-
RB 78/00097 Engenina adamellite and Balta granite of the Mount Woods Inlier.
There is no abstract created for this record-
Document
Published: 11 Aug 1978
-
RB 97/00008 South Australian Steel and Energy Project. Coober Pedy iron ore investigation. Regional bedrock drilling 1995.
Following the acquisition and interpretation of 435 line km of ground magnetic surveys over selected aeromagnetic anomalies within regions of high magnetic relief on the northern Gawler Craton, 121 reverse circulation holes totalling 8609.25 m were...-
Document
Published: 01 Jan 1997
-
Mabel Creek. Annual reports submitted until the commencement of joint licence reporting on the Mabel Creek JV Project tenements, for the period 20/12/1999 to 23/3/2006.
Exploration currently underway for possible economic buried iron oxide - associated copper-gold (IOCG) mineralisation within Proterozoic basement on the Mabel Creek High, in one of two joint venture group project licence areas located approximately 50...-
Document
-
Data release [made at SA Director of Mines' discretion] : Kangaroo Dam (part of the Mount Woods JV Project). Annual reports to licence expiry/renewal, for the period 19/10/2000 to 6/11/2010. [ Index Part 1 of 2 ].
The large Kangaroo Dam exploration licence covers the mostly concealed western portion of the Palaeoproterozoic Mount Woods Inlier, a large block of variable magnetic intensity lying to the east and south-east of the Coober Pedy Ridge and the Mabel...-
Document
-
Balta Baltana Creek. Annual reports to licence expiry/full surrender, for the period 11/8/2016 to 10/8/2021.
A small area centred ~95 km east-southeast of Coober Pedy has been explored for possible buried Olympic Dam style IOCG mineralisation, epigenetic and stratiform base metal deposits and structurally controlled Tennant Creek style orogenic lode gold...-
Document
Published: 22 Oct 1921
-
Safari, Lake Woorong, Leonard Rise, Thunderstorm Creek and Brumby Creek areas (Coober Pedy Ridge Project). Quarterly and six-monthly progress, plus annual and final, joint activity reports for the period 22/4/1991 to 22/3/2000.
The Coober Pedy Ridge / Mount Woods Inlier project investigated a 170 km long east-west belt of medium to high grade Proterozoic metamophics and syn- and post tectonic granites, centred 25 km south of Coober Pedy, for Broken Hill type stratiform...-
Document
-
Data release - as updated : Lake Woorong. Annual reports to licence expiry/full surrender, for the period 8/6/2012 to 7/6/2019.
A large area centred ~80 km south-west of Coober Pedy has been explored for possible buried economic iron ore, including inferred DSO haematite mineralisation, and for base metal massive sulphide deposits that may have formed in Proterozoic basement...-
Document
Published: 30 Jul 1919
-
Data release - as updated [made at SA Director of Mines’ discretion] : Lake Phillipson. Annual reports to licence expiry/renewal, for the period 27/4/2000 to 8/8/2010.
During the sixth licence year, on renewed EL 2717 covering the same area as previously, the licensee, now a wholly owned subsidiary of AuIron Energy Limited (formerly Meekatharra Minerals Limited), progressed its investigations of the geology of the...-
Document
Published: 01 Sep 1916
-
Data release - as updated [made at SA Director of Mines’ discretion] : Lake Phillipson. Annual reports to licence expiry/renewal, for the period 9/8/2010 to 8/8/2015.
During licence Year 16, on its renewed EL 4534 over the period October to December 2010, South Australian Coal Limited (SA Coal) undertook a drilling campaign of 15 rotary mud partly cored vertical holes for 2871 m which included 2064.7 m of coring,...-
Document
Published: 01 Sep 1916
-
Warrina North, Warrina South, Mount Brady, Yarrabolina Hill, Mount Woods and Kangaroo Dam (the Mount Woods JV Project). Joint annual reports [on JV partners' independent exploration programmes] for the period 1/5/2010 to 31/1/2017.
During the 2011-2012 project reporting period, exploration activities within the Mount Woods Project area which were conducted by OZL primarily targeted IOCG style mineralisation. Work included: · a continuation of office-based target generation and...-
Document
-
Engenina Creek - Mount Brady and Balta Baltana Creek areas, south-east of Coober Pedy. Progress reports and final annual report to licences' expiry/full surrender, for the period 6/4/1981 to 23/6/1993.
