-
Mulga Well Outstation. First partial surrender report at licence expiry/renewal, for the period 22/6/2004 to 21/6/2009.
Soil and calcrete geochemical data is presented for the now relinquished portions of EL 3211.-
Document
Published: 09 Sep 1909
-
Coondambo. Second partial surrender report, for the period 7/6/2001 to 6/6/2009.
As part of a search for possible buried economic Olympic Dam type IOCG-U deposits in volcanic basement, or for stratiform Athabasca Basin type uranium occurrences in the overlying cover, farminee Marathon Resources carried out detailed calcrete...-
Document
-
Partridge Range (part of the Gibraltar Joint Venture Project). Annual reports and final report to licence full surrender, for the period 4/3/1997 to 3/12/2008.
Exploration of an area with poor basement outcrop, located approximately 45 km north-east of Tarcoola, primarily sought possible fault or breccia-hosted mesothermal gold +/- base metal mineralisation in likely multiphase Mesoproterozoic felsic...-
Document
Published: 12 Aug 1908
-
Mount Eba. Annual reports and final report to licence expiry/full surrender, for the period 20/10/2005 to 19/10/2008.
An area within the northern Stuart Shelf which extends from 15 to 65 km south of the Prominent Hill mine site has been explored for possible similar IOCG-U type economic mineral deposits by a new industry entrant uranium explorer, Uranium Exploration...-
Document
Published: 16 Jan 1909
-
Gosse and Kingoonya (part of the Mentor Project, and later the Kingoonya Project). Data release made at joint partial relinquishment upon licences' expiry/renewal: annual reports for the period 3/12/1997 to 28/9/2008. [Index Part 2 of 2].
In continuing exploration carried out by Mount Isa Mines Exploration (MIM) during 1998 on EL 1792 / 2467 Gosse and EL 1798 / 2466 Kingoonya, additional calcrete sampling and RC drilling (25 holes for 1590 m total penetration) took place at four...-
Document
-
Bulgunnia, Gosse and Kingoonya (the Mentor Project). Data release made at the surrender of subsequent licences : annual reports for the period 27/10/1992 to 15/11/1997. [Index entry Part 1 of 2 - a very long abstract is split between these two parts].
The Gawler Joint Venture partners (Dominion Mining and Resolute Resources) have been exploring three near-contiguous areas located in the north of the Tarcoola - Kingoonya district, seeking possible economic concealed epithermal/mesothermal...-
Document
-
Data release - as updated : McDouall Peak. Annual reports and final report to licence expiry/full surrender, for the period 8/10/2007 to 7/10/2022.
Quasar Resources has been exploring a large licence area centred approximately 40 km south-west of the Prominent Hill mine for possible economic buried iron-oxide-copper-gold (IOCG) style mineralisation, epithermal base metal mineralisation of the...-
Document
Published: 27 Oct 1922
-
The Lake Torrens Project; plus the Olympic Domain Project. Joint annual reports for the period 1/1/2006 to 31/12/2010.
Licensee Copper Range originally took up a group of three tenements located in central South Australia covering areas within and west of Lake Torrens, with the intent, much reinforced following the Carrapateena deposit discovery made in 2005, of...-
Document
Published: 04 Mar 1911
-
Oak Dam North-east, Lake Torrens, Glenside, Winjabbie and Trimmer Inlet; plus Shore Hill and Red Swamp (initially the UXA Stuart Shelf South JV Project; then OZ Minerals' Stuart Shelf Project). Joint annual reports for the period 1/11/2010 to 6/1/2017.
In continued exploration for possible economic buried Olympic Dam or Prominent Hill type IOCG style mineralisation that may exist within Proterozoic bedrock, joint venture operator Straits Resources undertook the following work on the project...-
Document
Published: 06 Mar 1918
-
Data release - as updated [made at SA Director of Mines’ discretion] : Oak Dam North-east. Annual reports for the period 18/1/2006 to 17/1/2011.
