-
Antro, Ameroo, Plumbago, Telechie Dam and Pimpena (the North Ltd Olary Project). Joint annual reports and final report to licences' joint surrender, for the period 12/7/1993 to 24/9/1996.
Exploration for Broken Hill style stratiform Zn-Pb-Ag and/or Roxby Downs - Cloncurry style discordant Cu-Au and Zn deposits, in the Bimbowrie - MacDonald Hill - Telechie Dam - Boolcoomata area, north-west of Olary, comprised ground magnetic and...-
Document
-
Emu Dam (formerly Billeroo West). Data release in lieu of partial relinquishment upon licence renewal (as EL 2878) : annual reports for the period 4/11/1996 to 3/11/2001.
Exploration for possible economic Early Proterozoic stratabound Pb-Zn-Ag deposits of Broken Hill type, and for Olympic Dam style, Middle Proterozoic Benagerie Ridge volcanogenic sediment - hosted, epithermal / hydrothermal Cu-Au-Mo(-U) occurrences of...-
Document
-
Kalabity (part of the Strathearn Joint Venture Project). Data release at licence expiry/full surrender : progress reports and annual reports for the period 4/7/1988 to 15/10/2003.
The initial manager of the joint venture, CRA Exploration Pty Ltd (CRAE), targeted a range of copper, gold and uranium mineralisation styles, including vein-style uranium associated with carbonate rocks (Kintyre model), Olympic Dam style...-
Document
-
Curnamona Province.
CURNAMONA PROVINCE SUMMARY Age: Sedimentation - late Palaeoproterozoic to early Mesoproterozoic. Felsic and mafic volcanism - late Palaeoproterozoic to early Mesoproterozoic. Granitic intrusion - late Palaeoproterozoic to early...-
Document
Published: 01 Jan 2003
-
South Eagle. Progress and annual reports for the period 22/6/87 to 21/12/90 [i.e. to the start of the joint reporting on ELs 1352, 1382, 1412 and 1487].
Exploration for possible buried, stratiform, Palaeoproterozoic Willyama Group Ag-Pb-Zn ore deposits, over an area located 8-20 km north to north-northeast of Boolcoomata Homestead, comprised ground magnetic, Sirotem and IP surveys plus petrology,...-
Document
-
Kalkaroo. Annual reports plus final report to licence expiry/full surrender, for the period 11/7/1994 to 14/7/2000.
Exploration work carried out 60 km north-west of Broken Hill initially sought Olympic Dam type Fe oxide Cu-Au mineralisation associated with granitoid equivalents of the Hiltaba Suite, and subsequently, Ernest Henry style stratiform Pb-Zn-Ag...-
Document
-
Drew Hill. First partial surrender report at licence expiry/renewal, for the period 4/10/1989 to 3/2/1994.
Exploration undertaken in the relinquished portion of a licence area located north-east of Olary, searching for possible economic Palaeoproterozoic stratiform base and precious metal deposits, has comprised a 2526 line km detailed aerial magnetic and...-
Document
-
Macdonald Hill. Progress reports and final report to licence expiry/full surrender, for the period 13/11/1979 to 12/11/1980.
Base metal exploration carried out over an area extending from 8 to 20 km north-northeast of Olary has consisted of a in-depth technical review of past exploration results, plus limited 1:10,000 scale geological mapping, bulk sampling of...-
Document
-
Benagerie (part of the Benagerie Ridge Joint Venture Project). Progress and annual reports to the commencement of multi-licence joint reporting on the Curnamona Joint Venture Project, for the period 2/5/1989 to 3/5/2003. [Index Part 1 of 3].
An area of sparsely explored, Tertiary and Cretaceous sediment and soil-covered Proterozoic bedrock centred approximately 80 km north of Olary is being explored primarily for base metal massive sulphide deposits. The underlying Benagerie Ridge...-
Document
Published: 19 May 1903
-
Data release [made at SA Director of Mines' discretion] : Mutooroo. Annual reports to licence expiry/renewal, for the period 16/1/1997 to 2/4/2007. [ Index Part 1 of 2 ].
