-
Nuckulla Hill. Annual and final reports to licence expiry/full surrender for the period 12/7/2004 to 11/7/2009.
As part of a search for possible Tunkillia type structurally-controlled buried gold deposits within an area located approximately 120 km north-east of Ceduna, licensee Southern Gold targeted geochemical and geophysical anomalies that had previously...-
Document
Published: 27 Oct 1909
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 4 partnership DPY4-47, Myall Creek Neoproterozoic stratabound base metal (copper) mineral prospect. Project final report.
The known Myall Creek stratabound copper occurrence located ~23 km north of Whyalla, which was discovered in 1975 by Australian Selection, consists of low-grade (0.3 to 2.2% Cu) Zambian Copperbelt or Kupferschiefer - style copper sulphides extending...-
Document
-
Data release [made at SA Director of Mines' discretion] : Yeltacowie (part of the Mount Gunson Project). Annual reports for the period 30/7/2003 to 6/10/2009.
The subject EL 3112 ground represents the continuation of tenure by Gunson Resources, over the same area, from its former EL 2516 Yeltacowie (for which see the relevant licence reports previously released in Envs 9530 and 9715). This replacement...-
Document
-
The Lake Torrens Project; plus the Olympic Domain Project. Joint annual reports for the period 1/1/2006 to 31/12/2010.
Licensee Copper Range originally took up a group of three tenements located in central South Australia covering areas within and west of Lake Torrens, with the intent, much reinforced following the Carrapateena deposit discovery made in 2005, of...-
Document
Published: 04 Mar 1911
-
Galaxy Tank. Annual reports for the period 22/11/96 to 21/11/98.
Regional and infill calcrete sampling conducted 70 km southwest of Coober Pedy defined a 1.5 ppb Au anomaly 2 km wide, over a northeasterly strike distance of 7 km. An investigative drilling program had been planned, prior to a management decision to...-
Document
-
Tarcoola. Data release made in lieu of a 25% first partial relinquishment at licence renewal: [Part 2 of 2] progress reports for the period 19/7/1984 to 6/12/1990. Part 1 of 2 also included.
Exploration of the Tarcoola Gold Field by Aberfoyle Resources began in mid-1984, following a partial relinquishment of other ground at licence renewal, when some promising gold assay values were detected from rock and mine dump sampling. Geological...-
Document
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 1 partnership DPY1-36, Roopena area copper/gold mineral prospects. Project interim and final reports.
Three previously untested, significant gravity anomalies were the targets for 4 exploratory vertical RC drillholes totalling 750 m, put down in areas west and north-west of Whyalla by Minotaur Exploration with funding assistance from PIRSA through its...-
Document
-
Data release - as updated [made at SA Director of Mines' discretion] : Mount Double. Annual reports for the period 24/11/2005 to 28/9/2018.
Exploration is being conducted for possible buried economic iron oxide - associated copper-gold (IOCG) mineral deposit targets within the south-central Gawler Ranges. During the first licence year, Minotaur's activities focussed on completing a...-
Document
Published: 22 Nov 1912
-
Data release - as updated [made at SA Director of Mines' discretion] : Wartaka, Iron Knob, Reid Lookout and Old Wartaka (the Parkinson Dam Project). Annual reports and joint annual reports for the period 17/2/2005 to 26/4/2019.
Four small, adjacent licences located on the south-eastern, shallow subcrop margin of the Gawler Ranges, which together make up an area centred about 25 km north-east of Lake Gilles and 60 km west of Port Augusta, are being explored for possible...-
Document
Published: 30 Apr 1918
-
Data release - as updated [made at SA Director of Mines’ discretion] : Lake Phillipson. Annual reports to licence expiry/renewal, for the period 27/4/2000 to 8/8/2010.
During the sixth licence year, on renewed EL 2717 covering the same area as previously, the licensee, now a wholly owned subsidiary of AuIron Energy Limited (formerly Meekatharra Minerals Limited), progressed its investigations of the geology of the...-
Document
Published: 01 Sep 1916
-
Data release - as updated [made at SA Director of Mines' discretion] : Yeltacowie (part of the Mount Gunson Project). Annual reports for the period 7/10/2009 to 6/10/2013.
