Skip to content
Search Home
SARIG catalogue
  • HomeHome
  • Search Records
  • FAQs
  • Vocabularies
  • SARIG map SARIG map
  1. Datasets

Datasets

The mesac Open Data Portal datasets contain detailed records of seismic surveys and geochemical data, and they are made available here to industry, researchers and the public.
FILTER RESULTS
RESET
draw to search by area BY DRAWN AREA
RESET
Location SA

TYPE OF RECORD

  • document - (24)

TOPIC

  • Geoscientific Information - (24)

CATEGORY TYPE

  • Earth Sciences - (24)
    • Geochemistry - (24)
      • Exploration Geochemistry - (24)
      • Hydrogeochemistry - (4)
      • Biogeochemistry - (1)
      • Organic Geochemistry - (1)
    • Geology - (24)
      • Petrology - (24)
        • Igneous And Metamorphic Petrology - (14)
        • Sedimentary Petrology - (3)
      • Stratigraphy - (24)
      • Mineral System Geology - (23)
      • Resource Geology - (23)
        • Mineral Resource Geology - (24)
        • Geothermal Resource Geology - (1)
      • Basement Geology - (20)
      • Mineralogy And Crystallography - (16)
      • Regional Geology - (13)
      • Sedimentology - (13)
      • Historical Geology - (11)
      • Volcanology - (9)
      • Surface Geology - (4)
      • Geochronology - (1)
      • Marine Geoscience - (1)
    • Geophysics - (24)
      • Petrophysics - (24)
      • Electrical And Electromagnetic Methods In Geophysics - (23)
      • Magnetics - (23)
      • Gravity - (19)
      • Radiometrics - (14)
      • Seismology And Seismic Exploration - (1)
    • Physical Geography - (11)
      • Hydrogeology - (7)
      • Surfacewater Hydrology - (5)
      • Geomorphology And Regolith And Landscape Evolution - (3)
      • Paleoclimatology - (1)
      • Quaternary Environments - (1)
      • Surface Processes - (1)
  • Engineering - (24)
    • Geomatic Engineering - (22)
      • Geospatial Information Systems - (6)
      • Photogrammetry And Remote Sensing - (1)
      • Remote Sensing - (1)
    • Resources Engineering - (22)
      • Drilling Engineering - (24)
      • Mineral Processing/Beneficiation - (1)
      • Mining Engineering - (1)
      • Petroleum And Reservoir Engineering - (1)
  • Policy And Administration - (22)
  • Information And Computing Sciences - (14)
    • Artificial Intelligence And Image Processing - (8)
      • Image Processing - (7)
      • Computer Graphics - (2)
      • Expert Systems - (1)
  • Mineral Resources (Excl. Energy Resources) - (13)
    • Mineral Exploration - (24)
    • Primary Mining And Extraction Of Mineral Resources - (2)
  • Energy - (11)
    • Energy Exploration - (13)
  • Environmental Sciences - (10)
    • Environmental Science And Management - (9)
      • Environmental Management - (3)
      • Natural Resource Management - (3)
    • Soil Science - (8)
      • Soil Chemistry - (6)
  • Cultural Understanding - (3)
  • History And Archaeology - (2)
    • Conserving Aboriginal And Torres Strait Islander Heritage - (3)
    • Archaeology - (1)
  • Built Environment And Design - (1)
    • Urban And Regional Planning - (1)
      • Land Use And Environmental Planning - (1)

DOCUMENT TYPE

  • Mineral Company Report - (21)
    • Mineral Exploration - (21)
  • Departmental Publication - (3)
    • Geological Survey Geoscience Publication - (3)

COMMODITY

  • Critical minerals - (24)
  • precious metal - (21)
  • copper - (15)
  • gold - (13)
  • uranium - (10)
  • rare earth element - (7)
  • industrial material - (5)
  • iron ore - (4)
  • gypsum - (2)
  • iron - (2)
  • magnetite - (2)
  • silver - (2)
  • baryte - (1)
  • Heavy mineral sands - (1)
  • lead - (1)
  • manganese - (1)
  • platinum group metal - (1)
  • potassium - (1)
  • zinc - (1)

GEOLOGICAL PROVINCE

  • Gawler Craton - (19)
  • Stuart Shelf - (18)
  • Olympic Domain - (10)
  • Cariewerloo Basin - (4)
  • Adelaide Geosyncline - (1)
  • Gawler Range Volcanic Province - (1)
  • Pirie Basin - (1)
  • Torrens Hinge Zone - (1)

STRATIGRAPHY

  • Pandurra Formation - (24)
  • Gawler Range Volcanics - (14)
  • Tapley Hill Formation - (11)
  • Tregolana Shale Member - (10)
  • Beda Basalt - (5)
  • Hiltaba Suite - (5)
  • Woocalla Dolomite Member - (5)
  • Donington Suite - (4)
  • Whyalla Sandstone - (4)
  • Hutchison Group - (3)
  • Umberatana Group - (3)
  • Callanna Group - (2)
  • Corraberra Sandstone Member - (2)
  • Gairdner Dolerite - (2)
  • Lincoln Complex - (2)
  • Muckanippie Suite - (2)
  • Mulgathing Complex - (2)
  • Simmens Quartzite Member - (2)
  • Tarcoola Formation - (2)
  • Tent Hill Formation - (2)