Palaeoproterozoic Willyama Supergroup metasediments, intrusive igneous rocks and volcanic rocks, plus Mesoproterozoic granitoids and associated mafic dykes, which occupy the south-western corner of the Broken Hill basement domain in an area centred...-
Document
-
Kalabity. Annual reports and final report to licence expiry/full surrender, for the period 18/11/2000 to 28/3/2014.
An area situated ~100 km west of Broken Hill has been explored for buried base and precious metals epigenetic mineralisation that might have formed within Palaeoproterozoic meta-igneous and metasedimentary basement rocks of the north-eastern Olary...-
Document
-
Data release [made at SA Director of Mines' discretion] : Bulloo Creek [ not Bulloo South ] (part of the Drew Hill Joint Venture Project). Annual reports to licence expiry/renewal, for the period 17/6/1994 to 28/9/2005.
Exploration for Kalkaroo or Portia style copper-gold deposits, and for Broken Hill type stratiform lead-zinc-silver deposits, both possibly formed within the Palaeoproterozoic basement intrusive rocks and high grade metasediments in an area lying...-
Document
-
RB 2009/00018 BHEI 2009 - OLARY field excursion to Ameroo Hill, Tommie Wattie [Bore] and the Walparuta Inlier. [September 25-26, 2009].
The Curnamona Province is the southern remnant of the Palaeoproterozoic Pb-Zn belt, and represents but a small fragment of the original superbasin. Geological data supports the idea of the basin being a rift, with sediments in the Broken Hill Domain...-
Document
Published: 01 Sep 2009
-
Lake Charles area. Data release made in lieu of a partial relinquishment of ground at licence expiry/renewal : progress and annual reports for the period 20/10/1993 to 30/8/1998.
Exploration of an area of the Olary Block centred 100 km north of Mingary is targeting possible economic buried analogues of Mount Isa Block, Western Succession - type stratiform Pb-Zn-Ag mineralisation associated with Palaeoproterozoic metasediments...-
Document
Published: 22 Sep 1998
-
Mulyungarie (part of the Yarramba Joint Venture Project). Data release upon first partial relinquishment and in consequence of a transfer of licence ownership : progress and technical reports for the period 4/7/1978 to 2/5/1991. [ Index Part 2 of 2 ].
After the signing of a new joint venture agreement for the three Yarramba Project tenements (EL 1004 South Eagle, EL 1352 Strathearn and the subject EL 1060 Mulyungarie) in early 1986, the CSR-led partners began exploration for possible Olympic Dam -...-
Document
Published: 31 May 1991
-
Macdonald Hill. First annual report for the period 12/7/1993 to 11/7/1994.
Exploration for Cloncurry and Broken Hill-style Cu-Au and Zn deposits in the Ameroo Hill-McDonald Hill area, north-west of Olary, comprised the acquisition of ground magnetic surveys, detailed geological mapping and the resultant interpretation of...-
Document
-
Mulyungarie. Data release at first partial surrender: annual reports for the period 1/12/2000 to 30/11/2004.
Exploration of an area of shallowly covered Curnamona Province metalliferous basement rocks abutting the South Australia / New South Wales border, approximately 80 km north-east of Olary, has addressed good potential for discovering a range of base...-
Document
Published: 01 Dec 1904
-
Plumbago (part of North Ltd's Olary Project tenements that were surrendered on 24/9/1996). First annual report for the period 1/6/1994 to 31/5/1995.
Exploration for Cloncurry and Broken Hill - style Cu-Au and Zn deposits, in the Plumbago - Bimbowrie - MacDonald Hill - Telechie Dam - Boolcoomata area, north-west of Olary, comprised ground magnetic surveys over anomalies evident from aeromagnetic...-
Document