-
South Vivian [Homestead]. Annual reports and final report to licence expiry/full surrender, for the period 12/6/2007 to 11/6/2009.
An area located on the northern Stuart Shelf between Olympic Dam and Prominent Hill, approx. 50 km south-southwest of the latter, has been explored for possible Olympic Dam type iron oxide - associated copper-gold (IOCG) deposits and for Canadian...-
Document
Published: 17 Oct 1909
-
Coondambo. Second partial surrender report, for the period 7/6/2001 to 6/6/2009.
As part of a search for possible buried economic Olympic Dam type IOCG-U deposits in volcanic basement, or for stratiform Athabasca Basin type uranium occurrences in the overlying cover, farminee Marathon Resources carried out detailed calcrete...-
Document
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 3 partnership DPY3-38, Central Gawler Gold Province, Barns West and Baggy Green North gold prospects. [8 x RC drillholes] Project final report.
PACE Initiative Year 3 drilling project funds were secured by Adelaide Resources to evaluate a number of previously detected IP anomalies inferred to originate from sources in the Mesoproterozoic basement and saprolitic cover in the vicinity of the...-
Document
-
Pyramid Bore. Annual reports and final report to licence full surrender, for the period 8/7/2005 to 5/1/2010.
An area located approximately 10 km north of Glendambo has been explored for possible economic buried uranium deposits which might be indicated by aerial radiometric anomalies associated with playa lakes in the region, since these latter mark zones of...-
Document
Published: 20 May 1910
-
Childara Well. Annual reports and final report to licence expiry/full surrender, for the period 19/2/2004 to 18/2/2009.
An area lying along the south-western margin of the Gawler Ranges has been explored by Minotaur Resources to assess the economic iron oxide - associated copper-gold mineralisation (IOCG) potential of near-coincident gravity and magnetic anomalies that...-
Document
Published: 23 Mar 1909
-
Mount Miccollo, Tin Hut Hill, Eurilla Dam, Wilcherry Hill, Uno, Peterlumbo and Mount Double (the Wilcherry Hill Project). Joint annual reports for the period 1/11/2002 to 31/10/2018.
During Year 6 of the project, Trafford Resources designed their drilling program to test the extent of the Pb/Zn/Ag/U mineralisation at the Telephone Dam Prospect, while JV partners Ironclad Mining’s drilling program was designed to define the Direct...-
Document
-
Mount Ive Gate. Annual reports to licence expiry/full surrender, for the period 12/7/1993 to 22/9/2001.
The area of ELs 1841/2551 (formerly EL 1568), located approximately 70 km north-west of Kimba on the northern Eyre Peninsula, was considered to be prospective for Olympic Dam type Cu-Au and Menninnie Dam style Pb-Zn mineralisation. Earlier work by...-
Document
Published: 15 Nov 1900
-
Stony Top Hill (part of the Gairdner Project). Annual reports and final report to licence expiry/full surrender, for the period 7/10/2010 to 6/10/2014.
An area centred ~17 km south-east of Kingoonya has been explored for possible buried IOCG deposits that could relate to the very large "Shellback" regional magnetic anomaly located in the south-eastern Kingoonya district. Farminee AngloGold's...-
Document
Published: 21 Oct 1914
-
Kingoonya. Annual reports and final report to licence full surrender, for the period 27/11/2006 to 21/4/2015.
An area surrounding the township of Kingoonya and straddling the Trans Australia Railway line, that comprises six tenement sub-blocks,has been explored for possible economic occurrences of buried Tertiary roll-front style secondary uranium...-
Document
Published: 23 Apr 1915
-
Data release - as updated [made at SA Director of Mines’ discretion] : Nonning (latterly part of Terramin's Menninnie Zinc Project). Annual reports for the period 30/3/2006 to 30/11/2012.
An area centred ~70 km north of Kimba, which also lies about 7 km north of the Menninnie Dam lead-zinc-silver deposit, was taken up to explore for possible buried economic volcanic epithermal/hydrothermal Mesoproterozoic Fe-rich Cu-Au mineralisation...-
Document
-
Woomera and Wirrappa. Annual reports and first joint annual report, plus final report to licences' joint full surrender, for the period 14/1/2013 to 13/11/2018.
