-
Roopena Station. Progress reports and final report to licence full surrender, for the period 22/5/1978 to 26/6/1985.
Exploration of an area situated between Whyalla, Iron Knob and The Bluff overlooking Myall Creek, 20 km south-west of Port Augusta, aimed to test for Olympic Dam - type Cu-U-Au mineralisation associated with products of igneous activity located in and...-
Document
Published: 09 Aug 1985
-
RB 90/00016 Beda Volcanics and Backy Point Formation of the eastern Gawler Craton.
Beda Volcanics and Backy Point Formation crop out in only a few localities on northeastern Eyre Peninsula, north of Whyalla, but drilling has shown them to extend for approximately 170 km to the north below younger cover. The Beda Volcanics comprise...-
Document
Published: 01 Feb 1991
-
Yeltacowie (part of the Stuart Shelf Project). Annual and final reports to licence surrender for the period 19/8/2005 to 19/2/2010.
Two licence subareas located in the north-eastern Cariewerloo Basin were taken up to explore for possible economic Athabasca Basin style, unconformity - related uranium deposits of potentially high grade (>25% U), similar to the McArthur River...-
Document
Published: 29 Nov 1910
-
South Vivian [Homestead]. Annual reports and final report to licence expiry/full surrender, for the period 12/6/2007 to 11/6/2009.
An area located on the northern Stuart Shelf between Olympic Dam and Prominent Hill, approx. 50 km south-southwest of the latter, has been explored for possible Olympic Dam type iron oxide - associated copper-gold (IOCG) deposits and for Canadian...-
Document
Published: 17 Oct 1909
-
Wirrida. Final report at licence expiry/full surrender for the period 24/4/2008 to 23/4/2009.
No field work - a review of previous exploration and an interpretation of geophysical datasets downgraded the prospectivity of the licence area, located 55 km south of Coober Pedy, for finding non- to weakly magnetic IOCG(-U) mineralisation within...-
Document
-
Mount Eba. Annual reports and final report to licence expiry/full surrender, for the period 20/10/2005 to 19/10/2008.
An area within the northern Stuart Shelf which extends from 15 to 65 km south of the Prominent Hill mine site has been explored for possible similar IOCG-U type economic mineral deposits by a new industry entrant uranium explorer, Uranium Exploration...-
Document
Published: 16 Jan 1909
-
Mount Paisley (part of the Mount Woods Project). Fourth partial surrender report for the period 23/3/2000 to 8/8/2009.
Exploration Licence 3387 (Mt Paisley) is located about 110 km north-west of Woomera, 110 km west-northwest of Olympic Dam, and 45 km south-east of Prominent Hill. The EL lies within the Woomera Prohibited Area (WPA), and most of the tenement covers...-
Document
-
Bookabie. Annual reports to licence expiry/full surrender, for the period 8/10/2013 to 7/10/2016.
An area centred ~85 km west-northwest of Ceduna has ben explored for possible buried Ni±Cu±Co±Cr±PGE mineralisation of either Thomson Nickel Belt or Nova-Bollinger deposit styles, that may be associated with ultramafic–mafic rocks at four prospects...-
Document
Published: 07 Nov 1916
-
Data release [made at SA Director of Mines' discretion] : Yeltacowie (part of the Mount Gunson Project). Annual reports for the period 30/7/2003 to 6/10/2009.
The subject EL 3112 ground represents the continuation of tenure by Gunson Resources, over the same area, from its former EL 2516 Yeltacowie (for which see the relevant licence reports previously released in Envs 9530 and 9715). This replacement...-
Document
-
The Lake Torrens Project; plus the Olympic Domain Project. Joint annual reports for the period 1/1/2006 to 31/12/2010.
Licensee Copper Range originally took up a group of three tenements located in central South Australia covering areas within and west of Lake Torrens, with the intent, much reinforced following the Carrapateena deposit discovery made in 2005, of...-
Document
Published: 04 Mar 1911
-
Myola. Annual reports and final report to licence full surrender, for the period 8/11/1996 to 29/7/2003.
