-
Data release [made at SA Director of Mines’ discretion] : Uley graphite deposit. Proposed open cut mine and ore processing plant. Mining study reports submitted during 1988.
Formal mining proposal documents submitted to PIRSA for approval as part of the process of re-opening the Uley graphite mine to sustain a planned 10 years duration open pit mining operation.-
Document
Published: 01 Jan 1988
-
Data release - as updated [made at SA Director of Mines' discretion] : Brimpton Lake. Annual reports for the period 9/2/2005 to 8/8/2018.
An area of the southern Gawler Craton, which is located on Eyre Peninsula east of Elliston, is continuing to be explored for possible economic buried Archaean to Proterozoic bedrock-hosted primary base and precious metal deposits of inferred...-
Document
-
PACE Copper Discovery Drilling (drilling partnerships with DSD and industry): Year 9 partnership DPY9-42 - Mount Woods Project area, Gawler Craton: assessing the potential for ISGC style mineralisation within the Mount Woods Inlier. Drilling final report
Historically, exploration undertaken for finding Iron Oxide - associated Copper-Gold (IOCG) mineralisation on the eastern Gawler Craton, over the long period since the discovery of the Olympic Dam deposit in July 1975, has targeted positive gravity...-
Document
-
Cootra. Progress and final reports to licence surrender for the period 25/11/80 to 28/3/84.
Pioneer exploration for possible stratabound base metal deposits that have a facies relationship to metamorphic iron deposits, which was carried out in the Cootra area, located 20 km east south-east of Warramboo on central Eyre Peninsula, has...-
Document
Published: 09 Apr 1984
-
Data release - as updated [made at SA Director of Mines’ discretion] : Waddikee. Annual reports for the period 24/5/2010 to 31/1/2018.
During licence Year 6, on renewed EL 4662, Monax and its JV earn-in partner OMM undertook auger soil geochemical sampling, ground magnetic and IP surveys, and exploratory drilling in their continuing search for economic iron ore and manganese...-
Document
-
PACE Copper Discovery Drilling (drilling partnerships with DSD and industry): Year 9 partnership DPY9-11, Thurlga Ramp, northern edge of Cleve Domain, volcanic epithermal / hydrothermal replacement type precious metal prospects. Drilling final report.
A licence area, which lies adjacent on the west to Investigator Resources' Peterlumbo Hill EL 5368 containing the Paris silver deposit (where there is a currently inferred resource of 42 Moz @ 139 ppm Ag), is being explored under a joint venture with...-
Document
-
Sleaford Mere. First annual report, plus final report to licence expiry/full surrender, for the period 19/6/2014 to 18/6/2016.
Exploration of an area extending for ~9 km along the western, shore-land side of the Sleaford Mere lagoon, located near the southern tip of Eyre Peninsula, has mainly sought to identify possible untested buried graphite occurrences which could be...-
Document
-
River Wakefield - Blyth area. First and final report at licence surrender for the period 10/8/1977 to 9/3/1978.
In a search for possible economic, near-surface Zambian Copperbelt - style syngenetic, stratiform base metal deposits, geochemical samples were taken at 2 m intervals from 39 shallow auger boreholes drilled to an average depth of 14 m into Lower...-
Document
-
Mount Woods. Combined first progress/final report at licence full surrender, for the period 6/9/1979 to 5/12/1979.
Following an evaluation of existing subsurface data, 9 vertical percussion holes totalling 670 m were drilled to test discrete gravity anomalies in the Mount Woods area, in a search for Olympic Dam type mineralisation. The holes encountered...-
Document
-
Barossa - Kersbrook - Birdwood - Mount Pleasant, and Kuitpo - Hope Forest - Mount Monster - Yankalilla areas (Southern Adelaide Hills Project). Progress and final reports to licence surrender for the period 1/12/1962 to 1/5/1966.
A substantial part of the central and southern Adelaide Hills, in the vicinity of the margins of Archaean basement inliers, was taken up by a Tennant Creek (NT) - based gold mining company to explore for possible buried economic gold and base metal...-
Document
Published: 27 Sep 1967
-
Moseley Nobs (part of the Northern Eyre Peninsula Project). Final report at licence full surrender, for the period 3/3/2008 to 22/11/2019.