Two adjacent areas located immediately south and east of Woomera township were taken up to search for possible buried economic stratabound deposits of copper or other metals that may have formed in the Neoproterozoic and Mesoproterozoic cover sequence...-
Document
Published: 07 Jan 1919
-
Mount Miccollo (part of the Wilcherry Project). Second and third partial surrender report, for the period 10/6/2011 to 27/5/2021.
An area centred ~100 km west of Port Augusta is being explored for possible economic buried, basement-hosted occurrences of epithermal/hydrothermal/metamorphic gold, silver, iron, uranium, and base metals mineralisation. On the now relinquished...-
Document
-
Data release - as updated [made at SA Director of Mines' discretion] : Morgans (part of the East Eyre Peninsula Project). Annual reports for the period 17/1/2012 to 16/1/2019.
An area of mainly covered bedrock consisting of two separate sub-blocks bordering the south-eastern Gawler Ranges, which is considered prospective for finding buried hypogene IOCG mineralisation and possible stratiform and metamorphic base metals in a...-
Document
Published: 21 Mar 1918
-
Uno (part of the Wilcherry Project). First partial surrender report, for the period 29/7/2009 to 24/1/2020.
An area centred ~105 km west-southwest of Port Augusta is being explored for possible economic buried, basement-hosted occurrences of epithermal/hydrothermal/metamorphic gold, silver, iron, uranium, and base metals mineralisation. On the now...-
Document
-
PACE Discovery Drilling (drilling partnerships with DSD and industry): Year 8 partnership DPY8-31 - Peterlumbo Hill area, Eyre Peninsula, skarn and/or porphyry type Mesoproterozoic epithermal Cu-Au and Ag-base metal prospects. Drilling final report.
Investigator Resources (IVR) applied on 30/1/2015 to participate in the PACE Initiative Year 8 (2015) collaborative drilling grant program between industry and government being administered by DSD. The application for subsidy funds submitted by IVR...-
Document
Published: 20 Jan 1916
-
Data release - as updated [made at SA Director of Mines discretion]: the Eyre Peninsula Project. Joint annual reports for the period 29/12/2013 to 28/12/2018.
During the 2014 project reporting year, licensee Adelaide Resources undertook a research and development phase surface-based biogeochemical and field portable X ray fluorescence (FPXRF) spectrometric sampling programme over its Baggy Green gold...-
Document
Published: 22 Apr 1919
-
PACE Copper Discovery Drilling (drilling partnerships with DSD and industry): Year 9 partnership DPY9-24 - Nankivel Hill area, Eyre Peninsula, skarn and/or porphyry type Mesoproterozoic epithermal Cu-Au and Ag-base metal prospects. Drilling final report.
Investigator Resources Limited (IVR) is continuing to explore its contiguous tenement package in the Southern Gawler Ranges for economic precious and base metals, following its discovery of the Paris silver deposit in 2011. A prospective region called...-
Document
Published: 20 Jun 1917
-
Eureka Bluff. Annual reports and combined 4th-5th annual/final report to licence expiry/full surrender, for the period 29/11/2005 to 28/11/2010.
An area located 50 km north-northeast of Wudinna, and situated on the southern margin of the Gawler Ranges, has been explored for possible economic deposits of both Olympic Dam style epithermal copper-gold-uranium and Tanami style orogenic lode gold,...-
Document
Published: 28 Feb 1911
-
Centre Hill (the Kingoonya JV Project). Annual reports to licence expiry/full surrender, for the period 7/3/2006 to 10/5/2012.
An area extending for approximately 80-115 km south-east of Tarcoola has been explored for possible economic mesothermal gold±copper mineralisation formed in Mesoproterozoic igneous basement, possible unconformity - related uranium mineralisation at...-
Document
Published: 12 Jul 1912
-
Kingoonya. Second partial surrender report, for the period 27/11/2006 to 26/11/2013.
The total area of a multi-part tenement, EL 4882 centred on Kingoonya township, has recently been significantly reduced via voluntary relinquishment made by licensee Hiltaba Gold. The relinquishment comprises parts of Blocks A and E, and the whole of...-
Document
Published: 06 Mar 1914