-
Cooyerdoo Station. Progress reports to licence expiry/re-issue as part of another licence, for the period 14/9/1981 to 13/3/1983.
Following the signing of an eighteen month exploration joint venture agreement with Stockdale, farminee Mobil Energy Minerals undertook continuation of the uranium search over the anomalous ground lying east and south-east of Lake Gilles, besides...-
Document
Published: 12 Apr 1983
-
Mount Allalone. Progress and annual reports for the period 14/6/89 to 31/7/95.
Base metal exploration of two lead-zinc mineralized areas previously discovered by Billiton and WMC within Hutchison Group metasediments near Mt Allalone, northwest of Buckleboo on central Eyre Peninsula, comprised ground magnetic and EM surveys, RAB...-
Document
Published: 02 Nov 1995
-
RB 91/00040 Wattleton - Coomunga drilling traverse, Port Lincoln. Well completion report.
Eighteen rotary drillholes with bottom-hole core and one diamond drillhole were completed northwest of Port Lincoln and intersected quartzite, schist, calcsilicate, graphitic schist and marble attributed to the Hutchison Group. These drillholes were...-
Document
Published: 01 Mar 1991
-
RB 91/00030 Wilklow DDH-1, northwest of Cowell. Well completion report.
Wilklow DDH1 was drilled by SADME east of the Miltalie mine, located NW of Cowell, to test an IP / resistivity anomaly. Drill core comprised of migmatitic Cook Gap Schist of the Palaeoproterozoic Hutchison Group was recovered down to 152.5 m hole...-
Document
Published: 01 Feb 1991
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 3 partnership DPY3-44, Wilgerup (southern Gawler Craton) haematitic iron ore prospect. Project final report.
Centrex Metals commenced reverse circulation exploration and resource definition drilling at the Wilgerup iron ore deposit on 6/9/2006, which was partly funded by the PACE Initiative as a Year 3 approved project, with funds allocated for 1000 m of RC...-
Document
Published: 20 Apr 1907
-
Menninnie Dam (part of the Fleurieu - Menninnie Dam Exploration Joint Venture Project). Combined annual report for the 5-year period 24/9/2005 to 26/10/2010, plus annual reports for the period 27/10/2010 to 26/10/2012.
During the 5-year period 2005-2010, intensified exploration undertaken at Menninnie Dam was focussed on the discovery and delineation of structurally controlled hydrothermal Pb-Zn-Ag mineralisation. Carbonate-rich Hutchison Group metasediments forming...-
Document
-
Data release [made at SA Director of Mines’ discretion] : Menninnie Dam (part of the Fleurieu - Menninnie Dam Exploration Joint Venture Project). Annual reports for the period 24/9/2001 to 23/9/2005.
The buried Menninnie Dam zinc-lead(-silver-copper) deposit, located approximately 55 km north of Kimba on northern Eyre Peninsula, and sitting adjacent to the south-eastern margin of the Gawler Ranges, is being evaluated for its future commercial...-
Document
-
Carappee Hill. Progress reports to licence expiry/full surrender for the period 8/7/1983 to 7/7/1984.
Possible exhalative sulphide orebodies of the Broken Hill - Aggeneys type, associated with Lower Proterozoic banded iron formations that are known to be Pb-Cu anomalous in the Cleve area (Campoona Syncline) 35 km to the south-east, were the prime...-
Document
-
Strawberry Hill. Progress and final reports to licence expiry for the period 4/10/89 to 3/1/94.
Exploration in the Wanilla - Cummins area searching for economic accumulations of heavy minerals in Eocene sands comprised 2 phases of aircore drilling (167 holes, total 4049 m). A resulting drill intersection yielded a 0.72% heavy-mineral...-
Document
-
Cowell - Middleback Range and Sheoak Hill areas. Joint progress reports for the initial tenure period 15/3/1983 to 14/3/1984.
