RB 97/00009 South Australian Steel and Energy Project. Coober Pedy iron ore investigation. Peculiar Knob prospect.
As part of the South Australian Steel and Energy Project, MESA has targeted significant aeromagnetic anomalies in the search for a possible iron ore resource. At Peculiar Knob prospect, previous company exploratory drilling in 1985 of such a magnetic...-
Document
Published: 01 Feb 1997
-
RB 95/00037 Stonefield bedrock drilling, 1995.
Twenty-three vertical open RC drillholes with a total penetration of 2663 m were drilled by MESA during February and March 1995 along four W-E traverses in the Stonefield area near Truro, to determine bedrock geology and geochemistry below sedimentary...-
Document
Published: 01 May 1997
-
Port Broughton, Redhill and Mount Remarkable - Port Augusta areas (part of the Moonta North Project ELs combined reporting group). Annual reports and joint final report at licences' surrender, for the period 19/4/2002 to 22/5/2006.
Economic deposits of iron-oxide associated copper-gold mineralisation of the Moonta-Wallaroo or Olympic Dam style, hosted in Palaeoproterozoic basement rocks of the Moonta Sub-domain, were targeted by exploration in three now surrendered licences,...-
Document
-
Mabel Creek. Annual reports submitted until the commencement of joint licence reporting on the Mabel Creek JV Project tenements, for the period 20/12/1999 to 23/3/2006.
Exploration currently underway for possible economic buried iron oxide - associated copper-gold (IOCG) mineralisation within Proterozoic basement on the Mabel Creek High, in one of two joint venture group project licence areas located approximately 50...-
Document
-
Data release - as updated : Edward Creek (part of the Edward Creek Joint Venture Project). Annual reports and final report to licence expiry/full surrender, for the period 23/9/2008 to 11/11/2018.
Reedy Lagoon Corp. (RLC) has continued to look for minerals other than diamond, operating as the manager of exploration work for base metals (mainly copper) and uranium that was undertaken by the Edward Creek Base Metal Joint Venture (“ECBMJV”) during...-
Document
-
Pine Ridge (part of the Central Giles Nickel Project). Annual reports and final report to licence surrender, for the period 30/3/2007 to 9/6/2015.
A licence area located in South Australia's Far North-west Aboriginal Lands, approximately 140 km north-west of Marla, has been explored primarily for massive magmatic nickel sulphide deposits possibly associated with the Proterozoic Giles Complex...-
Document
-
PACE Discovery Drilling (drilling partnerships with DSD and industry): Year 8 partnership DPY8-09 - Margaret Dam, southern margin, Peake and Denison Inliers, kimberlite diamond prospect. Drilling project final report.
Monax Alliance's Margaret Dam Project is located on their EL 5347 Francis Creek, which is centred approximately 40 km south of William Creek in northern South Australia. The initial project work done for licence operator Monax Mining by geophysical...-
Document
-
Safari, Lake Woorong, Leonard Rise, Thunderstorm Creek and Brumby Creek areas (Coober Pedy Ridge Project). Quarterly and six-monthly progress, plus annual and final, joint activity reports for the period 22/4/1991 to 22/3/2000.
The Coober Pedy Ridge / Mount Woods Inlier project investigated a 170 km long east-west belt of medium to high grade Proterozoic metamophics and syn- and post tectonic granites, centred 25 km south of Coober Pedy, for Broken Hill type stratiform...-
Document
-
Data release - as updated [made at SA Director of Mines’ discretion] : Kalabity. Annual reports for the period 25/2/2009 to 11/3/2019.
The main exploration activities undertaken during the first year of tenure of renewed EL 4239 (licence Year 6, 2009-2010) consisted of drill testing of uraniferous prospects defined by previous exploration, after the prior acquisition of an airborne...-
Document
-
Data release [made at SA Director of Mines' discretion] : Acropolis South and North Roxby. Joint annual reports for the period 26/4/2003 to 3/5/2009.
