-
Rudall. Progress and final reports to licence surrender for the period 10/9/1971 to 9/9/1972.
In a search for possible economic primary or secondary uranium deposits in the Rudall area, five streambed mud samples and 2 springwater samples from the Driver River drainage basin were analysed for Central Pacific Minerals by the Australian Atomic...-
Document
Published: 02 Nov 1972
-
RB 60/00025 Geological report no. 1 on Brennand anomaly, Hd Koppio, southern Eyre Peninsula, Cummins 1-mile sheet.
A potential iron ore deposit has been investigated in the upper horizon of jaspilite beds of the Hutchison Group, where a drag fold has caused a thickening of the jaspilite beds. Surface samples average 42.2% acid soluble iron. The deposit has a...-
Document
Published: 08 Feb 1965
-
Lake Gilles. Progress reports to licence expiry/full surrender, for the period 19/5/1969 to 18/5/1970.
Exploration for possible economic hypogene base metal sulphide deposits associated with poorly exposed iron-rich linear outcrops, overlying faulted Archaean to Palaeoproterozoic basement which is obscured by extensive Cainozoic sedimentary cover rocks...-
Document
Published: 01 Apr 1970
-
Data release - as updated [made at SA Director of Mines’ discretion] : Carappee Hill. Annual reports for the period 20/2/2010 to 19/2/2019.
The continuation during 2010 of exploration of the Palaeoproterozoic bedrock in a small area located 60 km west-northwest of Cowell has mainly consisted of the conduct of three shallow drilling campaigns and the examination and analysis of downhole...-
Document
Published: 25 Feb 1919
-
Data release [made at SA Director of Mines’ discretion] : Gum Flat. Annual reports submitted prior to the commencement of joint reporting on the Gum Flat Iron Ore Project, for the period 27/9/2005 to 26/9/2008.
An area lying immediately west of Port Lincoln and extending for ~10 km inland is being explored for buried occurrences of multiple metallic mineral commodities that may have been deposited within faulted, folded and metamorphosed Archaean basement...-
Document
Published: 20 Nov 1907
-
Moseley Nobs (part of the East Eyre Peninsula Project). Third partial surrender report, for the period 5/7/2006 to 4/7/2015.
EL 4860 has been part of the Investigator Resources Ltd tenement holding since that company was spun-off from Southern Gold in 2007 (as Sunthe Uranium Ltd). The Eastern Eyre Peninsula project group of licences, which lie along and just beyond the...-
Document
Published: 08 Oct 1915
-
Data release - as updated [made at SA Director of Mines’ discretion] : Mount Kolendo [not "Taringa"] (part of the Menninnie Zinc Project). Annual reports for the period 21/2/2011 to 20/2/2013.
An area located adjacent to the southern margin of the Gawler Ranges, that includes some exposures of Mesoproterozoic Gawler Range Volcanics (GRV), and which at its southern boundary lies approximately 15 km north-east of the Menninnie Dam Pb-Zn-Ag...-
Document
-
Barna Hill (part of the East Eyre Peninsula Project). Annual reports to licence expiry/full surrender, for the period 27/4/2011 to 26/4/2018.
An area located ~20 km east-southeast of Kimba was taken up to explore for possible buried economic base and precious metals which could be related to regional scale NW to NE lineaments and basement structural corridors that are evident from regional...-
Document
Published: 05 Jun 1918
-
Data release - as updated : Mount Nott. Annual reports to licence expiry/full surrender, for the period 17/1/2012 to 16/1/2019.
An area located ~100 km north-west of Kimba, on the southern margin of the Gawler Ranges, is being explored by Investigator Resources for a variety of styles and types of precious and base metal epithermal mineralisation that may have formed in...-
Document
Published: 26 Mar 1919
-
Port Lincoln. Progress and final reports to licence surrender for the period 15/4/1968 to 28/2/1970.
As part of uranium exploration being carried out over the oldest basement rocks forming inliers to the south-eastern Gawler Craton, an airborne scintiilometer survey was flown across the Port Lincoln district during November-December 1968 along...-
Document
-
Data release - as updated [made at SA Director of Mines' discretion] : Kolendo, Taringa, Nonning, Wipipippee and Menninnie Dam (the Menninnie Project). Joint annual reports for the period 1/1/2013 to 31/12/2016.
