-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 4 partnership DPY4-19, Murninnie mine area (north-eastern Spencer Domain) IOCG mineral prospects. Project final report.
The Murninnie Cu-Bi-Au deposit and mine environs, located approximately 40 km south-west of Whyalla, have not been seriously explored in more than 50 years due to quarantining of the deposit under Private Mine title. The lode-style deposit is exposed...-
Document
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 3 partnership DPY3-59, Kalkaroo Dome fault-hosted gold mineral prospects. Project final report.
The main aim of Havilah Exploration's PACE Initiative Year 3 approved drilling programme was to test the east-west trending, quartz-veined breccia zone that passes through the central Kalkaroo Dome, specifically in the footwall of the Kalkaroo Cu-Au...-
Document
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 3 partnership DPY3-14, Pernatty Lagoon area (eastern Gawler Craton) IOCG mineral prospects. Project final report.
PACE proposal DPY3-14 aimed to discover a new iron oxide - associated copper-gold (IOCG) mineralised magmatic centre, similar to the Olympic Dam setting, within the eastern margin of the Gawler Craton. The Pernatty Lagoon project is located less than...-
Document
Published: 20 Sep 1906
-
West Woomera. Annual reports and progress reports to licence expiry/full surrender, for the period 31/5/2000 to 30/5/2005.
Copper-gold exploration undertaken over a small area within the Woomera Prohibited Area, 20 km west of Woomera township, was restricted to carrying out geophysical data interpretation and conceptual modelling for generating drill targets based around...-
Document
Published: 29 Nov 1904
-
Bopeechee, Cadnia Hill, Hedley Hill, Andamooka, Stuart Creek and Ferguson Hill (Lake Torrens Project). Third partial surrender report for the period 16/11/2000 to 31/12/2004.
Exploration for possible intra-basement iron oxide - associated copper-gold-uranium deposits and for stratabound Mississippi Valley style base metal deposits within the regolith on the now relinquished portions of the project's combined exploration...-
Document
Published: 20 Mar 1906
-
Coonalpyn (part of the Coonalpyn Joint Venture Project). Annual reports to licence expiry/full surrender for the period 16/10/2006 to 15/10/2008.
To investigate the possible Cu-Ni-PGE mineral sulphide mineralisation potential of a known buried mafic / ultramafic layered igneous intrusive complex situated near Ki Ki in the upper South-East, as well as exploring for base metal mineralisation...-
Document
Published: 13 Nov 1908
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 4 partnership DPY4-25, eastern Mabel Creek High: Big North-West Proterozoic epithermal / hydrothermal IOCG mineral prospect. Project interim and final reports.
In its successful application to PIRSA for a grant of PACE Initiative Year 4 drilling project funding, Alliance Craton Explorer announced that it had generated an extremely attractive geophysical target with potential for Mesoproterozoic basement -...-
Document
Published: 25 Nov 1907
-
National Trig Station area. Annual reports and final report to licence expiry/full surrender, for the period 25/10/2002 to 24/10/2006.
No field work was able to be carried out on the subject licence owing to a protracted legal dispute between the joint venture companies involved, which was finally settled in 2006. Subsequent exploration emphasis was directed elsewhere by the...-
Document
Published: 22 Aug 1907
-
Botenella Range (now part of the Wilcherry Hill JV Project). Progress, annual and final reports to the commencement of the project licences' combined reporting status, for the period 14/2/1991 to 18/9/2002.
Exploration of an area lying west of Lake Gilles concentrated initially on assessing its potential for hosting syngenetic Palaeoproterozoic stratiform base metal deposits along perceived stratigraphic extensions of the beds containing the recently...-
Document
Published: 16 Oct 1903
-
Unlocking South Australia's Mineral and Energy Potential - A Plan for Accelerating Exploration. Theme 2 (drilling partnerships with PIRSA and industry) : Year 2 partnership no. DPY2-14, Willow IOCG mineral prospect. Project interim and final reports.
