-
Kadlongaroo Hill. Progress reports and final report to licence expiry/full surrender, for the period 11/8/1981 to 10/8/1982.
Drilling of a 196 m deep vertical diamond hole to further investigate the oil shale potential of Permian strata in the axis of the Boorthanna Trough, north of Billa Kalina Homestead, intersected only Lower Permian glacial sediments below 30 m thick...-
Document
Published: 02 Jun 1982
-
Lake Phillipson area. Progress and technical reports for the periods 23/11/1978 to 22/11/1980, and 12/2/1981 to 11/5/1982. [forms Part 2 of a SADME - compiled Lake Phillipson coal deposit data package released in December 1994].
The licensee's 1981 coal search programme at Lake Phillipson had the following objectives: - delineation of the total extent of the coal measures; - resolution of seam stratigraphy and correlation of seams between the Main and West Areas; -...-
Document
-
RB 91/00052 Ruby Hill 1. Well completion report.
SADME stratigraphic drillhole Ruby Hill 1 was sited 10.4 km east of William Creek, and was designed to penetrate Early Cretaceous rocks of the Eromanga Basin and to sample pre-Mesozoic basement. It intersected 191 m of the Eromanga Basin sedimentary...-
Document
Published: 01 May 1991
-
Wintinna Coalfield hydrogeological study.
This report presents a description of the hydrogeology of the Wintinna coal deposit proposed mine site area, and of the investigative work performed to acquire specific data on aquifer properties and groundwater behaviour. Two production bores were...-
Document
Published: 14 Sep 1983
-
Dewatering investigations, Lake Phillipson area, South Australia.
An initial investigation programme aimed at obtaining hydraulic data from part of the Lake Phillipson Permian coal field been successfully completed. The initial area under consideration for mining is of approximately 130 hectares within the Western...-
Document
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 1 partnership DPY1-47 - [prospecting for] water in Permian palaeochannels draining the Mount Woods Inlier. Project final report.
Development of the Prominent Hill copper-gold deposit in the Mount Woods region will require an adequate source of water to support planned mining and ore processing operations, currently estimated to involve at least 6 million tonnes of ore per year....-
Document
Published: 10 Jun 1905
-
Painted Hill. Progress reports and final report to licence expiry/full surrender, for the period 12/7/1982 to 11/7/1987.
Stockdale's diamond exploration work included reconnaissance stream sampling, and photogeology and Landsat interpretation. Ground magnetic surveys were run over aeromagnetic anomalies interpreted from the previous nickel exploration (Mount Purvis)...-
Document
-
Oolgelima Hill. First partial surrender report, for the period 15/7/1983 to 14/7/1984.
Investigation of a reported occurrence of magnesium and sodium sulphates in a black shale at the base of the Cretaceous Bulldog Shale, found previously about 50 km north-east of Coober Pedy near the western margin of the Eromanga Basin, was initially...-
Document
Published: 24 Aug 1984
-
Noorina Dam, Birthday Hill, Codna Hill and Cadaree Hill. [Diamond exploration - sole risk and joint venture] Joint progress reports and joint final report to licences' joint expiry/full surrender, for the period 23/9/1983 to 29/5/1990.
TARGET: Possible diamonds and source diamondiferous kimberlites in the Boorthanna Trough region. EXPLORATION: Present-day drainage heavy mineral sampling for kimberlitic indicators, follow-up barrage sampling for diamonds, an aerial magnetic survey...-
Document
-
Rawlinson Hill, Mount Sabine, Snow Hill and Billa Kalina Homestead (Stuart Shelf / Arckaringa Basin). Joint progress reports to licence expiry/full surrender, for the period 12/2/1981 to 28/4/1987.
Over the report period Agip Australia completed the drilling and geophysical logging of 39 open rotary holes totalling 3845 m to investigate if economic coal seams occur within Permian sediments of the southern Arckaringa Basin. Although the Permian...-
Document
-
1982 seismic survey, Christmas Creek, final report.
AIM:The 1982 Christmas Creek Seismic Survey was designed to cover a wide area of the sparsely explored western farmout blocks of PELs 5 and 6, where Eromanga Basin sediments thin and overly sub-basins of variously aged prospective sediments. Primary...-
Document
-
Pedirka Sector: a reassessment of geology, porosity, maturity and maturity history.
A review of the Permo-Triassic and Mesozoic distribution of reservoir units. Data for some Birdsville Track Ridge wells are included as the development of the Pedirka Sector basins and the Birdsville Track Ridge are closely related.-
Document
-
Billa Kalina Homestead. Progress reports and final report to licence full surrender, for the period 30/6/1977 to 14/2/1979.
Airborne and ground geophysical surveys were undertaken in the Billa Kalina area, prior to commencing to drill in a search for Olympic Dam type Cu-U-Au mineralised haematitic breccias, in order to delineate and detail several broad magnetic anomalies...-
Document
-
Dalhousie Block (exploration) summary and five-year plan.
A summary of Block petroleum prospectivity prepared prior to starting selective low-key exploration during the 1985-1989 licence period. The report gives the rationale for the proposed work programme of 4 wells and 1900 line km of seismic acquisition...-
Document
Published: 01 Jan 1985
-
RB 71/00037 Mount Willoughby 001. Well completion report.
Mount Willoughby 1 was drilled in the northern part of the Arckaringa Basin as a continuation of the SA Department of Mines stratigraphic study of this area. The well was drilled on the western plateau of a positive gravity high on the Wintinna 1 mile...-
Document
Published: 05 Apr 1971
-
Wintinna Coalfield hydrogeological and geotechnical study.
This study has formulated a geotechnical and hydrogeological model of the Wintinna Coalfield which satisfies the following objectives: - to provide answers to the hydrogeological and geotechnical questions raised by Fluor in their mining study; - to...-
Document
Published: 05 Dec 1983
-
Eurelyana Hill and Pootnoura Creek (the Ant Hill Project). Joint annual reports to licences' joint expiry/full surrender, for the period 19/11/2007 to 18/11/2012.
Two separate licence areas centred approximately 50 km north of Coober Pedy have been explored for possible economic roll-front style sedimentary uranium mineralisation that may have formed within Palaeozoic and younger cover, and for Olympic Dam type...-
Document
Published: 27 Mar 1913
-
Billa Kalina, Welcome Creek, Millers Creek, Margaret Creek and Francis Swamp (the Billa Kalina G2 Diamond Project). Data release made at remaining licences' joint partial surrender: joint annual reports for the period 25/2/2006 to 29/8/2012.
As part of continuing diamond exploration on the subject five licences, more of the first pass sampling program was completed by Flinders Diamonds in August 2006 via aircore drilling of 47 vertical holes for an aggregate 1852 m aimed at penetrating to...-
Document
Published: 10 May 1912
-
Data release - as updated : Phar Lap Outstation. Annual reports plus final report to licence expiry/full surrender, for the period 27/8/2007 to 26/8/2017.
An area centred ~85 km south-southeast of Coober Pedy, at the southern margin of the Lake Phillipson Trough, a long active tectonic feature now occupied by deep sedimentary fill, was taken up by a wholly-owned subsidiary to Monax Mining Ltd primarily...-
Document
Published: 24 May 1917
-
RB 2006/00001 Guide to the sedimentary cover of the central Gawler Craton, South Australia
The central Gawler Craton is blanketed by thin sedimentary cover that ranges in age from Neoproterozoic to Quaternary. Locally, though, such cover can reach a maximum of ~500 m thickness in Permian glacial valleys or rift structures. This guide...-
Document
Published: 01 Jan 2006