Petroleum geochemistry of the Otway Basin, and the significance of coastal bitumen strandings on adjacent southern Australian beaches. Volumes 1 to 5 source rock studies.
The standing of crude oil on the beaches of southern Australia was first recorded approximately 150 years ago. This material, known locally as coastal bitumen, was used by the early maritime visitors and settlers to caulk their vessels and is the...-
Document
-
RB 77/00080 Kalangadoo town water supply. Well completion report, Kalangadoo TWS no. 1 (MA 94).
Kalangdoo Town Water Supply (T.W.S.) No. 1 well was drilled cable tool during February - May, 1977, and subsequently production tested. The unconfined Gambier Limestone aquifer was encountered between 5.5 and 86m, and was later cemented off down to...-
Document
Published: 01 Jan 1977
-
RB 80/00024 Kalangadoo town water supply. Completion report well no. 2.
This second well into the confined aquifer was drilled to 117.5 metres completed with a well screen in an unconsolidated sand interval between 104.2 and 115.6 metres. A yield of 1 200 kl/day was obtained with potential for greater yields without...-
Document
Published: 01 Mar 1980
-
RB 82/00051 Management proposal for the groundwater resources along the State border of South Australia and Victoria.
The groundwater licensing authorities in the States of South Australia and Victoria recognize that future development of the lands adjacent to the border will depend on the groundwater resource underlying those lands. In most areas there, shallow...-
Document
Published: 01 Jul 1982
-
RB 86/00043 Creosote investigation. Woods and Forests Department - Mount Gambier.
Groundwater analysis from 17 wells has detected elevated concentrations of Cu,Cr, As and creosote in the unconfined aquifer at the State Mill, resulting from the discharge of contaminated storm water or septic tank effluent. The contaminated...-
Document
Published: 01 Jul 1986
-
RB 86/00047 Honeysuckle Flat (Caroline) limestone deposit, sections 538, 539, Hundred Caroline, County Grey.
Geological mapping and drilling have proved 2 100 000 tonnes of high purity limestone. Large additional reserves are available to the south. The deposit is required to supplement depleted reserves in existing Marte quarry. The Gambier Limestone is...-
Document
Published: 01 Jul 1986
-
RB 84/00084 Kongorong groundwater pollution investigation.
An SA government investigation has been undertaken to determine the extent of groundwater pollution resulting from the waste disposal practices used at the now abandoned Kongorong cheese factory. During the period 1924 to 1971, liquid effluent from...-
Document
Published: 01 Oct 1984
-
RB 88/00002 Review of Gambier Limestone - Geology, uses, specifications and production.
The Marte area, 10 km west of Mount Gambier is the largest producer of building stone in Australia. Reviews production of ashlars from Gambier Limestone with emphasis on the Mount Gambier area; coverage is incomplete for production of ashlars from the...-
Document
Published: 01 Jan 1988
-
RB 82/00033 Determination of transmissivity from airlift and recovery.
Reliable values of transmissivity and permeability can be obtained by analysing residual drawdown data after airlifting in small diameter wells at a constant discharge rate. Considerable savings in drilling costs could be achieved in regional water...-
Document
Published: 01 May 1982
-
RB 78/00083A Extractive industry towards a planning philosophy.
New production water well has suitable water supply for all purposes. Nitrate levels are not serious (10 - 22 mg/L).-
Document
Published: 01 Jan 1978
-
RB 78/00041 Naracoorte planning study engineering geology investigations - B. Turner and Associates.
Naracoorte Corporation area straddles two northwesterly trending dune ridges and their corresponding flats. Cemented limestones of the Bridgewater Formation and Gambier Limestone, occasionally mantled by windblown sands, form the two ridges; younger...-
Document
Published: 01 Jan 1978
-
RB 78/00036 Kingston town water supply completion report for well no. 11 - EWS Department.
New production water well was drilled to 71 metres.-
Document
Published: 01 Jan 1978
-
RB 79/00021 Foundation drilling at Robe slipway - Lake Butler.
Foundation testing for a building project at Robe aimed at strengthening the existing slipway has shown the presence of medium strength Bridgewater Formation limestone at a depth of less than 2 m, which should provide an adequate bearing horizon for...-
Document
Published: 01 Jan 1979
-
RB 79/00034 Hydrogeological investigations, Apcel Pty Ltd, Snuggery. Report no. 3.
Drilling and testing of a new groundwater production well APCEL 14 at Snuggery has indicated a production rate of about 8000 cubic m/day (80,000 gallons per hour), which should have only minimal effects on groundwater levels in both the upper...-
Document
Published: 01 Jan 1979
-
RB 79/00060 Groundwater resources for South-East town water supplies - Review no. 4, Millicent.
Six wells exploiting the lower (confined) portion of the Gambier Limestone aquifer currently provide groundwater for Millicent?s reticulated water supply. Four of the six wells could be substantially upgraded in well yield by equipping them with...-
Document
Published: 01 Jan 1979
-
RB 79/00076 Naracoorte town water supply, completion report for well no. 10 - EWS Department.
A new town water supply well, Naracoorte no. 10, encountered permeable confined aquifer sands at 160 m depth. Subsequent testing showed the well to have a yield of from 6000 to 7000 cubic m/day at a recommended pump intake depth of 85 m, with less...-
Document
Published: 01 Jan 1979
-
RB 77/00131 South-East water resources: Mount Gambier area groundwater investigations. Progress report to January 1977.
Hydrogeological investigations have intensified in the Mount Gambier area, with emphasis on town water supplies, pollution monitoring and the confined aquifer. The transition from the Underground Waters Preservation Act to the Water Resources Act has...-
Document
Published: 01 Jan 1977
-
RB 93/00014 Blue Lake hydrogeological investigation progress report no. 1. Assessment of available hydrogeological data.
The Blue Lake is a valued water resource for the City of Mt Gambier and there is increasing community concern regarding its longer term sustainable use. The lake is groundwater fed and there is known contamination of the unconfined aquifer in the...-
Document
Published: 01 Mar 1993
-
RB 94/00038 Groundwater recharge assessment of Zones 4A and 5A - Border Designated Area.
Further investigations have been undertaken within certain areas along the State Border of South Australia and Victoria to assess both vertical groundwater recharge rates and their spatial variability, based on surficial geology, groundwater and land...-
Document
Published: 01 Oct 1994
-
RB 98/00025 Hydrochemistry of groundwaters in the South Australian-Victorian Designated Area - Groundwater Border Agreement Act.
Hydrochemical data from a total of 165 bores along the 40 kilometre wide strip of the South Australian - Victorian Border Designated Area were used to provide a spatial, and temporal, hydrochemical framework of the groundwaters from the three main...-
Document
Published: 01 Jun 1998