-
Data release - as updated [made at SA Director of Mines' discretion] : Mount Hope. Annual reports for the period 12/4/2002 to 14/3/2019.
Exploration of an area located on western Eyre Peninsula between Sheringa and Mount Hope is continuing, with the intent of discovering economic buried base and precious metal deposits of volcanogenic sediment-hosted massive sulphide (VHMS) style...-
Document
-
Data release [made at SA Director of Mines' discretion] : Lake Gilles. Annual reports submitted until the commencement of the Eurilla JV Project licences' joint reporting, for the period 30/1/2007 to 29/1/2010.
A sparsely drill-tested area centred about 10 km west of Lake Gilles is being explored for a variety of buried, possibly economic basement-hosted polymetallic mineralisation occurrences, including deposits of Menninnie Dam style Pb-Zn-Ag (Cu-Au),...-
Document
Published: 30 Mar 1910
-
Mount Hill - Koppio and Green Patch areas (part of the Southern Eyre Peninsula Project). Joint second and first respectively partial surrender report, for the period 6/8/2007 to 9/2/2017.
Five exploration licences on southern Eyre Peninsula have been explored by Centrex Metals for possible buried economic magnetite mineralisation. Portions of the two subject ELs were recently relinquished due to their perceived diminished prospectivity...-
Document
Published: 20 Jul 1917
-
Data release [made at SA Director of Mines' discretion] : Mount Hill - Tod River area. Annual reports [to the commencement of the Northern Eyre Peninsula Project licences' combined reporting status] for the period 13/3/2002 to 12/3/2005.
An area which has had little exploration for iron ore done previously was taken up by Centrex Metals Ltd to cover potentially magnetite-rich Early Proterozoic banded iron formation (BIF) strata outcrops and subcrop located within the Lincoln Uplands...-
Document
-
Data release [made at SA Director of Mines’ discretion] : Gum Flat. Annual reports submitted prior to the commencement of joint reporting on the Gum Flat Iron Ore Project, for the period 27/9/2005 to 26/9/2008.
An area lying immediately west of Port Lincoln and extending for ~10 km inland is being explored for buried occurrences of multiple metallic mineral commodities that may have been deposited within faulted, folded and metamorphosed Archaean basement...-
Document
Published: 20 Nov 1907
-
Gilles Downs (part of the West Middleback Project). First partial surrender report, for the period 8/7/2005 to 7/7/2008.
Three small areas totalling 150 square km have been relinquished from the western extremities of the two sub-blocks forming the subject licence. The only work conducted on this ground was the acquisition for the licensee during February 2007 of parts...-
Document
Published: 20 May 1908
-
Data release [made at SA Director of Mines' discretion] : Tumby Bay. Annual reports [to the 24/11/2006 commencement of the Eyre Peninsula Project licences' combined reporting status] for the period 18/1/2002 to 17/1/2007.
Exploration Licence 2887 Tumby Bay was taken out to cover prospective magnetite rich Banded Iron Formations (BIF) close to the eastern coast of the Eyre Peninsula. Potential was seen for a magnetite concentrate export operation taking advantage of...-
Document
Published: 05 Mar 1907
-
Moseley Nobs (part of the Wilcherry Project). First partial surrender report, for the period 23/3/2017 to 22/3/2019.
The easternmost and westernmost thirds (portions totalling ~52%) of the former area of EL 5931, located approximately 30 km north of Kimba, have been relinquished due to their perceived diminished prospectivity for economic buried occurrences of...-
Document
-
Moseley Nobs and Uno [West] (part of the Wilcherry Project). Second partial surrenders' respectively combined report, for the overall period 1/11/2014 to 7/4/2021.
14 square km or 35% of the former area of EL 5931, and 3 square km or ~5.2% of the former area of EL 6379, have recently been relinquished due to their now perceived diminished prospectivity for buried base and precious metal mineralisation. Work...-
Document
Published: 17 May 1921
-
Pinkawillinie (part of the Wilcherry Project). Final report at licence full surrender, for the period 1/11/2012 to 10/4/2019.
