-
Lake Cadibarrawirracanna. Progress and final reports to licence expiry/full surrender for the period 3/6/1980 to 2/12/1980.
Thirty-two shallow auger holes up to 2.76 m deep were drilled into the floor of Lake Cadibarrawirracanna, situated 70 km west of William Creek, in a search for possible potash-rich brines trapped by the lake sediments. The lacustrine sediments were...-
Document
-
Porter Hill. Annual reports for the period 26/8/1998 to 26/5/2000 (the commencement of the Lake Torrens Project joint reporting period) : part of a data release made on 31/12/2006 upon a subsequent partial surrender.
Following the detection in late 1997, by reconnaissance mobile metal ion partial leach analytical methods, of anomalous base and precious metal concentrations in the soil above several low amplitude magnetic anomalies on Tasman Resources' EL 2340, the...-
Document
Published: 25 Oct 1999
-
Mount Carulina and Trapeze Hill (the Oodnadatta Project). Joint annual reports plus succeeding single licence annual reports to licence expiry/full surrender, for the period 6/3/1995 to 12/10/2009. [ Index Part 2 of 2 ].
[ Note - here is Part 2 of the abstract relating to 2 separately indexed parts ]. A new joint venture with Barrick Gold, pertaining to the renewed (as EL 3424) tenement, was signed on 8/2/2007, after which that company as operator undertook a 749...-
Document
Published: 09 Feb 1910
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 2 partnership DPY2-13, evaluation of the Marathon South mineral occurrence. Project interim and final reports.
Following further detailed ground gravity surveying and data processing carried out to better understand the gravity response of relatively dense and weakly magnetic basement rocks at the Marathon South prospect, located within EL 3209 and lying...-
Document
Published: 10 May 1906
-
Mabel Creek. Annual and final progress reports to licence expiry/full surrender for the period 3/12/1999 to 2/12/2003.
As part of an exploration project targeting possible large-scale opal occurrences hidden at depth beneath marine shale outcrops in the Stuart Range 'Breakaway' country, the subject licence was taken up to cover certain ground lying adjacent to the...-
Document
Published: 25 Jun 1903
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 3 partnership DPY3-15, Peake and Denison Inliers western flank Mesozoic sedimentary uranium mineral prospects. Project final report.
Approved PACE Initiative Year 3 drilling proposal DPY3-15 aimed to discover a roll-front style uranium deposit hosted in Mesozoic sandstones flanking the exposed radiogenic Peake and Denison Inliers, that is amenable to mining by in-situ leach...-
Document
Published: 13 Apr 1907
-
Marla, Alberga River and Mount Weir areas (part of the Abminga Project). Combined final report at licences' joint surrender, for the period 21/6/2006 to 2/4/2009.
A basinal region located in the vicinity of Marla and extending for approximately 75 km to the north north-east, that borders the Musgrave Province, has been explored by farminee Eromanga Uranium under a joint venture agreement with licensee Maximus...-
Document
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 5 partnership DPY5-07 - northern Gawler Craton - Welbourn Hill and Nicholson Hill magnetic/gravity anomalies IOCG-U mineral prospects. Project final report.
As part of a search for possible high crustal level, Olympic Dam - type IOCG deposits hosted by Mesoproterozoic basement rocks, Eromanga Uranium undertook deep diamond drill testing of two large, semi-coincident magnetic/gravity anomalies recognised...-
Document
-
Naarack, Mabel Creek and Wintinna (part of the Arckaringa Basin Project). Respective final reports at licences' joint full surrender, for the period 26/3/2008 to 2/4/2010.
In a search for postulated Tertiary heavy mineral sands marine placer deposits that may have been formed outside of the presently known north-eastern extent of such age sedimentary basins (i.e. along a proto Eucla Basin coastline existing within the...-
Document
-
Data release - as updated [made at SA Director of Mines’ discretion] : Paralana Creek (part of the Beverley Project). Annual reports for the period 29/9/2009 to 15/11/2015.