A small area originally comprising three separate parts centred ~20 km north of Kimba on northern Eyre Peninsula has been explored for possible economic Middleback Range type stratabound BIF hosted iron ore, for shear-hosted or Menninnie Dam style...-
Document
Published: 06 Dec 2019
-
Thurlga Ramp (part of the Eyre Peninsula Project, Corrobinnie Uranium JV and Thurlga JV periods). Data release : final report at licence expiry/full surrender, for the period 1/1/2013 to 3/5/2019.
During the report period, licensee Andromeda Metals did no on-ground exploration. During its agreed 3-year earn-in period, joint venturer Investigator Resources undertook the following work described herein: - acquisition of high resolution aerial...-
Document
Published: 19 Jul 2019
-
Data release - as updated [made at SA Director of Mines' discretion] : Uley. Annual reports for the period 16/9/2005 to 12/10/2018.
A licence area located 20 km west-southwest of Port Lincoln, which covers the historically worked Uley graphite deposit and environs, was taken up to try to delineate sufficient mineral resources and, eventually, ore reserves of graphite in the Mining...-
Document
Published: 25 Mar 2019
-
Tallaringa and Jindivic Bore. Joint annual reports to licences' combined expiry/full surrender, for the period 30/7/2007 to 12/8/2013.
A search for possible economic buried IOCG mineralisation which might exist within a widespread region of sparsely explored ?Archaean to Mesoproterozoic high grade metamorphic basement terrain, which underlies three licence sub-areas located 100-180...-
Document
Published: 30 Aug 2013
-
Data release - as updated [made at SA Director of Mines' discretion] : Middlecamp Hills. Annual reports for the period 30/6/2009 to 29/6/2019.
Two small areas have been taken up in the Cleve Uplands district to explore structurally interesting portions of the Lower and Upper Middleback Jaspilite stratigraphic units for possible economic buried copper, gold, manganese and iron ore...-
Document
Published: 06 Aug 2018
-
Lake Gilles (latterly part of the Northern Eyre Peninsula Project). Annual reports until the commencement of project licences' joint reporting, plus the final report, for the respective periods 13/2/2007 to 31/5/2010 and 1/6/2014 to 31/5/2015.
A licence area originally comprising three separate sub-blocks located along the northern and southern sides of the Lake Gilles Conservation Park has been explored by grant licensee Lincoln Minerals Ltd (LML) and its joint venture partner IronClad...-
Document
Published: 19 Jun 2015
-
Data release - as updated [made at SA Director of Mines’ discretion] : Karkarook. Combined annual and annual reports to licence expiry/renewal/full surrender, for the period 24/6/2004 to 1/9/2014.
A area centred ~ 25 km west of Cleve is being explored for possible buried economic sediment-hosted or basement unconformity - related uranium mineralisation. The tenement covers part of the Driver River and Driver River Pan which contains a...-
Document
Published: 26 Sep 2014
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 3 partnership DPY3-01, Central Eyre Peninsula (Karkarook area) Mesoproterozoic unconformity - style sedimentary uranium mineral prospects. Project interim and final reports.
Investigation of the potential of a known surface radiometrically-anomalous area 20 km west-southwest of Cleve to contain unconformity - style uranium mineralisation, inferred to occur at and just above the subsurface stratigraphic contact of...-
Document
Published: 31 Mar 2007
-
Data release - as updated [made at SA Director of Mines' discretion] : Wild Horse Plain. Annual reports for the period 8/7/2005 to 23/2/2019, plus partial surrender reports to 23/2/2021.
An upland area located approximately 100 km south-west of Whyalla on the eastern Eyre Peninsula, and with its eastern boundary running parallel to the coast at a distance of 15 km from Cowell and Franklin Harbour, is being explored for uranium,...-
Document
Published: 11 Jan 2021
-
Data release - as updated - Cowell (latterly part of the Cowell JV Project). Annual reports and final report to licence expiry/full surrender, for the period 7/11/2011 to 6/11/2017.
During licence Year 10 to 6th November 2012, exploration work undertaken by JV partner Renaissance Uranium (RNU) comprised the drilling of five rotary mud-diamond drill holes targeting five local geophysical anomalies within the Glensea Prospect,...-
Document
Published: 15 Nov 2017