-
Cooyerdoo Station. Progress reports to licence expiry/re-issue as part of another licence, for the period 14/9/1981 to 13/3/1983.
Following the signing of an eighteen month exploration joint venture agreement with Stockdale, farminee Mobil Energy Minerals undertook continuation of the uranium search over the anomalous ground lying east and south-east of Lake Gilles, besides...-
Document
Published: 12 Apr 1983
-
RB 91/00030 Wilklow DDH-1, northwest of Cowell. Well completion report.
Wilklow DDH1 was drilled by SADME east of the Miltalie mine, located NW of Cowell, to test an IP / resistivity anomaly. Drill core comprised of migmatitic Cook Gap Schist of the Palaeoproterozoic Hutchison Group was recovered down to 152.5 m hole...-
Document
Published: 01 Feb 1991
-
Menninnie Dam (part of the Fleurieu - Menninnie Dam Exploration Joint Venture Project). Combined annual report for the 5-year period 24/9/2005 to 26/10/2010, plus annual reports for the period 27/10/2010 to 26/10/2012.
During the 5-year period 2005-2010, intensified exploration undertaken at Menninnie Dam was focussed on the discovery and delineation of structurally controlled hydrothermal Pb-Zn-Ag mineralisation. Carbonate-rich Hutchison Group metasediments forming...-
Document
-
Carappee Hill. Progress reports to licence expiry/full surrender for the period 8/7/1983 to 7/7/1984.
Possible exhalative sulphide orebodies of the Broken Hill - Aggeneys type, associated with Lower Proterozoic banded iron formations that are known to be Pb-Cu anomalous in the Cleve area (Campoona Syncline) 35 km to the south-east, were the prime...-
Document
-
Peterlumbo, Botenella Range, Lake Gilles [West], Eurilla Dam, Wilcherry Hill, Uno, Mount Miccollo and Tin Hut Hill (the Wilcherry Hill Project). Joint annual reports for the period 6/6/2002 to 31/10/2008. [Index Part 1 of 2].
Aquila Resources took up ownership of the much previously-explored ground comprising the Wilcherry Hill Project with the intent of exploring for the first time the iron oxide - associated copper-gold & uranium (IOCG-U) mineralisation potential of...-
Document
Published: 31 Dec 1908
-
Data release [made at SA Director of Mines’ discretion] : Tooligie Hill. Annual reports submitted until the commencement of joint reporting on Southern Eyre Peninsula JV Project, for the period 3/12/1999 to 10/3/2006.
There is no abstract created for this record-
Document
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 2 partnership DPY2-25, southern Gawler Ranges Volcanic Province, Victory IOCG mineral prospect. Project final report.
Southern Gold Ltd, in joint venture with Hindmarsh Resources, has drilled four vertical RAB with diamond tail holes on Exploration Licence 3158 from October to November 2005 as part of the PACE Initiative Year 2 programme. Its objective was to test a...-
Document
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 5 partnership DPY5-27 - Cleve area Proterozoic unconformity-style uranium mineral prospects. Project final report.
In May 2009 a total of 45 aircore blade or hammer holes (total penetration 1332 m) were drilled by Adelaide Resources along six northeast-southwest trending traverses laid out immediately south-west of Cleve, to test a conceptual unconformity - style...-
Document
-
Moonabie Homestead. Progress reports and final report to licence expiry/full surrender, for the period 2/7/1984 to 1/7/1986.
Exploration of a thick sequence of Middle Proterozoic sediments and volcanics deposited within the Moonabie Graben, and regarded as similar in age and tectonic setting to that seen at Olympic Dam, has comprised aerial magnetic, radiometric and INPUT...-
Document