Work undertaken on EL 4378 during the 2009-2010 reporting year included the drilling of 478 vertical rotary mud holes totalling 132,960 m, and core drilling totalling 4117 m performed in 16 of these holes for stratigraphic unit / resource...-
Document
Published: 24 Dec 1915
-
Oolgelima Creek. Annual reports and final report to licence expiry/full surrender, for the period 30/1/2017 to 29/1/2020.
An area consisting of two adjacent small sub-blocks located in the western Lake Cadibarrawirracanna drainage basin has been explored for possible buried economic magnesium- and sodium-sulphate salts and also for possible underlying basement-hosted...-
Document
Published: 29 Jan 1920
-
Ouldburra Hill. First annual and final report for the period 25/6/2002 to 24/6/2003.
A small area of opal workings examined near Ouldburra Hill, 35 km south-east of Marla, was thought to indicate local potential for finding and developing larger scale deposits. Research and review of available historic data showed that the area holds...-
Document
-
Mount Britton. Annual and final reports for the period 19/10/97 to 18/10/99.
Limited percussion drilling (2 holes, total 446 m) of inferred dipolar aeromagnetic anomalies in the vicinity of Ross Creek, 140 km north-east of Marla, and subsequent mineralogical examination of heavy mineral concentrates obtained from the drilled...-
Document
-
Abminga Diamond Project. Data release made at licence renewal [and project cessation]: progress reports and annual reports for the period 25/10/1993 to 17/3/2004.
The Abminga Diamond Project, undertaken by Caldera Resources NL, was granted exploration project status, including permission for EL joint reporting, in July 1996. This event followed up to two years of work by other operators on a number of...-
Document
-
Starvation Lake. Progress reports and final report on regional exploration programme at licence surrender, for the period 13/1/1972 to 31/7/1972.
In a search for possible economic roll-front, blanket style uranium deposits within Tertiary sediments in part of the eastern Frome Embayment, the licensee undertook 1:75,000 scale geological mapping and exploratory auger drilling of the Quaternary...-
Document
-
[Results of in-house] Bench scale epsomite testwork.
Results of a programme of laboratory scale testwork conducted to investigate fresh water leaching of epsomite ore originating from Coober Pedy in South Australia are as follows: 1). The ore when leached readily producing brines of uniform...-
Document
Published: 16 Apr 1986
-
Lake Frome Project. Individual licence annual reports, joint annual reports and final reports to various constituent licences' joint full surrenders, for the period 16/4/2009 to 5/6/2015.
An area centred ~36 km west of Quinyambie Homestead has been explored for possible buried economic sedimentary uranium mineralisation of palaeochannel hosted roll-front style that may have formed in relatively more distal Tertiary basinal sediments,...-
Document
Published: 30 Mar 1915
-
Data release [made at SA Director of Mines' discretion] : Old Hut area (part of the Marree Uranium JV Project). First annual report for the period 30/6/2009 to 29/6/2010.
Exploration for possible Beverley - type Tertiary sedimentary uranium deposits associated with the north-western margin of the Mount Babbage Inlier, being undertaken within a small licence area centred approximately 120 km east of Lyndhurst, has...-
Document
Published: 16 Sep 1910
-
Data release - as updated : England Hill, Arckaringa and Copper Hill (the Arckaringa Coal Project). Joint annual reports and joint final report to licences' expiry/full surrender, for the period 7/6/2005 to 6/6/2019.
Under a new strategic focus, three licence areas covering three Early Permian buried coal deposits located at Wintinna, Westfield and Murloocoppie in the northern part of the Arckaringa Basin, ~120 km north of Coober Pedy, have been evaluated both for...-
Document
Published: 29 Aug 1919
-
Data release - as updated : Boundary Dam. Annual reports to licence expiry/full surrender, for the period 30/7/2007 to 29/7/2016.
A small area centred ~130 km north of Marla, and abutting the Northern Territory border along the northern side of Tieyon Station, has been explored for possible economic buried secondary uranium deposits, which Tianda Uranium (Tianda) thought could...-
Document