Exploration for possible economic deposits of buried, Mesoproterozoic basement-hosted IOCG-U style mineralisation is being conducted over two separate multiple-block licence areas in the Olympic Dam district, EL 2931 (Acropolis South) and EL 2932...-
Document
-
Data release - as updated [made at SA Director of Mines' discretion] : Brimpton Lake. Annual reports for the period 9/2/2005 to 8/8/2018.
An area of the southern Gawler Craton, which is located on Eyre Peninsula east of Elliston, is continuing to be explored for possible economic buried Archaean to Proterozoic bedrock-hosted primary base and precious metal deposits of inferred...-
Document
-
Eastern Mabel Creek Ridge (part of the Mabel Creek Project). Final report for exploratory drilling programme, Project ADI RD01-135 [part of Accelerated Discovery Initiative Round 1, 2021].
The Mabel Creek Ridge, which is situated adjacent to the central eastern margin of the Gawler Craton, is an ENE trending ridge of shallowly covered basement rock which displays high magnetic and gravity relief. The ADI Round 1 work proposal submitted...-
Document
-
Mount Eba. Progress reports and final report to licence full surrender, for the period 10/1/1986 to 1/12/1989.
TARGET: Possible shallowly buried, igneous intrusive-related epithermal or hydrothermal gold and base metal deposits in the Lake Labyrinth - Earea Dam region, north and west of Kingoonya. EXPLORATION: Acquisition of aerial magnetic and radiometric...-
Document
Published: 14 Dec 1989
-
The Adelaide Hills Project (now including the former Fleurieu Project tenements). Annual reports for the period 1/10/2013 to 30/11/2018 plus expiry/full surrender reports to 7/10/2023.
During the twelfth, 2013-2014 project year, work on the now combined licence holdings of the Terramin Group focussed on prospect evaluation done at Bird-in-Hand (environmental and hydrological studies), Wheal Barton and Golden Slope, plus the ongoing...-
Document
-
Data release - as updated [made at SA Director of Mines' discretion] : Nullarbor, Yalata North and Yalata East (the Western Gawler Craton Project). Joint annual reports for the period 24/10/2012 to 2/4/2018.
A cluster of adjoining licence sub-blocks taken up in the Yalata region are being explored for possible buried Thompson Belt style magmatic copper-nickel mineralisation which could be associated with large strike-slip fault structures transecting the...-
Document
-
Stuart Shelf Project. EL 1338 first [and Project second overall] partial surrender report, for the period 2/5/1975 to 16/6/1991.
TARGET: Possible buried base and precious metal deposits associated with aeromagnetic anomalies, and also with either coincident or unrelated gravity anomalies, lying within a relinquished sector of the large contiguous multi-licence area that Western...-
Document
-
Woorong Creek. Data release : annual reports submitted until the commencement of joint licence reporting on the Mabel Creek JV Project tenements, for the period 1/6/2000 to 23/3/2006.
Exploration currently underway for possible economic buried iron oxide - associated copper-gold (IOCG) mineralisation within Proterozoic basement on the Mabel Creek High, in one of two joint venture group project licence areas located approximately 45...-
Document
-
Lyons [Siding] [formerly called Rounsevell Hill]. Third partial surrender report, for the period 25/10/2002 to 2/12/2008.
As part of a regional search for possible economic IOCG type mineralisation in an area of covered Hiltaba Suite granitic intrusions north-west of Tarcoola, EL 3994 (formerly EL 3040) was covered by a regional gravity survey in September-October 2005,...-
Document
-
Warriner Creek. Second partial surrender report, for the period 20/12/1999 to 8/2/2009.
Exploration for possible economic buried iron oxide - associated copper-gold (IOCG) deposits in two areas located approximately 100 km south-east of Coober Pedy has sought to delineate and test a number of linear and elliptical geophysical anomalies...-
Document
-
Mount Norwest (part of the Willouran Ranges Project). Annual reports to licence expiry/cancellation, for the period 8/9/2010 to 7/9/2013.
A search primarily directed at assessing the stratiform copper and magnesite potential of an area centred 50 km south-west of Marree has consisted mainly of office studies comprising the collection and review of open file geoscientific data. Early in...-
Document