A relatively large but little-explored area of the central-eastern Stuart Shelf, which is almost wholly covered by scrubby sand dunes and swampy salt lakes, thereby making surface access very difficult despite it being located only ~30 km to 50 km km...-
Document
Published: 16 Mar 1911
-
Data release - as updated [made at SA Director of Mines' discretion] : Wartaka, Iron Knob, Reid Lookout and Old Wartaka (the Parkinson Dam Project). Annual reports and joint annual reports for the period 17/2/2005 to 26/4/2019.
Four small, adjacent licences located on the south-eastern, shallow subcrop margin of the Gawler Ranges, which together make up an area centred about 25 km north-east of Lake Gilles and 60 km west of Port Augusta, are being explored for possible...-
Document
Published: 30 Apr 1918
-
Data release [made at SA Director of Mines' discretion] : Mount Gunson (part of the Mount Gunson Project). Annual reports for the period 15/7/1994 to 17/10/2008 [ Index Part 3 of 4 ].
During the eighth year of tenure, work done on EL 2639 included: - the conduct of infill ground gravity and CSAMT surveys; - geophysical modelling and interpretation of the new survey data; - geological interpretation and refinement of drilling...-
Document
-
Centre Hill (the Kingoonya JV Project). Annual reports to licence expiry/full surrender, for the period 7/3/2006 to 10/5/2012.
An area extending for approximately 80-115 km south-east of Tarcoola has been explored for possible economic mesothermal gold±copper mineralisation formed in Mesoproterozoic igneous basement, possible unconformity - related uranium mineralisation at...-
Document
Published: 12 Jul 1912
-
Shell Lagoon. Annual reports and final report to licence expiry/full surrender, for the period 11/1/2001 to 7/5/2010.
Exploration for possible diamondiferous kimberlites in an area located immediately north-west and west of Woomera was undertaken to follow up promising reports of numerous kimberlitic indicator minerals detected by CRA Exploration in previous work...-
Document
Published: 08 Jun 1912
-
Lincoln Gap (part of the Eastern Eyre Peninsula Project). First annual report and final report to licence expiry/full surrender, for the period 30/9/2009 to 29/9/2011.
An area located approximately 20 km south-west of Port Augusta has been explored for possible economic unconformity-hosted uranium at the base of the Pandurra Formation, for copper sulphides near the Beda Volcanics - Pandurra Formation contact, and...-
Document
-
Coondambo. Annual reports and final report to licence expiry/full surrender, for the period 7/6/2001 to 4/7/2011.
An area located close to the western margin of the Stuart Shelf, and approximately 120 km south-west of the Olympic Dam deposit, was taken up to explore for possible economic IOCG mineralisation hosted by Gawler Range Volcanics (GRV) and Hiltaba Suite...-
Document
Published: 13 Apr 1911
-
Data release - as updated [made at SA Director of Mines' discretion] : Eucolo Creek (also called the Churchill Dam Project). Annual reports for the period 31/1/2006 to 14/11/2018.
EL 3511 Eucolo Creek, of 528 square km, is situated near the eastern margin of the Gawler Craton within the Olympic Dam Domain, approximately 90 km south-west of the Olympic Dam IOCG-U deposit (3.98 billion tonnes at 1.1% Cu, 0.4 kg/t U3O8 and 0.5 g/t...-
Document
Published: 01 Dec 1918
-
Lake Gairdner North (part of the West Roxby Project). Data release: annual reports for the period 23/7/2007 to 22/7/2012.
An area centred approximately 55 km west-southwest of Woomera was taken up to explore its IOCG mineralisation potential. Early field work consisted of the acquisition of infill gravity coverage over an irregular outline regional gravity low anomaly...-
Document
-
Pandurra. Combined first annual/final report to licence full surrender, for the period 26/6/2013 to 23/10/2014.
A small area centred ~50 km west of Port Augusta was taken up to explore for possible buried epigenetic and structurally controlled gold mineralisation in Archaean and Proterozoic basement rocks. The target was related to a 3.5 km long, >3 ppb Au...-
Document
-
Coondambo. First partial surrender report, for the period 10/1/1997 to 9/7/1998.
Reconnaisance calcrete and rock chip geochemical sampling plus RAB/aircore drilling (8 vertical holes, total 432 m) were carried out during gold exploration conducted north-east and south-west of Glendambo. Crystalline basement was not reached in the...-
Document