New work undertaken on EL 4187 during the 2009-2010 licence year has included: • Ongoing documentation and interpretation of MGD 55 & 56 • Drilling of MGD57 to 1243 m at Emmie Bluff prospect • Down hole EM and IP logging of MGD57 •...-
Document
-
Roopena. Progress reports and final report to licence expiry/full surrender, for the period 30/6/1986 to 29/6/1988.
TARGET: Uranium in Proterozoic rocks in areas where these largely concealed by alluvial or weathered materials. EXPLORATION: RAB drilling during March-April 1987 (87 vertical open holes totalling 3583 m), investigation of radiometric anomalies...-
Document
Published: 01 Jan 1988
-
Dingo Hill. Progress reports to licence expiry/renewal, for the period 23/3/1977 to 22/3/1979.
An area of the southern Stuart Shelf, with untested potential for hosting possible stratiform base metal deposits within a probable concealed Early Proterozoic sedimentary basin embayment, was explored by BP as part of their regional mineral...-
Document
-
Yalymboo, Dingo Hill and Black Oak Hill (the Cariewerloo Project). Joint annual reports and separate final reports to licence's respective expiry/full surrender, for the period 5/6/2006 to 20/6/2009.
Possible Mesoproterozoic unconformity-related uranium deposits within the Cariewerloo Basin, involving an inferred structural preparation component whereby basic intrusive members of the Gairdner Dyke Swarm cut across this unconformity in a manner...-
Document
Published: 19 Nov 1909
-
Wartaka [Homestead] (part of the Parkinson Dam Project). Annual reports [to the commencement of project licences' combined reporting] and final report to licence surrender, for the period 20/6/2003 to 30/6/2012.
An area located approximately 50 km west of Port Augusta has been explored for economic epithermal gold and silver mineralisation following the discovery of such mineralisation a short distance to the north on the licensee's adjoining EL 3307 / 4475....-
Document
-
Shell Lagoon. Annual reports and final report to licence expiry/full surrender, for the period 11/1/2001 to 7/5/2010.
Exploration for possible diamondiferous kimberlites in an area located immediately north-west and west of Woomera was undertaken to follow up promising reports of numerous kimberlitic indicator minerals detected by CRA Exploration in previous work...-
Document
Published: 08 Jun 1912
-
Yeltacowie, Hesso, Charlinga, Bowen Hill and Kangaroo Bluff (the Stuart Shelf Project). Joint annual reports and final report to licences' joint full surrender, for the period 16/8/2005 to 14/2/2014.
Uranium One Australia (U1A) acquired the Stuart Shelf Project tenements in 2005 with the aim of exploring for uranium mineralisation that has unconformity - related genetic features broadly analogous to those of deposits of the Athabasca Basin in...-
Document
Published: 28 May 1914
-
Wirramina (part of the West Roxby Project). Annual reports to licence expiry/transfer, for the period 7/3/2007 to 6/3/2012.
An area consisting of two separate sub-blocks, centred approximately 60 km west-northwest of Woomera, was taken up to explore the IOCG-U mineralisation potential of the concealed Mesoproterozoic metasedimentary cover and underlying Meso- to...-
Document
Published: 14 Apr 1912
-
Data release - as updated : Mount Paisley (part of the Mount Woods JV Project). Annual reports to the commencement of project licences' joint reporting, plus final report to licence expiry/full surrender, for the period 23/3/2000 to 10/5/2014.
Possible iron oxide - associated copper-gold (IOCG) type large base and precious metal deposits which may have formed within buried Proterozoic basement are being targeted in an area centred about 145 km south-east of Coober Pedy and 100 km north-west...-
Document
Published: 24 Jun 1914
-
Island Lagoon (part of the West Roxby Project). Annual reports to licence expiry/transfer, for the period 7/3/2007 to 6/3/2012.
An area centred approximately 30 km south-west of Woomera was taken up to explore the IOCG mineralisation potential of an isolated, circular outline regional gravity anomaly called the Island Dam prospect, seen to have a semi-coincident magnetic high...-
Document
Published: 19 Apr 1912