-
North Fowlers Bay - Chundaria. Annual reports and progress reports for the periods 15/9/1993 to 14/9/1998, and 28/10/1998 to 12/3/1999.
North Ltd's Barton Project commenced in 1990 across a number of licences progressively taken out over the western Gawler Craton, which eventually came to include EL 1865. Initial exploration for heavy mineral sand in the Barton-Ooldea area, 100-200...-
Document
Published: 06 May 1999
-
Chitanilga Hill. Data release at licence renewal : second partial surrender report, for the period 12/6/2003 to 11/6/2008.
In October 2003, Minotaur Exploration completed part of a regional infill ground gravity survey over the now relinquished portion of EL 3100, along N-S lines at a station spacing of 1 km x 2 km. A significant gravity anomaly which coincides with an...-
Document
-
Port Broughton, Redhill and Mount Remarkable - Port Augusta areas (part of the Moonta North Project ELs combined reporting group). Annual reports and joint final report at licences' surrender, for the period 19/4/2002 to 22/5/2006.
Economic deposits of iron-oxide associated copper-gold mineralisation of the Moonta-Wallaroo or Olympic Dam style, hosted in Palaeoproterozoic basement rocks of the Moonta Sub-domain, were targeted by exploration in three now surrendered licences,...-
Document
-
Mabel Creek. Annual reports submitted until the commencement of joint licence reporting on the Mabel Creek JV Project tenements, for the period 20/12/1999 to 23/3/2006.
Exploration currently underway for possible economic buried iron oxide - associated copper-gold (IOCG) mineralisation within Proterozoic basement on the Mabel Creek High, in one of two joint venture group project licence areas located approximately 50...-
Document
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 1 partnership DPY1-46, western Gawler Range Volcanic Province mineral prospects. Project interim and final reports.
An area of the Gawler Range Volcanic Province that straddles the southern portion of the Yarlbrinda Shear Zone, 80 km south of Kingoonya, and which contains mylonitised and sericite-altered Palaeoroterozoic intrusive rocks, was the target for three...-
Document
-
Unlocking South Australia's Mineral and Energy Potential - A Plan for Accelerating Exploration. Theme 2 (drilling partnerships with PIRSA and industry) : Year 4 partnership no. DPY4-65, Chianti mineral prospect. Project completion dataset.
The subject set of reports describes the results of PACE Initiative Year 4 partly-subsidised drilling work conducted in the vicinity of the Chianti prospect, which lies approx. 20 km north of the old Mount Gunson mining camp. The aim of this work,...-
Document
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 3 partnership DPY3-57, Streaky Bay area gravity highs and lows - IOCG and sedimentary uranium mineral prospects. Project final report.
As part of the PACE Initiative Year 3 subsidised drilling programmes, Minotaur Exploration proposed exploring a large tenement package in the Streaky Bay area simultaneously for Prominent Hill style iron oxide copper gold (IOCG) and palaeochannel...-
Document
-
Yerda Well. Second partial surrender report, for the period 20/1/2004 to 19/1/2008.
Exploration for possible buried economic iron oxide - associated copper-gold (IOCG) mineral deposit targets within the subject area of the north-western Gawler Ranges utilised existing and newly acquired regional gravity data to attempt to identify...-
Document
-
Mount Paisley (part of the Mount Woods Project). Fourth partial surrender report for the period 23/3/2000 to 8/8/2009.
Exploration Licence 3387 (Mt Paisley) is located about 110 km north-west of Woomera, 110 km west-northwest of Olympic Dam, and 45 km south-east of Prominent Hill. The EL lies within the Woomera Prohibited Area (WPA), and most of the tenement covers...-
Document
-
Kottata Well and Broadacres (part of the Yaninee Project). Final report at licences' joint full surrender, for the period 29/9/2003 to 5/6/2008.
Mineral exploration in the Streaky Bay district has addressed the potential for finding Prominent Hill - style Proterozoic IOCG deposits, Phanerozoic iron-depleted gold mineralisation, and Tertiary palaeochannel - hosted sedimentary uranium...-
Document
-
Bulgunnia, Gosse and Kingoonya (the Mentor Project). Data release made at the surrender of subsequent licences : annual reports for the period 27/10/1992 to 15/11/1997. [Index entry Part 1 of 2 - a very long abstract is split between these two parts].
