-
Claude Hills. Second partial surrender report, for the period 4/12/2000 to 19/6/2018.
A 271 square km major portion of the eastern part of EL 5860 Claude Hills, which is located in the extreme north-west of South Australia in the Musgrave Ranges, has now been voluntarily relinquished by licensee Austral Nickel Pty Ltd. This portion of...-
Document
Published: 04 Aug 1918
-
Tallaringa South-east - National Trig Point area (part of the Nawa Domain Project). First partial surrender report at licence expiry/renewal, for the period 29/11/2012 to 28/11/2017.
Portions of a tenement located within the Nawa Domain basement rocks subcrop region of the northern Gawler Craton have recently been relinquished by Woomera Exploration (WEX) in order to meet exploration expenditure compliance conditions of its...-
Document
Published: 08 Mar 1918
-
Data release at first partial surrender on 20/8/1989 : report on investigations into the platinoid potential of the Black Hill Norite, EL 1419, Sedan, SA.
TARGET: Possible primary magmatic platinoid and/or other precious metals deposited at or near the base of expected cumulate layered rock sequences within the Black Hill Norite. EXPLORATION: After making preliminary regional geophysical and drillhole...-
Document
-
Nyllow Hill (near Tumby Bay). Progress and final reports for the period 2/9/88 to 1/9/90.
TARGET: Precious metals, specifically platinum group metals and gold, associated with ultrabasic intrusives and strongly faulted and altered metasediments in the Tumby Bay area. EXPLORATION: Geochemical sampling including rock chip, gravel and BCL...-
Document
-
Nyllow Hill. First partial surrender report for the period 2/9/1988 to 1/9/1989.
The licence was taken out to assess the untested potential for finding platinum group metal occurrences associated with two known ultramafic intrusive plugs outcropping in the Lincoln Uplands, 40 km north-northeast of Port Lincoln. Incidental...-
Document
-
Walker Flat. Progress reports and final report to licence expiry/full surrender, for the period 3/7/1989 to 2/1/1990.
TARGET: Possible buried platinum group metals mineralisation, east of Black Hill. EXPLORATION: Geological reconnaissance, rock chip sampling (3), and three traverses of ground magnetic surveying totalling 18 line km. RESULTS: Magnetic anomaly...-
Document
-
Cambrai. Combined first quarterly / final report to licence full surrender, for the period 1/8/1990 to 21/12/1990.
TARGET: Within a small area centred on Cambrai township, all metallic minerals, but primarily gold which might occur in the Black Hill Norite complex. EXPLORATION: Limited surface rock chip grab geochemical sampling (5) at the Black Hill council...-
Document
-
Mount Davies (part of the Central Giles / Wingellina Nickel Project). First partial surrender report at licence expiry/renewal, for the period 4/3/1999 to 23/9/2018.
The major part of the subject 134 square km total area of tenement ground relinquished from EL 5184 on 23/9/2017 contains the Michael Hills copper prospect (Area 11). A large portion of the remainder of the surrendered ground, in a separate block...-
Document
Published: 31 Oct 1917
-
Data release - as updated [made at SA Director of Mines' discretion] : Mount Caroline, Mount Harcus and Pine Ridge (the Musgrave Project). Joint annual reports for the period 1/7/2011 to 31/12/2018.
Three Exploration Licences spread across the central and eastern Musgrave Ranges are now being explored by NiCul Minerals Limited (a wholly owned subsidiary of PepinNini Minerals Limited) which currently owns 100% of each tenement. The ground held is...-
Document
Published: 28 Feb 1919
-
Data release - as updated [made at SA Director of Mines' discretion] : Nullarbor, Yalata North and Yalata East (the Western Gawler Craton Project). Joint annual reports for the period 24/10/2012 to 2/4/2018.