The Menninnie JV Project area consists of five contiguous exploration licences, and is considered prospective for Pb-Zn-Ag-Cu-Au-Mo-U deposits associated with past epithermal, porphyry, IOCG and skarn - forming geological environments. It lies in a...-
Document
-
Barna Hill (part of the East Eyre Peninsula Project). First partial surrender report for the period 27/4/2011 to 26/4/2013.
Exploration done on the now relinquished eastern and southern bounding parts of EL 4726, which lie close to the north-western shore of Lake Gilles, consisted only of a subset of regional reconnaissance soil sampling (68 samples taken on a 1 km x 1 km...-
Document
Published: 18 Apr 1913
-
Port Lincoln - Kimba area. Progress reports to licence expiry/full surrender, for the period 1/11/1967 to 31/10/1969.
The possible areal extent and potential in-ground resources of secondary kaolin developed from deep lateritic weathering of Early Proterozoic basement rocks on central-eastern Eyre Peninsula were investigated by the licensee, with a view to obtaining...-
Document
-
Nilginee Dam. Annual reports to licence expiry/renewal for the period 15/3/1993 to 14/3/1998.
A low-lying small area situated 40 km west of Whyalla has been explored primarily for economic gypsum occurrences within Recent surficial sediments, while latterly, a search for metallic minerals has also commenced, via a geological survey of basement...-
Document
-
Moseley Nobs (part of the Eastern Eyre Peninsula Project). Second partial surrender report at licence expiry/renewal, for the period 5/7/2006 to 4/7/2011.
An area located approximately 40 km north-northwest of Kimba is being explored primarily for possible buried basement-hosted Olympic Dam style iron oxide - associated copper-gold(-uranium) deposits, as well as for fault-related vein style uranium...-
Document
Published: 09 Sep 1911
-
Data release - as updated [made at SA Director of Mines' discretion] : Kimba Gap, Ironstone Hut, Ironstone Hill, Stony Hill, Gilles Downs and Minbrie areas (the Northern Eyre Peninsula Project). Joint annual reports for the period 2/12/2005 to 31/1/2013.
Exploration for possible economic occurrences of magnetite and/or haematite iron ore formed in concealed Proterozoic basement to the west of the Middleback Range is being carried out by Northern Eyre Peninsula Project (NEPP) joint venturer Centrex...-
Document
-
Peterlumbo, Botenella Range, Lake Gilles [West], Eurilla Dam, Wilcherry Hill, Uno, Mount Miccollo and Tin Hut Hill (the Wilcherry Hill Project). Joint annual reports for the period 6/6/2002 to 31/10/2008. [Index Part 1 of 2].
Aquila Resources took up ownership of the much previously-explored ground comprising the Wilcherry Hill Project with the intent of exploring for the first time the iron oxide - associated copper-gold & uranium (IOCG-U) mineralisation potential of...-
Document
Published: 31 Dec 1908
-
Yalanda Hill. Annual reports and final report to licence full surrender, for the period 5/12/2005 to 20/3/2014.
Exploration for possible economic deposits of primary uranium mineralisation, undertaken within the subject licence which is centred approximately 90 km south-west of Whyalla, initially consisted of a field reconnaissance using a spectrometer, and...-
Document
-
Data release [made at SA Director of Mines’ discretion] : Verran. Annual reports to licence expiry/renewal, for the period 4/4/1997 to 3/4/2002.
Part of the Cleve Uplands centred 15 km west of Cleve has been taken under licence to explore its potential for buried economic copper-gold mineralisation to occur within Archaean or Proterozoic basement rocks. Other possible commodities of interest...-
Document
Published: 05 Sep 1902
-
Data release - as updated : Moonabie (part of the East Eyre Peninsula Project). Annual reports plus final report to licence expiry/full surrender, for the period 1/5/2006 to 13/3/2017.
A licence consisting of three separate sub-blocks that are centred approximately 60 km WSW of Whyalla is being explored for possible economic primary uranium mineralisation plus precious and base metals, in a structurally complex epithermal and...-
Document
Published: 29 Apr 1917