The Gawler Joint Venture partners (Dominion Mining and Resolute Resources) have been exploring three near-contiguous areas located in the north of the Tarcoola - Kingoonya district, seeking possible economic concealed epithermal/mesothermal...-
Document
-
Andamooka Creek, Willaroo Dam, Island Dam and Stuart Shelf / Andamooka Ranges (the Stuart Shelf Project). Joint annual reports on activities undertaken by the Joint Venture consortium, for the period 11/10/1996 to 10/10/2009 [ Index Part 2 of 2 ].
As a result of the BHP Billiton takeover of the Stuart Range Project, the mineral exploration strategy was changed. Formerly, WMC had been looking for economical targets of >500 Mt size containing on average more than 2.4% copper equivalent....-
Document
-
Mount Arden (part of the Six Mile Hill Project). First annual report, plus second annual/final report to licence expiry/full surrender, for the period 13/10/2014 to 12/10/2016.
An irregular area covering pastoral land ~15 km to the immediate west and north-west of Port Augusta has been explored for possible economic buried IOCG and other significant metallic mineralisation, which could have formed in the vicinity of the...-
Document
-
Kimba. Third partial surrender report submitted at licence expiry/renewal, for the period 6/11/2006 to 5/11/2016.
63 square km or 23% of the former area of EL 4938, in two separate blocks, has recently been relinquished due to a lack of encouraging results, and difficulty with land access onto certain private properties located therein due to some farmers’...-
Document
-
PACE Discovery Drilling (drilling partnerships with DSD and industry): Year 8 partnership DPY8-28 - Cultana district, Eyre Peninsula, Extension Tank shear-hosted Mesoproterozoic IOCG-U or porphyry type Au and base metal prospect. Drilling final report.
An area centred approximately 50 km south-west of Port Augusta is being explored for buried economic occurrences of gold, base metals and uranium primary mineralisation which may be genetically associated with the past emplacement there of the Gawler...-
Document
-
Wudinna Hill. Annual and final report for the period 3/11/97 to 2/11/98.
Three weak gold anomalies (max. 5 ppb) and patchy, weakly elevated copper values were detected in calcrete sampled over an area extending for 20 km immediately north-east of Wudinna.-
Document
-
Roopena and Iron Knob. Joint progress reports, joint annual reports and final report to licences' joint full surrender, for the period 22/4/1992 to 23/2/2000.
Exploration for Mount Isa style, Fe-oxide associated Cu-Au mineralisation has targeted Whyalla Group metasediments and associated Hiltaba Suite granitic intrusions within a 110 km long x 15 km wide, north - south aligned corridor situated west of...-
Document
-
Seven Mile Swamps (part of the Euria Project). Annual report and progress report to licence full surrender, for the period 31/5/1996 to 10/2/1998.
Calcrete sampling, mapping, and RAB and aircore drilling (211 holes, total 7334 m) were carried out 20 km north of Penong, in an area underlain by Hiltaba Suite granitoids, Archaean gneisses and a major associated shear zone. Although geochemical...-
Document
Published: 18 Dec 1997
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 1 partnership DPY1-36, Roopena area copper/gold mineral prospects. Project interim and final reports.
Three previously untested, significant gravity anomalies were the targets for 4 exploratory vertical RC drillholes totalling 750 m, put down in areas west and north-west of Whyalla by Minotaur Exploration with funding assistance from PIRSA through its...-
Document
-
Data release [made at SA Director of Mines' discretion] : Caralue and Kimba (the Ellemby Project, prior to inclusion as part of the East Eyre Peninsula Project). Joint annual reports for the period 6/11/2007 to 5/11/2010.
Two adjacent areas which are respectively centred near and to the south-west of Kimba are being explored for buried basement-hosted gold and nickel mineralisation, and, following establishment of a joint venture, for possible IOCG type deposits and...-
Document