A cluster of adjoining licence sub-blocks taken up in the Yalata region are being explored for possible buried Thompson Belt style magmatic copper-nickel mineralisation which could be associated with large strike-slip fault structures transecting the...-
Document
-
Data release - as updated [made at SA Director of Mines' discretion] : Fowlers Bay (part of the Western Gawler JV Project). Annual report for the period 9/3/2015 to 8/3/2018.
During the 2015-2016 licence year, the Western Gawler JV Project exploration operator Western Areas Limited (WSA) conducted the first part of a regional reconnaissance bedrock drilling campaign targeting aeromagnetic anomalies which were interpreted...-
Document
-
Teal Flat. Combined first annual report and final report to licence full surrender, for the period 10/6/2010 to 30/11/2011.
A search for possible nickel-copper sulphide and platinoid metal mineralisation hosted in the intrusive Cambro-Ordovician Black Hill norite (gabbroic) complex, located under 50 to 150 m cover of Tertiary Murray Basin sediments in an area situated 40...-
Document
Published: 21 Jun 1911
-
Mount Woodward. Annual reports plus combined 5-year annual/final report to licence expiry/full surrender, for the period 5/3/2001 to 6/10/2012.
There is no abstract created for this record-
Document
-
PACE 2020 Initiative : PACE Targeting, Year 1 partnership no. 19 - Musgrave Project area, SkyTEM helicopter-borne electromagnetic survey. Project PT1-19 final report.
To assist with exploration for possible buried magmatic massive copper-nickel sulphide deposits in Proterozoic Giles Complex ultramafic intrusions within the central Musgrave Province, and to simultaneously provide useful geophysical data for mapping...-
Document
-
Data release [made at SA Director of Mines' discretion] : Hanging Knoll (part of the Central Giles Nickel Project). Annual reports to licence expiry/renewal, for the period 18/3/2002 to 17/3/2007.
A licence area located at the south-eastern end of the Mann Ranges in South Australia's Far North-west Aboriginal Lands, approximately 90 km south-southwest of Ayers Rock (Uluru), is being explored by Rio Tinto Exploration (RTE) and Delta Gold, as...-
Document
Published: 12 Apr 1907
-
Marla (part of the Nawa Domain Project). Annual report and final report to licence expiry/full surrender, for the period 25/6/2013 to 24/6/2015.
No work - reports only contain comments about the Project area's perceived prospectivity.-
Document
Published: 07 Sep 1915
-
Aston Hill (part of the Nawa Domain Project). Annual report and final report to licence surrender, for the period 25/6/2013 to 4/6/2015.
No work - reports only contain comments about the Project area's perceived prospectivity.-
Document
Published: 07 Sep 1915
-
Data release [made at SA Director of Mines’ discretion] due to licence expiry and pending approval of its subsequent re-grant : Pine Ridge (part of the Central Giles Nickel Project). Annual reports for the period 25/2/1999 to 29/3/2007.
A licence area located in South Australia's Far North-west Aboriginal Lands, approximately 140 km north-west of Marla, has been explored by Rio Tinto Exploration (RTE) as part of work planned for a larger set of project exploration licences currently...-
Document
-
The Musgrave Project. Joint annual reports for the period 5/10/2007 to 31/1/2012 [as later updated, to include additional licences, to 31/1/2017], plus respective successive full surrender final reports for individual licences.
The multi-licence Mithril - Barrick JV Musgrave Project area is centred 600 km south-west of Alice Springs, within the APY Lands of north-western South Australia. It is considered to be prospective for buried economic Ni-Cu-PGE sulphide mineral...-
Document
Published: 09 Oct 1917
-
Data release [made at SA Director of Mines' discretion] : Mount Hardy (part of the Central Giles Nickel Project). Annual reports to licence expiry/renewal, for the period 18/3/2002 to 17/3/2007.
A licence area located at the eastern end of the Deering Hills in South Australia's Far North-west Aboriginal Lands, approximately 150 km south-west of Ayers Rock (Uluru), is being explored by Rio Tinto Exploration (RTE) and Delta Gold, as part of...-
Document
Published: 12 Apr 1907