An area originally consisting of three separate licence sub-blocks that are centred ~30 km north-west of Kimba has been explored for possible economic buried occurrences of basement-hosted epithermal/hydrothermal/metamorphic gold, silver, iron,...-
Document
-
Mount Miccollo (part of the Wilcherry Project). Second and third partial surrender report, for the period 10/6/2011 to 27/5/2021.
An area centred ~100 km west of Port Augusta is being explored for possible economic buried, basement-hosted occurrences of epithermal/hydrothermal/metamorphic gold, silver, iron, uranium, and base metals mineralisation. On the now relinquished...-
Document
-
Uno (part of the Wilcherry Project). First partial surrender report, for the period 29/7/2009 to 24/1/2020.
An area centred ~105 km west-southwest of Port Augusta is being explored for possible economic buried, basement-hosted occurrences of epithermal/hydrothermal/metamorphic gold, silver, iron, uranium, and base metals mineralisation. On the now...-
Document
-
Uno [West] and Eurilla Dam (part of the Wilcherry Hill Project). Third and first partial surrenders' respectively combined report, for the overall period 10/10/2002 to 7/4/2022.
17 square km or ~65% of the former area of EL 5931, and 14 square km or ~12% of the former area of EL 6072, have recently been relinquished due to their now perceived diminished prospectivity for buried base and precious metal mineralisation. Work...-
Document
-
Data release - as updated [made at SA Director of Mines’ discretion] : Middleback Range and Moonabie Hills. Joint annual reports for the period 1/2/2007 to 30/1/2019, plus surrender reports to 9/7/2023.
Project Connelly is designed to target haematite mineralisation on OneSteel's mining and exploration leases, including EL 3516 Middleback Range, with the aim of adding to the haematite reserve. In addition to the exploration programme, reserve...-
Document
Published: 29 Mar 1918
-
Eastern Eyre Peninsula. Progress reports and final report to licence expiry/full surrender, for the period 25/10/1976 to 24/10/1978.
Stratabound, metasedimentary iron ore was the principal target of exploration undertaken by BHP over a large area surrounding the Moonabie Range that extends along strike and borders the north-western side of Spencer Gulf. Base and precious metals...-
Document
-
RB 62/00041 Report on gravity and magnetic survey over an aeromagnetic anomaly, Warunda Cummins 1-mile sheet.
The gravity and magnetic anomalies mapped suggest a buried basement ridge 200-300 feet high, rising to within about 70 feet of the surface and containing a narrow, vertical band of magnetic material. This is possibly minute amounts of magnetite in a...-
Document
Published: 01 Jan 1966
-
Cockabidnie North. Annual reports to licence expiry/full surrender, for the period 18/1/2006 to 17/1/2010.
A small (11 square km) area located approximately 40 km south of Kimba has been explored for possible economic uranium, gold or base metal deposits, including Menninnie Dam style lead-zinc-silver mineralisation, that may have formed in Archaean to...-
Document
Published: 12 Mar 1910
-
Green Patch. Annual reports for the period 3/12/2001 to 30/5/2006, plus the last six years of tenure' combined annual reports/final report ('no work' letter only) to licence expiry/full surrender, for the period 1/2/2015 to 31/8/2021.
An area centred on the hamlet of Green Patch, located ~10 km north-west of Port Lincoln, was taken up to appraise the iron ore potential of known near surface BIF magnetite mineralisation occurring at the Greenpatch (sic) prospect that had been...-
Document
Published: 16 Oct 1921
-
Data release - as updated : Cockabidnie. Annual reports and final report to licence expiry/full surrender, for the period 31/5/2001 to 13/8/2015.
Early in 2001, Helix Resources Ltd entered into a joint venture agreement with Centrex Resources Limited to allow it to explore for precious and base metals on some of the tenements held by Centrex on the Eyre Peninsula in South Australia, including...-
Document
-
Data release [made at SA Director of Mines’ discretion] : Stony Hill (part of the Northern Eyre Peninsula Project). First annual report (submitted prior to start of the project's joint reporting status), for the period 2/12/2004 to 1/12/2005.
A licence area covering the subdued hilly terrain lying a short distance to the west of the northern Middleback Range on north-eastern Eyre Peninsula was taken up to explore for possible economic buried deposits of stratabound magnetite iron ore which...-
Document