Bimbowrie EL 3278 is located within the Palaeoproterozoic Olary Domain of the Curnamona Province, South Australia. The property is prospective for a variety of mineralisation styles including granite batholith primary (hard-rock) uranium, Broken Hill...-
Document
-
Gawler Project Central Tenement Block [Part]. Data release at licences' joint partial surrender: Southern Gold gold exploration JV - specific annual reports 6/2/2006 to 30/6/2009. [Index Part 2 of 2].
After the Southern Gold joint venture agreement was signed in February 2006, that company as JV operator performed a due diligence review of Dominion Mining's exploration data, did some orientation soil calcrete and biogeochemical sampling at Typhoon...-
Document
Published: 02 Feb 1910
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 3 partnership DPY3-04, Churchill Dam area iron oxide - associated copper-gold and uranium mineral prospect. Project interim and final reports.
EL 3511 licensee Debnal and its joint venture partner Venture Minerals are exploring an area of the eastern Gawler Craton having a predicted high potential for the discovery of Olympic Dam type iron oxide - associated copper-gold-uranium (IOCG-U)...-
Document
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 1 partnership DPY1-46, western Gawler Range Volcanic Province mineral prospects. Project interim and final reports.
An area of the Gawler Range Volcanic Province that straddles the southern portion of the Yarlbrinda Shear Zone, 80 km south of Kingoonya, and which contains mylonitised and sericite-altered Palaeoroterozoic intrusive rocks, was the target for three...-
Document
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 2 partnership DPY2-17, Mount Moulden and Mount Harcus mineral prospects. Project final report.
As part of the PACE Year 2 collaboration between PIRSA and the minerals industry, PepinNini Minerals proposed and was granted part subsidy funding for an extensive drilling programme in the western APY Aboriginal Lands of South Australia, to examine...-
Document
Published: 16 Jun 1906
-
Mount Toodla. Data release made at licence expiry/renewal as a reduced area : annual reports for the period 12/4/2000 to 11/4/2005.
Exploration for possible buried Olympic Dam style Cu-Au-U-REE deposits in Proterozoic basement on the eastern flanks of the Peake and Denison Ranges, in an area located approximately 65 km south-east of Oodnadatta, has concentrated on a very large...-
Document
-
Ki Ki (part of the Coonalpyn Joint Venture Project). Annual reports and final report to licence expiry/full surrender, for the period 14/10/1999 to 17/1/2009.
To investigate the possible Cu-Ni-PGE mineral sulphide mineralisation potential of a known buried mafic / ultramafic layered igneous intrusive complex situated within the Cambrian Kanmantoo Trough near Ki Ki in the upper South-East, the licensee and...-
Document
Published: 23 Feb 1909
-
Roopena. Second partial surrender report, for the period 31/7/2000 to 26/10/2007.
Exploration of two now-relinquished licence sub-areas situated a short distance west of Port Augusta and Whyalla respectively, near the eastern edge of the Middleback Range, sought to find possible economic buried epithermal/hydrothermal gold deposits...-
Document
Published: 29 Oct 1908
-
Pinda Springs. Annual and final reports to licence expiry/full surrender for the period 20/1/2004 to 19/1/2009.
Exploration for possible economic stratabound or hydrothermal base and precious metal deposits associated with the Pinda Springs Diapir has addressed a north-easterly trending fault zone and lesser related faults that transect the diapir, on the...-
Document
-
Unlocking South Australia's Mineral and Energy Potential - A Plan for Accelerating Exploration. Theme 2 (drilling partnerships with PIRSA and industry) : Year 2 partnership no. DPY2-40, Soyuz gold / copper-gold mineral prospect. Project final report.
Previous exploratory work by Grenfell Resources and Gravity Capital at the Soyuz prospect in the Carnding area, located approximately 25 km west-northwest of Tarcoola, has included ground magnetic, gravity and soil sampling programmes that defined a...-
Document
Published: 15 Jun 1906
-
Screech-Owl Creek (part of Lake Torrens Project). Final report at licence surrender for the period 14/6/2000 to 20/4/2006.
Possible economic Neoproterozoic stratiform / hydrothermal copper mineralisation hidden under Mesozoic and Recent sedimentary cover was targeted in an area located approximately 95 km north-east of Andamooka. Aeromagnetic data interpretation of some...-
Document