-
Gravity and magnetic analysis Lagoon Hill area, South Australia. Appendix 1 in progress report for the period ended 3/11/1973.
There is no abstract created for this record-
Document
Published: 01 Jan 1973
-
Millers Creek Homestead. Progress reports and final report to licence expiry/full surrender, for the period 13/3/1980 to 28/3/1986.
Following a review of existing regional geophysical and geological data for the north-western Stuart Shelf, grid-based gravity and ground magnetic surveys were run to further outline two broad gravity highs associated with discrete magnetic anomalies,...-
Document
-
Mount Carulina and Trapeze Hill (the Oodnadatta Project). Joint annual reports plus succeeding single licence annual reports to licence expiry/full surrender, for the period 6/3/1995 to 12/10/2009. [ Index Part 2 of 2 ].
[ Note - here is Part 2 of the abstract relating to 2 separately indexed parts ]. A new joint venture with Barrick Gold, pertaining to the renewed (as EL 3424) tenement, was signed on 8/2/2007, after which that company as operator undertook a 749...-
Document
Published: 09 Feb 1910
-
Marla, Alberga River and Mount Weir areas (part of the Abminga Project). Combined final report at licences' joint surrender, for the period 21/6/2006 to 2/4/2009.
A basinal region located in the vicinity of Marla and extending for approximately 75 km to the north north-east, that borders the Musgrave Province, has been explored by farminee Eromanga Uranium under a joint venture agreement with licensee Maximus...-
Document
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 5 partnership DPY5-07 - northern Gawler Craton - Welbourn Hill and Nicholson Hill magnetic/gravity anomalies IOCG-U mineral prospects. Project final report.
As part of a search for possible high crustal level, Olympic Dam - type IOCG deposits hosted by Mesoproterozoic basement rocks, Eromanga Uranium undertook deep diamond drill testing of two large, semi-coincident magnetic/gravity anomalies recognised...-
Document
-
Data release - as updated [made at SA Director of Mines’ discretion] : Paralana Creek (part of the Beverley Project). Annual reports for the period 29/9/2009 to 15/11/2015.
Work undertaken on EL 4378 during the 2009-2010 reporting year included the drilling of 478 vertical rotary mud holes totalling 132,960 m, and core drilling totalling 4117 m performed in 16 of these holes for stratigraphic unit / resource...-
Document
Published: 24 Dec 1915
-
Mount Britton. Annual and final reports for the period 19/10/97 to 18/10/99.
Limited percussion drilling (2 holes, total 446 m) of inferred dipolar aeromagnetic anomalies in the vicinity of Ross Creek, 140 km north-east of Marla, and subsequent mineralogical examination of heavy mineral concentrates obtained from the drilled...-
Document
-
Abminga Diamond Project. Data release made at licence renewal [and project cessation]: progress reports and annual reports for the period 25/10/1993 to 17/3/2004.
The Abminga Diamond Project, undertaken by Caldera Resources NL, was granted exploration project status, including permission for EL joint reporting, in July 1996. This event followed up to two years of work by other operators on a number of...-
Document
-
Data release [made at SA Director of Mines' discretion] : Old Hut area (part of the Marree Uranium JV Project). First annual report for the period 30/6/2009 to 29/6/2010.
Exploration for possible Beverley - type Tertiary sedimentary uranium deposits associated with the north-western margin of the Mount Babbage Inlier, being undertaken within a small licence area centred approximately 120 km east of Lyndhurst, has...-
Document
Published: 16 Sep 1910
-
Data release - as updated : Boundary Dam. Annual reports to licence expiry/full surrender, for the period 30/7/2007 to 29/7/2016.
A small area centred ~130 km north of Marla, and abutting the Northern Territory border along the northern side of Tieyon Station, has been explored for possible economic buried secondary uranium deposits, which Tianda Uranium (Tianda) thought could...-
Document
-
Lake Frome [West]. First partial surrender report, for the period 18/10/2013 to 17/10/2016.
