-
Lake Bring. Quarterly reports, first joint annual report (with SML 710) and joint final report to licence full surrender, for the period 1/9/1971 to 31/5/1973.
TARGET: Sedimentary uranium associated with high order radiometric anomalies over lakes on the edge of the sand dune country, east of the Nullarbor Plain. EXPLORATION: Closely spaced (300-500 m), low level (65 m altitude) aerial scintillometer...-
Document
Published: 26 Jun 1973
-
RB 83/00071 Stratigraphic framework of Tertiary duricrusts and weathering profiles, east margin of the Eucla Basin, southern Australia.
Deeply weathered rocks are evident from Late Cretaceous to (Late) Middle Eocene, followed by two major periods of duricrust formation in Oligocene - Early Middle Miocene.-
Document
Published: 01 Jan 1983
-
RB 76/00119 Silcrete sediments and stratigraphy.
There is no abstract created for this record-
Document
Published: 01 Jan 1976
-
RB 88/00050 Volcanic and sedimentary rocks from the Wirrulla region, Gawler Craton, South Australia.
Volcanic rocks from the Wirrulla region include dacites, rhyodacites and rhyolites. They comprise both magmatic and pyroclastic types, and are similar to the Gawler Range Volcanics. Sedimentary rocks from the same region include quartz sandstones...-
Document
Published: 01 Aug 1988
-
RB 90/00014 Explanatory Notes for the TALLARINGA 1:250 000 geological map.
There is no abstract created for this record-
Document
Published: 01 Mar 1991
-
Tallaringa and Mount Igy (the Tallaringa JV Project). Joint annual reports to licences' joint full surrender, for the period 18/1/2009 to 6/2/2015.
During the 2009-2010 project joint reporting year, the following activities occurred: - the conduct of an Aboriginal heritage work area clearance survey in the northern part of EL 3485 Tallaringa by the Antakarinja Land Management Council Native...-
Document
-
Data release [made at SA Director of Mines’ discretion] : Flinders Island and Flinders Island Coast. Annual, joint annual and combined annual reports for the period 4/1/1999 to 3/1/2009.
A renewed effort to determine the diamond mineral potential of the 15.6 square km of land comprising Flinders Island was instigated during January 1999, under tenure of EL 2577, by Orogenic Exploration Pty Ltd, a company related to the previous...-
Document
Published: 06 Jun 1909
-
Wilkinson Lakes East. Annual reports plus final report to licence full surrender, for the period 3/5/2010 to 6/2/2015.
An area centred ~150 km west of Coober Pedy, that is located mostly north-west of and that also has a small part lying immediately south-east of the Karari Fault, a major crustal structure which has controlled deposition at the southern limit of the...-
Document
-
Data release [made at SA Director of Mines' discretion] : North-western Eyre Peninsula (eastern Eucla Basin) heavy mineral sands exploration tenement group [Group 3]. Joint annual reports for the period 1/7/2004 to 31/5/2010. [Index part 2 of 2].
Within the subject south-eastern Eucla Basin tenements, Iluka's ongoing exploration has targeted the Tertiary-aged beach sands deposited during the five marine incursions that occurred from the Middle Eocene to the Pliocene, with a focus on exploring...-
Document
Published: 01 Sep 1910
-
The Eyre Peninsula Joint Venture Project. Joint annual reports for the period 19/9/2002 to 31/12/2008.
A number of tenements on central northern Eyre Peninsula are being explored by Adelaide Resources and its joint venture partner Newmont Mining for possible economic buried deposits of gold, copper and other base metals which may have formed in the...-
Document
Published: 27 Feb 1909
-
Data release - as updated [made at SA Director of Mines' discretion] : Aurora Tank and Indooroopilly Outstation. Joint annual reports for the period 21/3/2011 to 20/3/2013.
Two separate tenements in the Challenger district which are now wholly owned by Marmota Energy Limited are being explored for possible economic buried Challenger style gold mineralisation that may be present within Archaean basement, and also, within...-
Document
Published: 12 Jul 1913
-
Garford. First annual report plus final report to licence expiry/full surrender, for the period 16/4/2018 to 15/4/2020.
An area centred ~140 km north-west of Tarcoola and ~20 km north of the Challenger gold mine has been explored for possible economic high grade occurrences of palygorskite (synonym attapulgite) clays which may have formed in Tertiary palaeochannels and...-
Document
-
Lake Anthony. Quarterly reports, first joint annual report (with SML 711) and joint final report to licence full surrender, for the period 1/9/1971 to 31/5/1973.
An area located just to the east of the edge of the Nullarbor Plain, occupied by many scattered large and small salt lakes surrounded by sand dunes, with Precambrian basement [of the western Gawler Craton] subcropping near the surface, has been...-
Document
Published: 26 Jun 1973
-
Garford Homestead. Progress and final reports to licence expiry for the period 12/4/1983 to 11/4/1984.
After a regional review of the absorbent clay mineral potential of known palygorskite and attapulgite - bearing Middle Tertiary palaeochannel sediments in an area centred 110 km south-west of Coober Pedy, a possibly economic partly-exposed attapulgite...-
Document
Published: 21 Jun 1984
-
Sandstone. Progress reports for the period 18/12/86 to 18/12/90.
TARGET: Palygorskite (absorbent clay) in playa lakes within the Garford Palaeochannel. EXPLORATION: Trenching and 10-20 kg bulk sampling of known dolomitic palygorskite occurrences (15 backhoe cuts in seven lake depressions, to 3.6 m below surface,...-
Document
Published: 12 Dec 1990
-
Thurlga Ramp (part of the Eyre Peninsula Project, Corrobinnie Uranium JV and Thurlga JV periods). Data release : final report at licence expiry/full surrender, for the period 1/1/2013 to 3/5/2019.
During the report period, licensee Andromeda Metals did no on-ground exploration. During its agreed 3-year earn-in period, joint venturer Investigator Resources undertook the following work described herein: - acquisition of high resolution aerial...-
Document
Published: 19 Jul 1919
-
Data release - as updated [made at SA Director of Mines’ discretion] : Flinders Island and Flinders Island Coast. Joint annual reports for the period 4/1/2009 to 3/1/2019.
During licence Year 11, the lithological logs were digitised and are now presented for the remaining eight holes of the first drilling program (completed in 2002), together with the holes from the second (2003), and third (2004) drilling programs....-
Document
Published: 01 Mar 1919
-
RB 00843 Geology of the Maralinga area, South Australia.
Maralinga is located on the crest of the Ooldea Range, an ancient (Tertiary) coastal dune which is bounded to the south by the Nullarbor Plain and to the north by Tietkens Plain. The dune field of the Great Victoria Desert covers much of the region...-
Document
-
RB 00855 Maralinga hydrogeological and geotechnical site investigation - Stage 1.
Hydrogeological and geotechnical information is provided for a comparative cost study of competing proposals for the permanent disposal of soil lightly contaminated with nuclear materials. A total of 19 open boreholes and 6 cored boreholes were...-
Document
-
Centre Hill (the Kingoonya JV Project). Annual reports to licence expiry/full surrender, for the period 7/3/2006 to 10/5/2012.
An area extending for approximately 80-115 km south-east of Tarcoola has been explored for possible economic mesothermal gold±copper mineralisation formed in Mesoproterozoic igneous basement, possible unconformity - related uranium mineralisation at...-
Document
Published: 12 Jul 1912