PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 3 partnership DPY3-15, Peake and Denison Inliers western flank Mesozoic sedimentary uranium mineral prospects. Project final report.
Approved PACE Initiative Year 3 drilling proposal DPY3-15 aimed to discover a roll-front style uranium deposit hosted in Mesozoic sandstones flanking the exposed radiogenic Peake and Denison Inliers, that is amenable to mining by in-situ leach...-
Document
Published: 13 Apr 1907
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 3 partnership DPY3-29, Mount Woods area sandstone-hosted uranium mineral prospects. Project final report.
As part of the PACE Initiative Year 3 collaborative drilling projects between PIRSA and the minerals industry, Goldstream carried out an approved programme of reverse circulation drilling on its Mount Woods area exploration tenements, into selected...-
Document
Published: 18 Dec 1906
-
Peake Creek. Annual reports and final report to licence expiry/full surrender, for the period 16/9/2005 to 15/9/2009.
An area located immediately west of the Denison Inlier of the Proterozoic Peake and Denison Ranges, approximately 70 km south-east of Oodnadatta, was explored for possible roll-front style sedimentary uranium deposits that may have formed within...-
Document
Published: 20 Oct 1909
-
Edward Creek. Annual reports and final report to licence expiry/full surrender, for the period 16/9/2005 to 15/9/2009.
An area located immediately west of the Denison Inlier of the Proterozoic Peake and Denison Ranges, approximately 90 km south-east of Oodnadatta, was explored for possible roll-front style sedimentary uranium deposits that may have formed within...-
Document
Published: 20 Oct 1909
-
Data release - as updated [made at SA Director of Mines’ discretion] : Paralana Creek (part of the Beverley Project). Annual reports for the period 29/9/2009 to 15/11/2015.
Work undertaken on EL 4378 during the 2009-2010 reporting year included the drilling of 478 vertical rotary mud holes totalling 132,960 m, and core drilling totalling 4117 m performed in 16 of these holes for stratigraphic unit / resource...-
Document
Published: 24 Dec 1915
-
Data release - as updated : Boundary Dam. Annual reports to licence expiry/full surrender, for the period 30/7/2007 to 29/7/2016.
A small area centred ~130 km north of Marla, and abutting the Northern Territory border along the northern side of Tieyon Station, has been explored for possible economic buried secondary uranium deposits, which Tianda Uranium (Tianda) thought could...-
Document
-
Data release [made at SA Director of Mines’ discretion] : Paralana Creek (part of the Beverley Project). Annual reports and technical reports to licence expiry/renewal, for the period 29/8/1992 to 28/9/2009.
In the reporting period to 30th June 1995 for Exploration Licence 1944, Heathgate Pty Ltd completed no fieldwork, however geological evaluation work was undertaken. This work consisted of laboratory testing of drill core from a 1991 drilling program...-
Document
Published: 18 Jun 1910
-
Mount Kingston East Areas 1 and 2, and Mount Harvey (the Denison Range Project). Joint annual reports to licences' expiry/full surrender, for the period 13/12/2010 to 12/6/2013.
The three Denison Range Project tenements, centred approximately 70 km south-east of Oodnadatta, which cover alluvial plains formed adjacent to the south-eastern edge of said range of hills that comprise eroding Palaeo- to Mid-Proterozoic uranium-rich...-
Document
Published: 22 Jul 1913
-
Algebuckina. Fifth partial surrender report, for the period 3/8/2004 to 28/9/2012.
Portions of the subject licence located at the northern end of the Peake and Denison Ranges have been relinquished owing to their perceived lower exploration potential. All of the reported work that was done within these licence portions pertains to...-
Document
Published: 12 Oct 1912
-
Algebuckina. Fourth partial surrender report, for the period 3/8/2004 to 28/9/2010.
Three now relinquished licence portions located along the western margin of the Denison Inlier have been explored for possible economic stratabound roll-front style or palaeochannel hosted sedimentary uranium deposits, inferred as likely to have...-
Document
Published: 01 Feb 1911
-
Peake. Annual reports and final report to licence expiry/full surrender, for the period 3/8/2004 to 28/9/2014.
An area located to the west and south of the Algebuckina Inlier of the Proterozoic Peake and Denison Ranges, which is centred approximately 50 km south-east of Oodnadatta, has been explored for possible roll-front style sedimentary uranium deposits...-
Document
Published: 01 Oct 1914
-
The Lake Eyre Project. Joint first annual report plus final report to project licences' joint full surrender, for the period 3/5/2011 to 7/3/2013.
A large area surrounding the southern end of Lake Eyre, which is known to be underlain by a thinning succession of Cretaceous basinal sediments, was taken up to explore for possible economic secondary sandstone-hosted uranium mineralisation. No field...-
Document
Published: 27 Mar 1913
-
Peake Hill. Annual and final reports to licence expiry/full surrender, for the period 16/7/2007 to 15/7/2012.
An area located on and closely marginal to the Denison Inlier of the Proterozoic Peake and Denison Ranges, approximately 80 km south-east of Oodnadatta, was explored for possible roll-front style sedimentary uranium deposits that may have formed...-
Document
Published: 03 Aug 1912
-
Data release [made at SA Director of Mines' discretion] : Algebuckina. Annual reports for the period 3/8/2004 to 2/8/2008.
An area surrounding the Algebuckina Inlier of the Proterozoic Peake and Denison Ranges, which is centred approximately 50 km south-east of Oodnadatta, is being explored for possible roll-front style sedimentary uranium deposits that may have formed...-
Document
Published: 20 Oct 1908
-
Peake. Third partial surrender report for the period 3/8/2004 to 28/9/2010.
A now relinquished licence portion located along the western margin of the Denison Inlier has been explored for possible economic stratabound roll-front style or palaeochannel hosted sedimentary uranium deposits, inferred as likely to have formed...-
Document
Published: 01 Feb 1911
-
Strangways [Springs]. Annual report plus final report to licence expiry/full surrender, for the period 7/1/2011 to 6/1/2013.
An area extending along the Marree - William Creek - Oodnadatta Track, some distance to the west of Lake Eyre South and centred 140 km north of Olympic Dam, has been explored for possible economic buried Mesozoic sandstone-hosted (Kazakhstan style)...-
Document
-
Data release - as updated [made at SA Director of Mines’ discretion] : Wooltana. Annual reports for the period 8/8/1997 to 23/9/2009.
Exploration for possible economic buried sedimentary uranium mineralisation within a large portion of the north-western Frome Embayment located immediately south of the Beverley uranium deposit and covering the southern end of the Poontana Sub-basin,...-
Document
Published: 23 Nov 1909
-
Karkaro. Progress report to licence full surrender, for the period 26/11/1974 to 25/2/1975.
TARGET: Possible open-pit mineable Lower Permian coal seams, present down to a depth of 100 m below surface, associated with an inferred basinal depression located to the north-west of and adjacent to previous SADM stratigraphic drillhole Karkaro 1,...-
Document
Published: 01 Jan 1975