-
Gravity and magnetic analysis Lagoon Hill area, South Australia. Appendix 1 in progress report for the period ended 3/11/1973.
There is no abstract created for this record-
Document
Published: 01 Jan 1973
-
Mount Carulina and Trapeze Hill (the Oodnadatta Project). Joint annual reports plus succeeding single licence annual reports to licence expiry/full surrender, for the period 6/3/1995 to 12/10/2009. [ Index Part 2 of 2 ].
[ Note - here is Part 2 of the abstract relating to 2 separately indexed parts ]. A new joint venture with Barrick Gold, pertaining to the renewed (as EL 3424) tenement, was signed on 8/2/2007, after which that company as operator undertook a 749...-
Document
Published: 09 Feb 1910
-
Mount Edarteenya (part of the Woodmurra Project). First annual report to licence expiry/full surrender, for the period 13/8/2007 to 12/8/2009.
Exploration of an area located approximately 70 km east of Oodnadatta for possible economic, buried Broken Hill or Cannington type Pb-Zn-Ag mineralisation hosted by inferred prospective basement metasedimentary and metavolcanic rocks, has consisted of...-
Document
-
Mount Perrypollkot (part of the Woodmurra Project). First annual report to licence expiry/full surrender, for the period 13/8/2007 to 12/8/2009.
Exploration of an area located approximately 80 km east-southeast of Oodnadatta for possible economic, buried Broken Hill or Cannington type Pb-Zn-Ag mineralisation hosted by inferred prospective basement metasedimentary and metavolcanic rocks, has...-
Document
-
The Peake and Denison Project. Project joint annual reports and respective final reports at licences' expiry/full surrender, for the period 1/1/2000 to 20/9/2009. [Index Part 1 of 2].
[ Note - here is only Part 1 of an abstract relating to 2 separately indexed parts ]. Exploration carried out over the Peake and Denison Inliers by the joint venturers since mid-2000 has targeted possible large-scale Proterozoic ironstone-hosted...-
Document
Published: 15 Oct 1909
-
Mount Denison and Mount Charles (the Peake and Denison Project). Data release upon the expiry/full surrender of subsequent licences : respective annual and combined annual reports for the period 1/6/1994 to 31/5/1999. [ Index Part 2 of 2 ].
[ Note - here is only Part 2 of an abstract relating to 2 separately indexed parts ]. During the latter half of 1997, just before it transferred project management to BHP Minerals, Renison Gold Corp. carried out reconnaissance bedrock geochemical...-
Document
-
The Peake and Denison Project. Project joint annual reports and respective final reports at licences' expiry/full surrender, for the period 1/1/2000 to 20/9/2009. [Index Part 2 of 2].
[ Note - here is Part 2 of the abstract relating to 2 separately indexed parts ]. In the latter half of 2003, new project partner Phelps Dodge reprocessed aeromagnetic and gravity data and produced a magnetic/structural interpretation, from which...-
Document
Published: 15 Oct 1909
-
Data release - as updated : Edward Creek (part of the Edward Creek Joint Venture Project). Annual reports and final report to licence expiry/full surrender, for the period 23/9/2008 to 11/11/2018.
Reedy Lagoon Corp. (RLC) has continued to look for minerals other than diamond, operating as the manager of exploration work for base metals (mainly copper) and uranium that was undertaken by the Edward Creek Base Metal Joint Venture (“ECBMJV”) during...-
Document
-
Data release - as updated : Mount Toodla. Annual reports to licence expiry/full surrender, for the period 23/8/2005 to 18/11/2015.
Within a licence area centred ~65 km east of Oodnadatta and located about 320 km NNW of Olympic Dam, a major, high amplitude (10 mGal) regional gravity anomaly associated with magnetic anomalies and lying within the G2 transcontinental lineament...-
Document
-
ELs 4678 - 4689 (the Oodnadatta Project). Joint annual reports, plus final reports at licences' individual or joint full surrenders, for the period 22/2/2011 to 9/9/2014.
The Oodnadatta Project consisted originally of twelve exploration licenses covering 7125 square km in far northern South Australia, this mainly being ground situated to the south and south-east of Oodnadatta. Uranium Equities Limited (UEQ) believed...-
Document
Published: 28 Oct 1914
-
Davenport. Annual reports and final report to licence expiry/full surrender, for the period 1/5/2014 to 30/4/2018.