Palaeoproterozoic gold, copper and base metal occurrences were the targets of exploration in an area surrounding the Iron Baron mine that, in a tectonic sense, incorporates parts of the Cleve, Middleback and Moonta Subdomains. Regional calcrete...-
Document
-
Tarcoola. Data release made in lieu of a 25% first partial relinquishment at licence renewal: [Part 2 of 2] progress reports for the period 19/7/1984 to 6/12/1990. Part 1 of 2 also included.
Exploration of the Tarcoola Gold Field by Aberfoyle Resources began in mid-1984, following a partial relinquishment of other ground at licence renewal, when some promising gold assay values were detected from rock and mine dump sampling. Geological...-
Document
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 1 partnership DPY1-36, Roopena area copper/gold mineral prospects. Project interim and final reports.
Three previously untested, significant gravity anomalies were the targets for 4 exploratory vertical RC drillholes totalling 750 m, put down in areas west and north-west of Whyalla by Minotaur Exploration with funding assistance from PIRSA through its...-
Document
-
Data release - as updated [made at SA Director of Mines' discretion] : Mount Double. Annual reports for the period 24/11/2005 to 28/9/2018.
Exploration is being conducted for possible buried economic iron oxide - associated copper-gold (IOCG) mineral deposit targets within the south-central Gawler Ranges. During the first licence year, Minotaur's activities focussed on completing a...-
Document
Published: 22 Nov 1912
-
Data release - as updated [made at SA Director of Mines' discretion] : Wartaka, Iron Knob, Reid Lookout and Old Wartaka (the Parkinson Dam Project). Annual reports and joint annual reports for the period 17/2/2005 to 26/4/2019.
Four small, adjacent licences located on the south-eastern, shallow subcrop margin of the Gawler Ranges, which together make up an area centred about 25 km north-east of Lake Gilles and 60 km west of Port Augusta, are being explored for possible...-
Document
Published: 30 Apr 1918
-
Data release - as updated [made at SA Director of Mines' discretion] : Yeltacowie (part of the Mount Gunson Project). Annual reports for the period 7/10/2009 to 6/10/2013.
New work undertaken on EL 4187 during the 2009-2010 licence year has included: • Ongoing documentation and interpretation of MGD 55 & 56 • Drilling of MGD57 to 1243 m at Emmie Bluff prospect • Down hole EM and IP logging of MGD57 •...-
Document
-
Final Report - Unravelling the Stratigraphy of the Middleback Ranges ADI RD03-385 [Accelerated Discovery Initiative Round 3, 2023].
In 2022 SIMEC Mining/Onesteel Manufacturing Pty Ltd successfully applied for up to $270,000 of funding through the South Australian Government’s Accelerated Discovery Initiative (ADI) program. The company proposed to undertake RC and diamond drilling...-
Document
-
Dingo Hill. Progress reports to licence expiry/renewal, for the period 23/3/1977 to 22/3/1979.
An area of the southern Stuart Shelf, with untested potential for hosting possible stratiform base metal deposits within a probable concealed Early Proterozoic sedimentary basin embayment, was explored by BP as part of their regional mineral...-
Document
-
ExpNotes WINTINNA: Explanatory Notes WINTINNA
A new generation, first edition WINTINNA 1:250 000 scale geological map and explanatory notes have been published. These documents represent the conclusion of the Geological Survey of South Australia's geological mapping program undertaken in the...-
Document
-
Yalymboo, Dingo Hill and Black Oak Hill (the Cariewerloo Project). Joint annual reports and separate final reports to licence's respective expiry/full surrender, for the period 5/6/2006 to 20/6/2009.
Possible Mesoproterozoic unconformity-related uranium deposits within the Cariewerloo Basin, involving an inferred structural preparation component whereby basic intrusive members of the Gairdner Dyke Swarm cut across this unconformity in a manner...-
Document
Published: 19 Nov 1909