An area on the south-western edge of the Frome Embayment, that is centred ~100 km south of the Beverley uranium mine, has been taken up to explore for possible buried palaeochannel and sandstone hosted roll front style secondary uranium mineralisation...-
Document
Published: 02 Nov 1917
-
Drennans Hut. Annual reports plus final report to licence full surrender, for the period 19/8/2013 to 5/6/2019.
An area in the south-west of the Frome Embayment, that was centred ~16 km south-southeast of Reaphook Hill, was taken up to explore for possible buried palaeochannel and sandstone hosted roll front style secondary uranium mineralisation which might...-
Document
Published: 22 Jul 1919
-
Mount Morgan and Tent Hill (Stuart Creek Project). Progress and final reports from 8/1/82 to 7/1/84.
Negative heavy mineral sampling results and a lack of magnetic anomalies suggest that two areas located south-west of Lake Eyre South have little potential for diamonds and / or kimberlites.-
Document
-
Nilpinna Springs. [Farminee's diamond exploration] Progress report for the period 13/7/1986 to 12/1/1987.
TARGET: Diamondiferous kimberlites in the Boorthanna Trough region (near Nilpinna Springs). EXPLORATION: A literature review, the reprocessing and re-interpretation of data from BHP's 1983 Peake Creek Aerial Magnetic Survey flown by Aerodata /...-
Document
-
Millers Creek. Progress reports to licence full surrender, for the period 25/7/1989 to 29/7/1993.
Exploration for diamonds in the Millers Creek area, 150 km south-east of Coober Pedy, comprised an airborne magnetic and radiometric survey followed by ground magnetic surveys over aeromagnetic anomalies interpreted to represent potential kimberlites....-
Document
Published: 05 Sep 1993
-
Rawlinson Hill, Mount Sabine, Snow Hill and Billa Kalina Homestead (Stuart Shelf / Arckaringa Basin). Joint progress reports to licence expiry/full surrender, for the period 12/2/1981 to 28/4/1987.
Over the report period Agip Australia completed the drilling and geophysical logging of 39 open rotary holes totalling 3845 m to investigate if economic coal seams occur within Permian sediments of the southern Arckaringa Basin. Although the Permian...-
Document
-
Data release [made at SA Director of Mines’ discretion] : Paralana Creek (part of the Beverley Project). Annual reports and technical reports to licence expiry/renewal, for the period 29/8/1992 to 28/9/2009.
In the reporting period to 30th June 1995 for Exploration Licence 1944, Heathgate Pty Ltd completed no fieldwork, however geological evaluation work was undertaken. This work consisted of laboratory testing of drill core from a 1991 drilling program...-
Document
Published: 18 Jun 1910
-
Data release - as updated [made at SA Director of Mines' discretion] : North Mulga, Wooltana and Paralana areas (Frome Basin Project). Joint annual reports for the period 24/9/2012 to 31/12/2018.
The continuation of Heathgate's programme of exploration for economic buried Tertiary sediment-hosted uranium mineralisation within part of the north-western Frome Embayment during 2012-2013 has comprised exploratory drilling of 36 vertical rotary mud...-
Document
-
PEL 31, southwestern Eromanga Basin. Progress and final reports for the period 30/9/85 to 30/9/88.
TARGET:Primary target was migrating oil trapped in Algebuckina Sandstone at sites along the Cooryaninna Anticline.EXPLORATION: - Landsat survey, - reconnaissance seismic survey (Curdimurka - Marree Seismic Survey) over the Marree Block in 1985, - soil...-
Document
Published: 01 Jan 1988
-
Bulgunnia. Progress reports and final report to licence full surrender, for the period 22/5/1978 to 10/8/1981.
The base metal and uranium potential of a concealed Proterozoic basement high near Bulgunnia Homestead was evaluated using geological and hydrogeochemical reconnaissance and regional geophysical interpretation approaches. Seismic, ground magnetic and...-
Document