An area located on and adjacent to the north-eastern side of the Margaret Inlier of the Proterozoic Peake and Denison Ranges, which is centred approximately 120 km south-east of Oodnadatta, has been explored for possible buried economic IOCG...-
Document
Published: 21 May 1918
-
Mount Arthur (part of the Woodmurra Project). Annual report and final report to licence full surrender, for the period 28/11/2014 to 9/3/2017.
An area centred ~70 km east of Oodnadatta has been explored for possible buried economic giant Broken Hill type (BHT) stratiform Pb-Zn-Ag deposits which might be contained within strongly deformed and metamorphosed Palaeo- to Mesoproterozoic...-
Document
Published: 23 Dec 1916
-
Unlocking South Australia's Mineral and Energy Potential - A Plan for Accelerating Exploration. PACE Copper Discovery Drilling (drilling partnerships with DSD and industry) : Year 9 partnership no. DPY9-16 - Mount Denison. Drilling project final report.
A limited exploratory drill programme to test a deep target, that was partly subsidised by the SA Government under approved PACE Initiative Year 9 collaborative drilling project DPY9-16, was undertaken to investigate the potential for IOCG...-
Document
-
Peake Hill. Annual reports to licence expiry/full surrender, for the period 9/7/2013 to 8/7/2017.
A small area located on and adjacent to the eastern margin of the Denison Range, ~ 60 km south-east of Oodnadatta, has been explored for possible buried economic sediment-hosted uranium mineralisation. During licence Year 1 the licensee reviewed all...-
Document
-
Cootanoorina Hill. Data release made in lieu of submitting a partial surrender report at licence expiry/renewal : annual reports for the period 6/4/2010 to 5/4/2015.
No work took place on the subject licence area, located ~ 60 km south of Oodnadatta on the western side of the Peake and Denison Ranges, during its first four years of tenure. It had been taken up originally to explore for possible undercover roll...-
Document
-
Edward Creek, Peake Rise and Cootanoorina Hill (the Cootanoorina IOCG Project). Annual and joint annual reports, plus final report to project licences' respective expiry/full surrender, for the period 6/4/2015 to 5/5/2017.
During all of 2015, Cootanoorina Project operator Kingston Resources continued to perform geophysical data processing and modelling, in part using all of the new detailed gravity data that it had acquired in 2014 (548 stations on EL 5487, 102 stations...-
Document
Published: 23 May 1917
-
Data release - as updated [made at SA Director of Mines' discretion] : Mount Denison. Second annual report for the period 13/3/2016 to 12/3/2017.
During licence Year 2, work comprised: • providing ongoing land access notifications to relevant landholders and the Native Titleholders; • acquisition over the entire tenement in April 2016 of the second phase of a ground gravity survey, consisting...-
Document
Published: 12 Mar 1917
-
Mount Carulina and Trapeze Hill (the Oodnadatta Project). Joint annual reports plus succeeding single licence annual reports to licence expiry/full surrender, for the period 6/3/1995 to 12/10/2009. [ Index Part 1 of 2 ].
[ Note - here is Part 1 of the abstract relating to 2 separately indexed parts ]. As an adjunct to its widespread search for possible diamondiferous kimberlite diatremes on its Abminga Project acreage situated nearby to the north-west, Caldera...-
Document
Published: 09 Feb 1910
-
Data release [made at SA Director of Mines' discretion] : Mount Denison. Annual report for the period 13/3/2015 to 12/3/2019.
A small area centred ~80 km south-east of Oodnadatta is being explored for possible buried economic iron-oxide associated copper-gold-uranium (IOCGU) style mineralisation, as typified by the Olympic Dam and Prominent Hill deposits. The tenement was...-
Document
Published: 12 Mar 1916
-
North-eastern Peake and Denison Inliers. Final report for approved geophysical work programme, Project ADI RD01-094 [part of Accelerated Discovery Initiative Round 1, 2021].
Licenceholder Minotaur Exploration has received a grant of ADI Round 1 subsidy funds from DEM to assist it in understanding the Proterozoic basement geology of the Peake and Denison Inliers, with the aim of making a step-change in the modelling of...-
Document