-
RB 90/00076 Kanmantoo Trough geological investigation - Karinya Syncline regional soil sampling.
Regional soil sampling has targeted the pyritic-carbonaceous Cambrian Karinya Shale and rock units immediately above and below it, along with lineament and structural features. Three prospect areas, Frankton, The Gap and Accommodation Hill, have been...-
Document
Published: 01 Nov 1990
-
RB 91/00019 Kanmantoo Trough geological investigations Karinya Syncline detailed geochemical surveys.
Results of earlier regional soil sampling conducted by SADME across the Karinya Shale, plus tectonic/structural considerations, had identified 3 prospect areas, Frankton, The Gap and Accommodation Hill, for follow-up mapping, soil sampling, and the...-
Document
Published: 01 Feb 1991
-
Mount Karinya. Annual reports to licence expiry/full surrender, for the period 5/8/1999 to 4/8/2002.
During September 1999, a single diamond drillhole, fully cored to 599 m total depth, was put down within the Karinya Syncline 12 km south-east of Eudunda, targeting possible economic buried syngenetic - epigenetic Pb-Zn-Ag mineralisation hosted in...-
Document
Published: 14 Jul 1901
-
Frankton (part of the Karinya Zinc Exploration Project). Annual reports to licence expiry/full surrender, for the period 16/9/2005 to 15/9/2009.
Exploration for possible economic stratiform/stratabound, volcanogenic-epigenetic lead-zinc mineralisation hosted within lower Kanmantoo Group metasediments of middle Cambrian age, over a small area located approximately 80 km north-east of Adelaide,...-
Document
Published: 03 Mar 1910
-
Australia Plains. Annual reports plus final report to licence expiry/full surrender, for the period 3/5/2010 to 2/5/2015.
An area centred ~15 km east of Eudunda, in the north-eastern Mount Lofty Ranges, has been explored initially for possible economic outcropping stratabound/replacement style phosphate mineralisation that may have formed within Adelaidean dolomitic...-
Document
Published: 25 Jun 1915
-
Truro. First annual report plus final report to licence full surrender, for the period 13/9/1996 to 30/3/1999.
Following earlier identification by PIRSA of mineralised gossans located at the stratigraphic contact between the Cambrian Karinya Shale and Backstairs Passage Formation, exploration comprising rock chip, soil and stream sediment geochemical sampling,...-
Document
Published: 27 Jul 1998
-
Interpreted basement geology to the Murray Basin and surrounds.
The purpose of this interpretation is to provide an initial framework for the basement to the Murray Basin upon which to plan the Geological Survey of South Australia’s MinEx CRC National Drilling Initiative drilling project targeting the Delamerian...-
Map
Published: 07 Jul 2020
- PDF,
- ZIP
-
Truro. Progress reports and annual reports to licence expiry/renewal, for the period 15/7/1991 to 14/7/1996.
CRA's acquisition and interpretation of aeromagnetic and ground magnetic surveys, plus its gravel and stream sediment sampling, have successfully located a few kimberlites in the Truro area, 70 km north-east of Adelaide, where a large number of...-
Document