TARGET: Possible stratiform Pb-Zn-Ag mineralisation of the Broken Hill or Aggeneys-Gamsberg type associated with banded iron formations in Early Proterozoic metasediments. EXPLORATION: Regional ground magnetic surveys, geological mapping, 29 RAB...-
Document
-
Stony Hill (part of the Northern Eyre Peninsula JV Project). Final report at licence full surrender, for the period 2/12/2004 to 23/12/2016.
During the life of the subject licence, the focus of exploration was to determine the area's potential for DSO haematite iron ore, with a secondary consideration being magnetite and haematite BIF. After conducting geophysical surveys and exploratory...-
Document
Published: 17 Jan 1917
-
Mount Olinthus. Progress reports plus interim final report to licence expiry/renewal, for the period 12/7/1978 to 7/11/1987.
TARGET: Unconformity related, vein-like and vein-type uranium in the Cleve Metamorphics, Katunga Dolomite and Mangalo Schist; lead-zinc sulphides of Broken Hill or Balmat-Edwards type in the Hutchison Group. EXPLORATION: Uranium exploration...-
Document
-
Bull 033 The Geology and Iron Ore Resources of the Middleback Range Area
This report deals comprehensively with the physiography, prospect geology, and ore genesis, and includes an assessment of the iron ore reserves and other mineral resources of an area which has been almost the sole source of the iron ore used in...-
Document
-
Bull 055 A geochronological framework for the Gawler Craton, South Australia
This bulletin contains geochronological data and interpretations from the Gawler Craton of South Australia that have been completed by Mark Fanning of The Australian National University, by Geological Survey of South Australia personnel, and by...-
Document
-
Gilles Downs (part of the Northern Eyre Peninsula Project). First annual report (prior to start of joint reporting status) for the period 8/7/2005 to 7/7/2006: and final report submitted at licence full surrender, for the succeeding period to 30/7/2015.
A licence area consisting of two separate sub-blocks located on the plains extending to the west of the Middleback Range on north-eastern Eyre Peninsula was taken up to explore for possible economic buried deposits of stratabound magnetite iron ore...-
Document
-
Pearlah. Final report at licence full surrender, for the period 10/1/2013 to 17/10/2013.
A small licence area consisting of three separate sub-blocks situated inland to the west from Boston Bay, in that vicinity and at Green Patch and at Wanilla, has been explored for possible economic near surface graphite mineralisation. A desktop...-
Document
Published: 11 Dec 1913
-
Data release - as updated [made at SA Director of Mines' discretion] : Kimba Gap, Ironstone Hut, Ironstone Hill, Stony Hill, Gilles Downs and Minbrie areas (the Northern Eyre Peninsula Project). Joint annual reports for the period 2/12/2005 to 31/1/2013.
Exploration for possible economic occurrences of magnetite and/or haematite iron ore formed in concealed Proterozoic basement to the west of the Middleback Range is being carried out by Northern Eyre Peninsula Project (NEPP) joint venturer Centrex...-
Document
-
Peterlumbo, Botenella Range, Lake Gilles [West], Eurilla Dam, Wilcherry Hill, Uno, Mount Miccollo and Tin Hut Hill (the Wilcherry Hill Project). Joint annual reports for the period 6/6/2002 to 31/10/2008. [Index Part 1 of 2].
Aquila Resources took up ownership of the much previously-explored ground comprising the Wilcherry Hill Project with the intent of exploring for the first time the iron oxide - associated copper-gold & uranium (IOCG-U) mineralisation potential of...-
Document
Published: 31 Dec 1908
-
Data release [made at SA Director of Mines’ discretion] : Tooligie Hill. Annual reports submitted until the commencement of joint reporting on Southern Eyre Peninsula JV Project, for the period 3/12/1999 to 10/3/2006.
There is no abstract created for this record-
Document
-
Verran (part of the Kimba-Verran Joint Venture Project, and also part of the Eyre Peninsula Joint Venture Project). Annual and combined annual reports for the period 28/6/2002 to 11/7/2009.
No field work was conducted on the subject licence area, which comprises three sub-blocks, for all of Years 6-11 (period 2002-2008) on EL 2981. During Year 8 of the project (8th March to 28th December 2004), exploration activities were reported...-
Document