FORMAT

  • PDF - (22)

UPDATE FREQUENCY

There are no UPDATE FREQUENCY that match this search

PUBLICATION DATE

Specific date: 1980, 20/04/1980, 04/1980

Date range: 1980-2022, 04/1980-08/1990

close
Search records
ADVANCED KEYWORD SEARCH
Include the following keywords:

24 records found

Stratigraphy: Pandurra Formation Category type: Petrophysics Commodity: Critical minerals

Filter Results
  • Woomera, Emmie Bluff, Salt Creek, Portulacca Ridge and Red Lake. Progress reports for the period 21/8/1979 to June 1983.

    Continuing exploration in the Woomera area has included the acquisition of a ground magnetic and gravity survey over the Buller Dam anomaly, which lies on the western flank of the Acropolis aeromagnetic anomaly, and this work confirmed that the former...
      Document
    • PDF
  • The MIM-Peko Stuart Shelf Joint Venture Project. Progress reports to licences' joint full surrender and their re-issue as a single replacement tenement, for the period 15/2/1983 to 20/10/1989.

    Exploration for Olympic Dam-style Cu-Au-U mineralisation, undertaken over areas to the south-east of Arcoona Homestead and in the vicinity of Woomera township, has comprised numerous reconnaissance and then detailed gravity, ground magnetic and CSAMT...
      Document
    • PDF
  • Emmie Bluff. Progress reports to licence expiry/full surrender, for the period 28/10/1978 to 11/2/1983.

    Ongoing exploration for Olympic Dam-style Cu-Au-U mineralisation, over an area centred ~15 km south-east of Arcoona Homestead, during this period comprised 3D geophysical modelling of possible source geometries for, and RC drilling (10 holes, total...
      Document
    • PDF
  • Woomera, Portulacca Ridge and Red Lake. Joint final report at licences' joint full surrender, for the period 15/2/1983 to 7/11/1986.

    The three licences now being surrendered were originally taken out by Seltrust in the mid-1970s to search for stratabound base metals and Olympic Dam type mineralisation. After Seltrust withdrew from the subsequently formed Stuart Shelf joint venture...
      Document
    • PDF
  • RB 93/00004 Tarcoola - Tallaringa bedrock drilling 1991. Summary.

    Archaean and Early and Middle Proterozoic rocks of the north-western Gawler Craton have features which suggest good prospectivity for base metals, precious metals and other commodities. However, outcrop is poor and there has been relatively little...
      Document Published: 01 Feb 1993
    • PDF
  • PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 3 partnership DPY3-04, Churchill Dam area iron oxide - associated copper-gold and uranium mineral prospect. Project interim and final reports.

    EL 3511 licensee Debnal and its joint venture partner Venture Minerals are exploring an area of the eastern Gawler Craton having a predicted high potential for the discovery of Olympic Dam type iron oxide - associated copper-gold-uranium (IOCG-U)...
      Document
    • PDF
  • PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 4 partnership DPY4-56, northern Olympic Domain: Sloane Hill silver and IOCG mineral prospect. Project final report.

    A PACE Initiative Year 4 subsidised drilling project carried out on Mount Eba Station, in an area located approximately 30 km south of the Prominent Hill mine, initially targeted a wide above background silver geochemical anomaly returned by sampling...
      Document Published: 18 Dec 1907
    • PDF
  • Unlocking South Australia's Mineral and Energy Potential - A Plan for Accelerating Exploration. Theme 2 (drilling partnerships with PIRSA and industry) : Year 4 partnership no. DPY4-65, Chianti mineral prospect. Project completion dataset.

    The subject set of reports describes the results of PACE Initiative Year 4 partly-subsidised drilling work conducted in the vicinity of the Chianti prospect, which lies approx. 20 km north of the old Mount Gunson mining camp. The aim of this work,...
      Document
    • PDF
  • Data release [made at SA Director of Mines' discretion] : Yeltacowie (part of the Mount Gunson Project). Annual reports for the period 30/7/2003 to 6/10/2009.

    The subject EL 3112 ground represents the continuation of tenure by Gunson Resources, over the same area, from its former EL 2516 Yeltacowie (for which see the relevant licence reports previously released in Envs 9530 and 9715). This replacement...
      Document
    • PDF
  • Tarcoola - Tallaringa Bedrock Drilling Project.

    Archaean, Early and Middle Proterozoic rocks of the north-western Gawler Craton have features which suggest good prospectivity for base metals, precious metals and other commodities. However, outcrop is poor and there has been relatively little...
      Document
  • Data release [made at SA Director of Mines' discretion] : Acropolis South and North Roxby. Joint annual reports for the period 26/4/2003 to 3/5/2009.

