Data release - as updated [made at SA Director of Mines' discretion] : Mutooroo mine, Bonython Hill, Mutooroo West, Oratan [Rock] and Cutana (the Curnamona South Project). Joint annual reports for the period 1/1/2014 to 31/12/2015.
Several separate areas that cover ground straddling the major tectonic boundary between the Olary and Broken Hill domains of the southern Curnamona Province are being explored for possible economic buried stratabound Proterozoic iron ore, epithermal...-
Document
-
Razorback Ridge. Annual reports to licence forfeiture/cancellation, for the period 7/5/2015 to 20/6/2019.
A small licence area centred ~ 28 km south-southeast of Yunta, which consists of two separate sub-blocks, has been explored for possible economic stratabound iron ore mineralisation that could occur within buried glacial tillitic/siltstone strata of...-
Document
-
Uno (part of the Wilcherry Project). First partial surrender report, for the period 29/7/2009 to 24/1/2020.
An area centred ~105 km west-southwest of Port Augusta is being explored for possible economic buried, basement-hosted occurrences of epithermal/hydrothermal/metamorphic gold, silver, iron, uranium, and base metals mineralisation. On the now...-
Document
-
Data release - as updated : Lake Woorong. Annual reports to licence expiry/full surrender, for the period 8/6/2012 to 7/6/2019.
A large area centred ~80 km south-west of Coober Pedy has been explored for possible buried economic iron ore, including inferred DSO haematite mineralisation, and for base metal massive sulphide deposits that may have formed in Proterozoic basement...-
Document
Published: 30 Jul 1919
-
Data release - as updated : Gum Flat, Wanilla, Cummins, Tarlinga and Yeelanna (the Gum Flat Iron Ore Project). Joint annual reports submitted until the joint full surrender of remaining project licences, for the period 1/7/2010 to 18/01/2022.
During 2010-2011, the third year of the Gum Flat Iron Ore Project, owner Lincoln Minerals' exploration activities included: - Planning, site preparation and supervision of an RC and aircore drilling program; - Surveying and vegetation clearing for...-
Document
Published: 09 Jan 1920
-
Mount Carulina and Trapeze Hill (the Oodnadatta Project). Joint annual reports plus succeeding single licence annual reports to licence expiry/full surrender, for the period 6/3/1995 to 12/10/2009. [ Index Part 1 of 2 ].
[ Note - here is Part 1 of the abstract relating to 2 separately indexed parts ]. As an adjunct to its widespread search for possible diamondiferous kimberlite diatremes on its Abminga Project acreage situated nearby to the north-west, Caldera...-
Document
Published: 09 Feb 1910
-
Uno [West] and Eurilla Dam (part of the Wilcherry Hill Project). Third and first partial surrenders' respectively combined report, for the overall period 10/10/2002 to 7/4/2022.
17 square km or ~65% of the former area of EL 5931, and 14 square km or ~12% of the former area of EL 6072, have recently been relinquished due to their now perceived diminished prospectivity for buried base and precious metal mineralisation. Work...-
Document
-
Data release - as updated [made at SA Director of Mines' discretion] : the Tarcoola and Theseus Projects. Joint annual reports for the period 31/5/2010 to 31/12/2014.
A large part of the Harris Greenstone Domain basement tectonostratigraphic block, extending from 10 km to 130 km west of Kingoonya, is being explored for possible buried economic gold, nickel and other base metal mineralisation which may be associated...-
Document
-
PACE Discovery Drilling (drilling partnerships with DSD and industry): Year 8 partnership DPY8-25 - Wilcherry Hill area, Eyre Peninsula, Zealous prospect Mesoproterozoic epithermal calc-silicate skarn Sn-U-Pb-Cu-Ag mineral occurrence. Final report.
Arising out of exploratory drilling carried out by Ironclad Mining in 2012, which aimed to test the shallow subsurface haematite ore potential of an ironstone outcrop located in the central north of the Wilcherry Hill licence area, an unexpected...-
Document
-
Tooligie Hill (latterly part of the Southern Eyre Peninsula JV Project). Final report at licence full surrender, for the period 3/12/1999 to 18/4/2017.
