RB 51/00052 Progress report on survey of stone deposits for the proposed River Murray storage - EWS Department.
The report describes the progress made to September 1st 1960 of a survey of stone deposits within a 50 mile radius of the Chowilla Damsite. It is concluded that only shallow deposits of variable quality will be available within 30 miles of the site...-
Document
Published: 01 Jan 1960
-
RB 87/00035 Overland Corner Limestone (Cornerstone) Quarry mineral tenure, production and geology, sections 33, 73, 75, Hd Parcoola, Co. Young.
Cornerstone quarry, 180 km NE of Adelaide, was excavated in Miocene Morgan Limestone in the northern bank of the Murray River for building stone to construct the Overland Corner Hotel in 1858. From 1945 to 1958, 6 000 tonnes of ashlars were produced...-
Document
Published: 01 Feb 1987
-
RB 72/00140 Monarto town area - Construction materials and foundation conditions.
A proposed new city referred to as Murray New Town, with a possible population of 250 000, is to be built in the Murray Bridge area, west of the Murray River. The city will-occupy an area of approximately 175 sq miles; (450 km2). This report has been...-
Document
Published: 27 Jul 1972
-
RB 61/00082 Chowilla Dam Project: materials investigation, Devlin Pound quarry site. Geological report.
A quarry site at Devlin Pound has been explored by four diamond drill holes totalling 360 feet in depth. Drilling shows that hard limestone occurs in thin bands in the upper 75ft. of the sequence of shallow marine sediments. To recover this rock it...-
Document
Published: 01 Jan 1965
-
RB 75/00011 Monarto construction sand investigation progress report no. 1, Tepko sand deposit - Monarto Development Commission.
Reconnaissance auger drilling for construction sand to supply the proposed new city of Monarto was carried out in the Tepko-Mannum and Hartley-Monarto South areas in 1974 The programme consisted of 79 holes 0.6m to15m deep for a total of 451m. Grain...-
Document
Published: 01 Jan 1975
-
RB 74/00005 Proposed subdivision, Murray Bridge, pt secns 65, 66 Hd Mobilong. Report on geological investigations - State Planning Office (Docket 2477/73).
A proposed subdivision at Murray Bridge has been examined with reference to the suitability of the site for residential development. The site is covered by up to 0.30 metres of silt soil overlying calcrete capped limestone and calcareous sandstone...-
Document
Published: 01 Jan 1974
-
RB 74/00084 Construction materials resources, Monarto area.
There is no abstract created for this record-
Document
Published: 01 Jan 1977
-
RB 75/00143 Monarto coarse aggregate investigation limestone and gneiss drilling and testing. Client - Monarto Development Commission.
Sources of coarse aggregate were investigated for the Monarto Development Commission. Recrystallised limestone near Murray Bridge was tested by four diamond drill holes, and gneisses near Pallamana were tested by 8 holes. Large quantities of suitable...-
Document
Published: 01 Jan 1975
-
Waikerie. Annual reports and final report to licence expiry/full surrender, for the period 18/1/2005 to 17/1/2010.
Landmark Stone Pty Ltd was approached by David West (Executive Director, Architectural Conservation, International Conservation Services of Sydney) to investigate re-opening one of the three Waikerie Limestone quarries in the Riverland of South...-
Document
Published: 28 Oct 2009