    Exploration for possible economic deposits of buried, Mesoproterozoic basement-hosted IOCG-U style mineralisation is being conducted over two separate multiple-block licence areas in the Olympic Dam district, EL 2931 (Acropolis South) and EL 2932...
      Document
    • PDF
  • Data release [made at SA Director of Mines' discretion] : Mount Gunson (part of the Mount Gunson Project). Annual reports for the period 15/7/1994 to 17/10/2008 [ Index Part 3 of 4 ].

    During the eighth year of tenure, work done on EL 2639 included: - the conduct of infill ground gravity and CSAMT surveys; - geophysical modelling and interpretation of the new survey data; - geological interpretation and refinement of drilling...
      Document
  • Data release - as updated [made at SA Director of Mines' discretion] : Yeltacowie (part of the Mount Gunson Project). Annual reports for the period 7/10/2009 to 6/10/2013.

    New work undertaken on EL 4187 during the 2009-2010 licence year has included: • Ongoing documentation and interpretation of MGD 55 & 56 • Drilling of MGD57 to 1243 m at Emmie Bluff prospect • Down hole EM and IP logging of MGD57 •...
      Document
    • PDF
  • Port Augusta. Progress reports and annual reports plus final report to licence full surrender, for the period 18/3/1982 to 29/10/1986.

    The principal target of ongoing exploration in the southern Lake Torrens region was a possible buried, large, high-grade base and precious metal deposit lying within the pre- Pandurra Formation basement. After completing the drilling of DDH YAD1 at...
      Document
    • PDF
  • Stuart Shelf Project. EL 1338 first [and Project second overall] partial surrender report, for the period 2/5/1975 to 16/6/1991.

    TARGET: Possible buried base and precious metal deposits associated with aeromagnetic anomalies, and also with either coincident or unrelated gravity anomalies, lying within a relinquished sector of the large contiguous multi-licence area that Western...
      Document
    • PDF
  • Data release - as updated [made at SA Director of Mines' discretion] : Eucolo Creek (also called the Churchill Dam Project). Annual reports for the period 31/1/2006 to 14/11/2018.

    EL 3511 Eucolo Creek, of 528 square km, is situated near the eastern margin of the Gawler Craton within the Olympic Dam Domain, approximately 90 km south-west of the Olympic Dam IOCG-U deposit (3.98 billion tonnes at 1.1% Cu, 0.4 kg/t U3O8 and 0.5 g/t...
      Document Published: 01 Dec 1918
    • PDF
  • Intercept Hill. Annual reports to licence expiry/full surrender, for the period 8/5/2003 to 14/7/2013. [Index Part 2 of 2].

    In March 2010, once the terms of the joint venture agreement had been finalised, Argo passed its complete data sets to Xstrata, who immediately commenced a re-logging of Argo's drill cores besides conducting comprehensive unconstrained 3-D modelling...
      Document Published: 15 Nov 1913
    • PDF
  • Port Pirie. Progress reports to licence expiry/renewal, for the period 20/4/1977 to 19/4/1979.

    Concerted exploration for possible stratiform Mount Gunson type or epithermal Olympic Dam type base metal deposits, on the south-eastern edge of the Stuart Shelf near Port Pirie, was begun by North Broken Hill Ltd in response to the public release by...
      Document
    • PDF
  • RB 2013/00014 IOCG-style mineralisation in the central eastern Gawler Craton, SA; characterisation of alteration, geochemical associations and exploration vectors.

    While South Australia is well known as having within its borders major iron oxide - associated copper-gold (IOCG) deposits such as Olympic Dam, Prominent Hill, Carrapateena and Hillside, there has until now been a lack of publically accessible...
      Document Published: 01 Oct 2013
    • PDF
  • Bulgunnia. Annual reports and final report to licence expiry/full surrender, for the period 10/12/1996 to 9/12/2000.

    A significant combined thickness of Late Proterozoic Pandurra Formation, Jurassic Algebuckina Sandstone and Cainozoic sediments overlies prospective Middle Proterozoic basement 70 km north of Tarcoola. Several gold anomalies were returned from...
      Document
    • PDF
  • 1
  • 2
  • Next
Download in queue. Do not close this page.

Downloads on our site are currently at full capacity. You are number 0 in the queue. Do not close this page, or you’ll lose your place in the queue. Your download will start automatically as soon as you reach the front of the queue.

Don’t want to wait? Request for a download link to be sent to you

Download started...

Your download will start automatically in a few seconds.

Request delivery

It usually takes us a few business days to deliver your selected downloads to you via an S3 bucket. Please leave your email address and we’ll be in touch when it’s ready.

Request submitted.

We’ll be in touch in the next few business days. Sometimes we can get a large number of requests, but we strive to get back to you quickly. If, after a few days you haven’t received an email, please email us on mesacOpenData@dnrme.qld.gov.au

Made with CKAN 2.9.7(1.79)
Acknowledgement
Copyright
Disclaimer
Privacy
Contact Us
South Australia Government