA.
Palynological evidence indicates that all 13 submitted drill core sedimentary rock samples, excepting one (taken at 138.2 metres depth in hole A68-1), are late Aptian to earliest Albian in age. The sediments were deposited in environments ranging...-
Document
Published: 01 May 1996
-
RB 97/00040 Western Prospects Seismic Survey application in the Coongie Lakes Control Zone. Assessment report and recommendations.
The high environmental values of the Coongie Lakes area are recognised through their inclusion in the Register of the National Estate, their inclusion as a wetland of international importance under the Ramsar Convention, and wider acknowledgement that...-
Document
Published: 31 Jul 1997
-
Criteria for the Abandonment of Seismic Lines and Wellsites in the South Australian Portion of the Cooper Basin - Stage 1 Impact Identification.
This review is aimed at identifying and assessing the impacts of seismic lines and wellsites in the South Australian area of the Cooper Basin. The impacts are assessed in terms of their relative significance (adverse or long lasting effects) to the...-
Document
Published: 09 Jan 1996
-
Criteria for the Abandonment of Seismic Lines and Wellsites in the South Australian Portion of the Cooper Basin - Stage 4 Derivation of Criteria.
This review is aimed at identifying and assessing the impacts of seismic lines and wellsites in the South Australian area of the Cooper Basin. The impacts are assessed in terms of their relative significance (adverse or long lasting effects) to the...-
Document
Published: 01 May 2000
-
McDouall Peak Station (part of the Central Gawler Project). Final report at licence expiry/full surrender, for the period 20/5/2004 to 19/5/2009.
Exploration for diamonds undertaken by Flinders Mines Ltd (as part of the JV agreement made with Tasman Resources) on the subject EL, located about 70 km south of Coober Pedy, commenced with a re-assessment of open file airborne magnetic data in an...-
Document
-
Ungalootanna Hill (part of the Musgrave Project). Annual and final reports to licence surrender, for the period 24/9/1997 to 1/10/2008.
Exploration of an area in the eastern Musgrave Ranges located 70 km north-east of Marla, 10 km south of Mount Irwin Homestead, and 22 km east of the Stuart Highway, has sought to find possible Giles Complex - hosted magmatic nickel sulphide and...-
Document
Published: 26 Jun 1908
-
Gina Outstation (part of the Central Gawler Project). Final report at licence expiry/full surrender, for the period 20/5/2004 to 19/5/2009.
Exploration for diamonds undertaken by Flinders Mines Ltd (as part of the JV agreement made with Tasman Resources) on the subject EL, located about 30-45 km east of Commonwealth Hill, commenced with a re-assessment of open file airborne magnetic data...-
Document
-
Mundowdna, Wilpoorinna and Dalarinna Hill (part of the Marree Project). Combined final report at licences' joint surrender, for the period 21/6/2006 to 20/3/2009.
Three areas located along the southern margin of the Eromanga Basin, east and south-east of Marree and adjacent to the Strzelecki Track, have been explored for possible economic sedimentary uranium accumulations in porous Mesozoic sandstones, as it...-
Document
-
Mount Carulina and Trapeze Hill (the Oodnadatta Project). Joint annual reports plus succeeding single licence annual reports to licence expiry/full surrender, for the period 6/3/1995 to 12/10/2009. [ Index Part 2 of 2 ].
[ Note - here is Part 2 of the abstract relating to 2 separately indexed parts ]. A new joint venture with Barrick Gold, pertaining to the renewed (as EL 3424) tenement, was signed on 8/2/2007, after which that company as operator undertook a 749...-
Document
Published: 09 Feb 1910
-
Marree. Annual report to licence expiry/full surrender for the period 16/9/2005 to 15/9/2006.
During a search for possible economic shallow alluvial or bedrock-hosted gold in the district surrounding Marree, two grab samples taken at sites located respectively south-west and east of the township found traces of gold, including 15.4 ppm Au in a...-
Document
-
Olympic Dam Project. [Artesian] mound springs of the Lake Eyre South region [environmental] monitoring : half-yearly reports for the period from April 1998 to October 2005.
There is no abstract created for this record-
Document
-
Mabel Creek. Annual and final progress reports to licence expiry/full surrender for the period 3/12/1999 to 2/12/2003.
As part of an exploration project targeting possible large-scale opal occurrences hidden at depth beneath marine shale outcrops in the Stuart Range 'Breakaway' country, the subject licence was taken up to cover certain ground lying adjacent to the...-
Document
Published: 25 Jun 1903
-
Mount Willoughby. Annual reports to licence expiry/full surrender for the period 11/1/2001 to 10/1/2005.
Exploration for opal, carried out in an area of the Stuart Range located approximately 130 km north-northwest of Coober Pedy, has included a compilation of geological and opal occurrence data, photogeological interpretation of aerial photographs,...-
Document
-
Olympic Dam Project : operator's reports on hydrogeological investigations, Great Artesian Basin wellfields, for the period 1995-2004.
There is no abstract created for this record-
Document
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 3 partnership DPY3-15, Peake and Denison Inliers western flank Mesozoic sedimentary uranium mineral prospects. Project final report.
Approved PACE Initiative Year 3 drilling proposal DPY3-15 aimed to discover a roll-front style uranium deposit hosted in Mesozoic sandstones flanking the exposed radiogenic Peake and Denison Inliers, that is amenable to mining by in-situ leach...-
Document
Published: 13 Apr 1907
-
Ely Hill and Ant Hill. Combined and separate annual reports to licence expiry/full surrender for the period 10/1/1997 to 17/12/2004.
The subject adjacent licence areas, located approximately 55 km north-northeast of Coober Pedy, were the first tenements taken out for regional opal exploration under the provisions of the newly proclaimed South Australian Opal Mining Act 1997. The...-
Document
Published: 17 Dec 1904
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 3 partnership DPY3-18, Glencoe (Lake Frome East) area roll-front style uranium mineral prospects. Project interim and final reports.
The subject EL 3391 is located in the eastern Lake Frome region, and is prospective for roll-front type uranium mineralisation emplaced within sediments of the Tertiary Lake Eyre Basin. In December 2006, as part of the PACE Initiative Year 3...-
Document
Published: 02 Mar 1907
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 3 partnership DPY3-29, Mount Woods area sandstone-hosted uranium mineral prospects. Project final report.
As part of the PACE Initiative Year 3 collaborative drilling projects between PIRSA and the minerals industry, Goldstream carried out an approved programme of reverse circulation drilling on its Mount Woods area exploration tenements, into selected...-
Document
Published: 18 Dec 1906
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 5 partnership DPY5-07 - northern Gawler Craton - Welbourn Hill and Nicholson Hill magnetic/gravity anomalies IOCG-U mineral prospects. Project final report.
As part of a search for possible high crustal level, Olympic Dam - type IOCG deposits hosted by Mesoproterozoic basement rocks, Eromanga Uranium undertook deep diamond drill testing of two large, semi-coincident magnetic/gravity anomalies recognised...-
Document
-
Peake Creek. Annual reports and final report to licence expiry/full surrender, for the period 16/9/2005 to 15/9/2009.
An area located immediately west of the Denison Inlier of the Proterozoic Peake and Denison Ranges, approximately 70 km south-east of Oodnadatta, was explored for possible roll-front style sedimentary uranium deposits that may have formed within...-
Document
Published: 20 Oct 1909