-
Gravity and magnetic analysis Lagoon Hill area, South Australia. Appendix 1 in progress report for the period ended 3/11/1973.
There is no abstract created for this record-
Document
Published: 01 Jan 1973
-
Lake Phillipson area. Progress and technical reports for the periods 23/11/1978 to 22/11/1980, and 12/2/1981 to 11/5/1982. [forms Part 2 of a SADME - compiled Lake Phillipson coal deposit data package released in December 1994].
The licensee's 1981 coal search programme at Lake Phillipson had the following objectives: - delineation of the total extent of the coal measures; - resolution of seam stratigraphy and correlation of seams between the Main and West Areas; -...-
Document
-
Millers Creek Homestead. Progress reports and final report to licence expiry/full surrender, for the period 13/3/1980 to 28/3/1986.
Following a review of existing regional geophysical and geological data for the north-western Stuart Shelf, grid-based gravity and ground magnetic surveys were run to further outline two broad gravity highs associated with discrete magnetic anomalies,...-
Document
-
RB 86/00065 Bopeechee Seismic Survey, operations and processing report.
A high resolution seismic reflection survey was completed by SADME on the SW margin of the Great Artesian Basin near Lake Eyre South. 38.9 line km of data was recorded from 17.9.85 to 14.12.85. Geophysical Service Inc. (Adelaide) were contracted for...-
Document
Published: 01 Sep 1986
-
RB 91/00041 Geology of the KINGOONYA 1:250 000 map sheet area.
Extensive field geological mapping, augmented by petrological and geochemical studies, reinterpretation of company drilling and water-bore logs and a nine-hole drilling programme has detailed the geology of the KINGOONYA area. The stratigraphy spans...-
Document
Published: 01 Apr 1991
-
RB 89/00066 GAB field survey - 1986/1987.
Data collected from 116 flowing and 24 non-flowing wells included shut in pressure, temperature, flow rate, pH, headworks condition and full chemical analyses of water samples. An observation network is to monitor controlled flowing wells every 2 years.-
Document
Published: 01 Aug 1989
-
RB 90/00014 Explanatory Notes for the TALLARINGA 1:250 000 geological map.
There is no abstract created for this record-
Document
Published: 01 Mar 1991
-
RB 91/00052 Ruby Hill 1. Well completion report.
SADME stratigraphic drillhole Ruby Hill 1 was sited 10.4 km east of William Creek, and was designed to penetrate Early Cretaceous rocks of the Eromanga Basin and to sample pre-Mesozoic basement. It intersected 191 m of the Eromanga Basin sedimentary...-
Document
Published: 01 May 1991
-
Mount Carulina and Trapeze Hill (the Oodnadatta Project). Joint annual reports plus succeeding single licence annual reports to licence expiry/full surrender, for the period 6/3/1995 to 12/10/2009. [ Index Part 2 of 2 ].
[ Note - here is Part 2 of the abstract relating to 2 separately indexed parts ]. A new joint venture with Barrick Gold, pertaining to the renewed (as EL 3424) tenement, was signed on 8/2/2007, after which that company as operator undertook a 749...-
Document
Published: 09 Feb 1910
-
Mabel Creek. Annual and final progress reports to licence expiry/full surrender for the period 3/12/1999 to 2/12/2003.
As part of an exploration project targeting possible large-scale opal occurrences hidden at depth beneath marine shale outcrops in the Stuart Range 'Breakaway' country, the subject licence was taken up to cover certain ground lying adjacent to the...-
Document
Published: 25 Jun 1903
-
Mount Willoughby. Annual reports to licence expiry/full surrender for the period 11/1/2001 to 10/1/2005.
Exploration for opal, carried out in an area of the Stuart Range located approximately 130 km north-northwest of Coober Pedy, has included a compilation of geological and opal occurrence data, photogeological interpretation of aerial photographs,...-
Document
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 3 partnership DPY3-15, Peake and Denison Inliers western flank Mesozoic sedimentary uranium mineral prospects. Project final report.
Approved PACE Initiative Year 3 drilling proposal DPY3-15 aimed to discover a roll-front style uranium deposit hosted in Mesozoic sandstones flanking the exposed radiogenic Peake and Denison Inliers, that is amenable to mining by in-situ leach...-
Document
Published: 13 Apr 1907
-
Ely Hill and Ant Hill. Combined and separate annual reports to licence expiry/full surrender for the period 10/1/1997 to 17/12/2004.
The subject adjacent licence areas, located approximately 55 km north-northeast of Coober Pedy, were the first tenements taken out for regional opal exploration under the provisions of the newly proclaimed South Australian Opal Mining Act 1997. The...-
Document
Published: 17 Dec 1904
-
Marla, Alberga River and Mount Weir areas (part of the Abminga Project). Combined final report at licences' joint surrender, for the period 21/6/2006 to 2/4/2009.
A basinal region located in the vicinity of Marla and extending for approximately 75 km to the north north-east, that borders the Musgrave Province, has been explored by farminee Eromanga Uranium under a joint venture agreement with licensee Maximus...-
Document
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 5 partnership DPY5-07 - northern Gawler Craton - Welbourn Hill and Nicholson Hill magnetic/gravity anomalies IOCG-U mineral prospects. Project final report.
As part of a search for possible high crustal level, Olympic Dam - type IOCG deposits hosted by Mesoproterozoic basement rocks, Eromanga Uranium undertook deep diamond drill testing of two large, semi-coincident magnetic/gravity anomalies recognised...-
Document
-
Naarack, Mabel Creek and Wintinna (part of the Arckaringa Basin Project). Respective final reports at licences' joint full surrender, for the period 26/3/2008 to 2/4/2010.
In a search for postulated Tertiary heavy mineral sands marine placer deposits that may have been formed outside of the presently known north-eastern extent of such age sedimentary basins (i.e. along a proto Eucla Basin coastline existing within the...-
Document
-
Data release - as updated [made at SA Director of Mines’ discretion] : Paralana Creek (part of the Beverley Project). Annual reports for the period 29/9/2009 to 15/11/2015.
Work undertaken on EL 4378 during the 2009-2010 reporting year included the drilling of 478 vertical rotary mud holes totalling 132,960 m, and core drilling totalling 4117 m performed in 16 of these holes for stratigraphic unit / resource...-
Document
Published: 24 Dec 1915
-
Mount Britton. Annual and final reports for the period 19/10/97 to 18/10/99.
Limited percussion drilling (2 holes, total 446 m) of inferred dipolar aeromagnetic anomalies in the vicinity of Ross Creek, 140 km north-east of Marla, and subsequent mineralogical examination of heavy mineral concentrates obtained from the drilled...-
Document
-
Dewatering investigations, Lake Phillipson area, South Australia.
An initial investigation programme aimed at obtaining hydraulic data from part of the Lake Phillipson Permian coal field been successfully completed. The initial area under consideration for mining is of approximately 130 hectares within the Western...-
Document
-
Abminga Diamond Project. Data release made at licence renewal [and project cessation]: progress reports and annual reports for the period 25/10/1993 to 17/3/2004.
The Abminga Diamond Project, undertaken by Caldera Resources NL, was granted exploration project status, including permission for EL joint reporting, in July 1996. This event followed up to two years of work by other operators on a number of...-
Document