-
Blanchewater Hill. Progress and final reports for the period 11/8/80 to 10/8/82.
Drilling of two percussion holes (aggregate 400 metres) near Yerila, south of Lake Blanche, failed to give encouragement to the search for possible Permian coal and Tertiary uranium in the southern Eromanga Basin / Lake Blanche Lineament uplift area...-
Document
-
Paralana Hill (part of the Poontana Uranium Joint Venture Project). Progress reports to licence expiry/renewal, for the period 19/12/1979 to 8/2/1983.
Targets of ongoing subsurface investigations in the plains area north-west of Lake Frome, now being conducted under a new joint venture, were respectively to delineate further sedimentary uranium occurrences within buried Middle and Late Tertiary...-
Document
-
Lake Frome East. Progress and final reports to licence expiry/full surrender, for the period 30/9/1971 to 29/9/1972.
TARGET: Uranium in Tertiary sediments in the vicinity of Lakeside Bore. EXPLORATION: 2 vertical rotary mud holes for a total of 1044 feet were drilled and geophysically logged during September 1972. RESULTS: The radiometric logs did not show...-
Document
Published: 29 Sep 1972
-
Lake Pundalpa. Progress reports for the period 7/9/1972 to 6/12/1973.
There is no abstract created for this record-
Document
Published: 01 Jan 1973
-
South Eagle [part of a joint licence area with Kalabity]. Uranium exploration progress and technical reports to licence expiry/renewal, for the period 15/5/1974 to 14/2/1976.
During the EL 132 tenure, work has consisted of a mineability evaluation of the Honeymoon uranium deposit, plus additional U exploration over the South Eagle farmout. Initially, 5 rotary holes (total 594.9 m) were drilled to the north of the...-
Document
-
Lake Carnanto. Progress reports and final report to licence full surrender, for the period 30/11/1978 to 11/2/1983.
The south-eastern Lake Frome Embayment in the vicinity of Quinyambie Station was explored for Upper and Lower Tertiary 'blanket' or 'roll front' type sedimentary uranium, via the drilling of 75 open vertical rotary mud holes with a total penetration...-
Document
-
RB 83/00019 1:250 000 Geological Series - Explanatory Notes. DALHOUSIE, South Australia.
The geomorphology of DALHOUSIE broadly consists of stony uplands which include mound springs in the west, and dunefield lowlands in the east on the edge of the Simpson Desert. Strongly folded ?Adelaidean sediments are overlain by a more gently folded...-
Document
Published: 01 Nov 1984
-
RB 83/00104 Data base for the Cainozoic of the Lake Eyre Basin, and proposed drilling project with Bureau of Mineral Resources, Geology and Geophysics.
Includes surface and subsurface stratigraphic data, and a geological map at 1:500 000 scale. 18 bores were re-logged.-
Document
Published: 01 Dec 1983
-
Clayton, Cooryanna and Lake Eyre (part of the Mount Flint Project). Combined first annual/final report at licences' joint full surrender, for the period 26/3/2008 to 25/3/2009.
Exploration conduced over three semi-adjacent small licence areas located 50-75 km north-east, north and north-west of Marree targeted possible near-surface sedimentary uranium deposits in sandstone palaeochannels, and also sedimentary phosphate rock...-
Document
Published: 01 May 1909
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 3 partnership DPY3-18, Glencoe (Lake Frome East) area roll-front style uranium mineral prospects. Project interim and final reports.
The subject EL 3391 is located in the eastern Lake Frome region, and is prospective for roll-front type uranium mineralisation emplaced within sediments of the Tertiary Lake Eyre Basin. In December 2006, as part of the PACE Initiative Year 3...-
Document
Published: 02 Mar 1907
-
Mundaerno South. Annual reports plus final report to licence expiry/full surrender, for the period 23/7/2007 to 22/7/2014.
A small area centred ~33 km north-west of Cockburn and ~26 km south-southeast of the Honeymoon deposit has been explored for possible buried, calcrete hosted secondary uranium deposits that may have formed in Quaternary valley fill sediments, and also...-
Document
Published: 20 Feb 1914
-
Data release - as updated [made at SA Director of Mines’ discretion] : Ethiudna. Annual reports to licence expiry/renewal, for the period 22/2/2004 to 22/2/2015.
An area centred ~50 km north-west of Olary is continuing to be explored for possible buried economic Prominent Hill or Olympic Dam type iron oxide associated copper-gold (IOCG) breccia style mineralisation. The area is considered highly prospective...-
Document
-
Data release - as updated [made at SA Director of Mines’ discretion] : Paralana Creek (part of the Beverley Project). Annual reports for the period 29/9/2009 to 15/11/2015.
Work undertaken on EL 4378 during the 2009-2010 reporting year included the drilling of 478 vertical rotary mud holes totalling 132,960 m, and core drilling totalling 4117 m performed in 16 of these holes for stratigraphic unit / resource...-
Document
Published: 24 Dec 1915
-
Honeymoon Project - pilot wellfield drilling, January-March 1982.
Drilling was undertaken at the Honeymoon deposit, as allowed for under Miscellaneous Purposes Leases 14 and 15 and Retention Leases 10, 11 and 12, located within EL 597. This drilling was carried out as part of the construction of the 6 litre/second...-
Document
-
Yarramba. Progress reports to licence expiry/renewal for the period 8/3/1976 to 7/3/1978.
Ongoing exploration for sedimentary uranium ore deposited in buried 1.5 - 6 km wide and 50 m thick Tertiary palaeochannels in the Yarramba area, located adjacent to the SA-NSW border 50 km northwest of Cockburn, included three detailed and...-
Document
Published: 17 Apr 1978
-
Starvation Lake. Progress reports and final report on regional exploration programme at licence surrender, for the period 13/1/1972 to 31/7/1972.
In a search for possible economic roll-front, blanket style uranium deposits within Tertiary sediments in part of the eastern Frome Embayment, the licensee undertook 1:75,000 scale geological mapping and exploratory auger drilling of the Quaternary...-
Document
-
Honeymoon project - hydrological report on the HC 9 pumping test conducted February-March, 1980.
Regional and site-specific geological and hydrological factors are discussed, and a groundwater model is proposed for the Honeymoon uranium deposit, based on the results of the HC 9 drilling and testing programme, and on other existing data. A...-
Document
-
Data release [made at SA Director of Mines' discretion] : Old Hut area (part of the Marree Uranium JV Project). First annual report for the period 30/6/2009 to 29/6/2010.
Exploration for possible Beverley - type Tertiary sedimentary uranium deposits associated with the north-western margin of the Mount Babbage Inlier, being undertaken within a small licence area centred approximately 120 km east of Lyndhurst, has...-
Document
Published: 16 Sep 1910
-
Data release - as updated [made at SA Director of Mines’ discretion] : Mount Yerila. Annual reports for the period 27/8/2009 to 26/8/2015.
During the 2009-2010 licence year, 8 vertical open rotary mud drillholes, YR035 to YR042, were completed along two drill traverses for a total penetration of 1614 m. They were designed to intersect the Eyre Formation adjacent to interpreted faults in...-
Document
Published: 10 Sep 1913
-
Curnamona [Sedimentary Uranium Exploration] Project. Joint annual report for the calendar year 2012.
During 2012, Afmeco conducted a fourth exploratory drilling campaign spread over six of its eight Curnamona Project tenements, which was designed to test the extensions of the Erudina, Yarramba and Coolibah Palaeochannels, as well as probing in basin...-
Document