{ELs 822, 1145, 1494 programme}: TARGET: Roxby Downs and Tennant Creek - style copper, gold, and uranium, plus diamonds in kimberlite diatremes and metamorphic and hydrothermal breccia - related iron ore, in the Engenina Creek area, 60 km south-east...-
Document
Published: 24 Jul 1993
-
RB 2022/00007 40Ar/39Ar geochronology from AuScope National Argon Map samples, Gawler Craton, South Australia.
The National Argon Map was an AuScope-funded pilot project (2020–2021). The project aimed to compile a national-scale map of and to analyse new samples to fill the gaps in national coverage in 40Ar/39Ar geochronology. This report provides the results...-
Document
Published: 01 Jul 2022
-
Woorong Creek. Data release : annual reports submitted until the commencement of joint licence reporting on the Mabel Creek JV Project tenements, for the period 1/6/2000 to 23/3/2006.
Exploration currently underway for possible economic buried iron oxide - associated copper-gold (IOCG) mineralisation within Proterozoic basement on the Mabel Creek High, in one of two joint venture group project licence areas located approximately 45...-
Document
-
Data release - as updated : Robin Rise. Annual reports plus final report to licence expiry/full surrender, for the period 9/5/2005 to 20/6/2019.
The Robin Rise exploration licence, centred approximately 35 km south-southwest of Coober Pedy, covers portions of the Palaeoproterozoic basement domain known as the Coober Pedy Ridge, an east-northeast trending magnetic block of variable magnetic...-
Document
Published: 30 Jul 1919
-
Giddi Giddinna Creek (part of the Coober Pedy Project). First partial surrender report, for the period 1/5/2013 to 30/4/2015.
An area centred approximately 40 km north-west of Coober Pedy is being explored for possible buried economic IOCG type mineralisation, following in the footsteps of other recent explorers there who were unable to commit to completing significant...-
Document
Published: 30 Mar 1915
-
RB 2001/00006 Reconnaissance sampling of basement rocks of the Gawler Craton, South Australia, for dimension stone.
Eighty-five sites of crystalline basement rocks on the Gawler Craton were inspected to determine which lithological or stratigraphical units have potential for use as dimension stone. The Gawler Craton contains a variety of rock types including...-
Document
Published: 01 Oct 2000
-
Data release [made at SA Director of Mines' discretion] : Painted Hill, Birthday Hill, White Hill, Mount Hawker and The Twins (the Mount Woods Project). Progress and combined annual reports for the period 27/11/1987 to 31/12/2007. [ Index Part 1 of 4 ].
A multi-licence area located between 65 km and 170 km south-east of Coober Pedy was taken up to explore for possible economic precious and base metal deposits that might lie concealed within shallow Proterozoic basement. Exploration activity during...-
Document
-
Data release - as updated [made at SA Director of Mines' discretion] : Painted Hill, Birthday Hill, White Hill, Mount Hawker, The Twins and Balta Baltana (the Mount Woods Project). Joint annual reports for the period 1/1/2011 to 31/12/2018.
Exploration activities undertaken on the Mount Woods Project during 2011 comprised: - ongoing target generation and geological interpretation - continued geological and structural interpretation of the Mount Woods Inlier - drilling of 80 rotary...-
Document
Published: 28 Feb 1919
-
Painted Hill, Birthday Hill, White Hill, Mount Hawker and The Twins (the Mount Woods Project, then the Coober Pedy Project). Progress and combined annual reports for the period 27/11/1987 to 31/12/2007. [ Index Part 2 of 4 ].
After Poseidon Exploration took over the management of ELs 1448 and 1465 in November 1991 as a result of a supplementary farm-in agreement made with Burmine, whereby Poseidon would fund the next two year's of exploration to earn Burmine's 50% interest...-
Document
-
RB 2020/00013 Gawler Craton Airborne Geophysical Survey Region 8B, Billa Kalina – Enhanced geophysical imagery and magnetic source depth models.
This report presents the results of a study jointly conducted by the Geological Survey of South Australia and CSIRO Mineral Resources which aimed to enhance the expression of geological structure in geophysical images and to derive depth to magnetic...-
Document
Published: 01 Apr 2020
- ZIP,