For the period from 1/1/2013 until the date of licence full surrender, the following additional activities were undertaken: - 1/1/2013 to 31/1/2013 – magnetite ore characterisation analyses, and interpretation of 2012 ground gravity survey data,...-
Document
Published: 14 Jun 1917
-
Data release - as updated : Mutooroo (part of the Border Project). Annual reports [but excluding three separately held joint annual reports] and final report to licence expiry/full surrender, for the period 3/4/2007 to 18/4/2020.
During licence Year 11 (2007-2008), exploration activities on renewed EL 3745 included: • acquiring 1.9 line km of TEM profiles at Dingo prospect; • acquiring 21.4 line km of ground magnetic survey coverage at 1-metre station spacing on three...-
Document
-
Warrina North, Warrina South, Mount Brady, Yarrabolina Hill, Mount Woods and Kangaroo Dam (the Mount Woods JV Project). Joint annual reports [on JV partners' independent exploration programmes] for the period 1/5/2010 to 31/1/2017.
During the 2011-2012 project reporting period, exploration activities within the Mount Woods Project area which were conducted by OZL primarily targeted IOCG style mineralisation. Work included: · a continuation of office-based target generation and...-
Document
-
Data release - as updated [made at SA Director of Mines’ discretion] : Hawks Nest. Annual reports for the period 8/4/2009 to 14/4/2019.
During the 2009-2010 reporting year, as part of the strategy to significantly advance the future development of the Hawks Nest Iron Ore Project, Western Plains Resources (WPG) successfully concluded a series of complex joint venture negotiations with...-
Document
Published: 01 Jun 1918
-
Jubilee Dams. Final report at licence full surrender, for the period 11/8/1977 to 14/12/1977.
A programme of ground magnetic surveying along 7 short traverses, plus air/mud drag-bit percussion drilling (5 vertical open holes totalling 509 m) was used to investigate a set of previously untested discrete aeromagnetic high anomalies covered by...-
Document
Published: 02 Dec 1977
-
Report on rotary-percussion drilling, Mount McTaggart copper prospect, SML 575, South Australia, [carried out in] October 1971.
The Mount McTaggart prospect is located 15 miles south-west of Arkaroola Base Camp and 3 miles west of the Arkaroola-Balcanoona Road. A programme of ten rotary percussion holes totalling 3457 feet commenced on 11/10/1971 and was completed on...-
Document
-
Data release [made at SA Director of Mines’ discretion] : Tarkarooloo. First annual report for the period 14/8/2002 to 13/8/2003.
There is no abstract created for this record-
Document
Published: 20 Oct 1903
-
Data release - as updated : Robin Rise. Annual reports plus final report to licence expiry/full surrender, for the period 9/5/2005 to 20/6/2019.
The Robin Rise exploration licence, centred approximately 35 km south-southwest of Coober Pedy, covers portions of the Palaeoproterozoic basement domain known as the Coober Pedy Ridge, an east-northeast trending magnetic block of variable magnetic...-
Document
Published: 30 Jul 1919
-
Green Patch. Annual reports for the period 3/12/2001 to 30/5/2006, plus the last six years of tenure' combined annual reports/final report ('no work' letter only) to licence expiry/full surrender, for the period 1/2/2015 to 31/8/2021.
An area centred on the hamlet of Green Patch, located ~10 km north-west of Port Lincoln, was taken up to appraise the iron ore potential of known near surface BIF magnetite mineralisation occurring at the Greenpatch (sic) prospect that had been...-
Document
Published: 16 Oct 1921
-
Data release - as updated [made at SA Director of Mines’ discretion] : Pondooma. Annual and combined annual reports for the period 3/12/2002 to 2/12/2005.
Exploration Licence 3048 Pondooma, consisting of two separate sub-blocks that are centred ~60 km south-west of Whyalla, is located immediately west of the Middleback Range and 5 km west of Onesteel’s Iron Duke mine. This licence was granted to SA...-
Document
-
The Southern Eyre Peninsula JV Project. Joint annual reports for the reporting period 1/7/2006 to 31/1/2017, plus licence-specific final reports submitted at their later full surrenders.
During the first year of the project (2006-2007), no work was undertaken on ELs 3731, 3421 or 3611. On EL 3317 Wilgerup, at the Wilgerup North Pod, Centrex undertook 2 phases of RC drilling totalling 135 holes for 12,829 m to provide information to...-
Document
Published: 09 Apr 1919