Jenner Hill, Pearson Hill and Sandy Point (the Stuart Shelf JV Project). Joint progress reports, plus later annual reports and final report to full surrender of remnant licence EL 1808, for the overall period 4/10/1989 to 24/10/1996.
Exploration for Olympic Dam-style mineralisation, undertaken over an area centred ~15 km south-east of Arcoona Homestead on the Stuart Shelf, which includes WMC's formerly partly tested Emmie Bluff prospect, has comprised the acquisition of ground...-
Document
-
Unlocking South Australia's Mineral and Energy Potential - A Plan for Accelerating Exploration. Theme 2 (drilling partnerships with PIRSA and industry) : Year 1 partnership no. DPY1-03, Marathon South mineral prospect. Project interim and final reports.
During exploration of Exploration Licence 3209 situated on the northern Stuart Shelf, gravity and magnetic modelling performed in early 2004 highlighted several anomaly source bodies, which immediately became of much interest as potential iron-oxide...-
Document
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 2 partnership DPY2-13, evaluation of the Marathon South mineral occurrence. Project interim and final reports.
Following further detailed ground gravity surveying and data processing carried out to better understand the gravity response of relatively dense and weakly magnetic basement rocks at the Marathon South prospect, located within EL 3209 and lying...-
Document
Published: 10 May 1906
-
Port Augusta - Lake Torrens area. Progress reports and final report to licence full surrender, for the period 28/11/1979 to 29/10/1986.
There is no abstract created for this record-
Document
-
Data release - as updated [made at SA Director of Mines’ discretion] : Glenside. Annual reports to licence expiry/renewal, for the period 5/12/2005 to 4/12/2010.
An area centred approximately 40 km south of the Andamooka Opal Field and 50 km south-east of the Olympic Dam mine is being explored for possible buried economic Olympic Dam or Prominent Hill type IOCG-U mineralisation as well as for possible...-
Document
Published: 28 Jan 1911
-
Data release - as updated [made at SA Director of Mines' discretion] : Carrapateena Arm, Hatch Hill, Beda Arm and Lake Torrens South (the OZ Minerals Carrapateena Project). Annual reports (separate and joint) for the period 8/1/2008 to 6/1/2016.
Exploration of the Lake Torrens JV Project area during 2008, managed by Teck Cominco Australia (Teck), consisted of diamond drilling some wedge holes off a parent to determine the lateral and vertical dimensions of bornite and chalcopyrite - dominated...-
Document
-
Woomera and Wirrappa. Annual reports and first joint annual report, plus final report to licences' joint full surrender, for the period 14/1/2013 to 13/11/2018.
Two adjacent areas located immediately south and east of Woomera township were taken up to search for possible buried economic stratabound deposits of copper or other metals that may have formed in the Neoproterozoic and Mesoproterozoic cover sequence...-
Document
Published: 07 Jan 1919
-
Andamooka Ranges, Island Dam and Stuart Shelf (part of the Stuart Shelf Project). Joint third partial surrender report, for the period 16/1/1981 to 25/9/2018.
There is a long history of exploration on the subject three Stuart Shelf tenements, with first tenure originally taken up in 1981. A summary of significant exploration activities conducted on the three now relinquished ground portions is believed by...-
Document
Published: 22 Nov 1918
-
West Lake Torrens (part of the Murdie Project). Final report for geophysical, drilling and logistics program, Project ADI RD01-120 [part of Accelerated Discovery Initiative Round 1, 2021].
ADI funding was granted by DEM to Kelaray to conduct approved geophysical surveys and exploratory drilling and apply logistical support within its Murdie Project, for a combined expenditure of up to A$320,000. At the outset of the project, Kelaray...-
Document
-
Mount Gunson district. Geological mapping data, 1971-1972.
A mapping programme was undertaken by the licensees to test the possibility of the near-mine area to Mount Gunson being a suitable host environment for stratiform copper mineralisation. The exploration hypothesis used was that such mineralisation...-
Document
Published: 21 Apr 1972
-
Olympic Dam operations. Environmental management programme annual report. 01/03/90 - 28/02/91.
Reports on monitoring of: - air and solid waste pollution; - drill pad rehabilitation; - meteorology, vegetation, flora, fauna and soil salinity; - mine ground water drainage; - artesian water drawdown at Wellfield A in the Great Artesian Basin;...-
Document
-
Pernatty Lagoon. Progress reports and final report to licence expiry/renewal, for the period 20/7/1973 to 19/7/1975.
Ongoing appraisal work conducted by CSR at the company's newly discovered Cattlegrid copper deposit that lies at the top of the Pandurra Formation has included infill rotary percussion and diamond drilling (13 holes for 554 m, including 166 m cored),...-
Document
-
Billa Kalina Homestead. Progress reports and final report to licence full surrender, for the period 30/6/1977 to 14/2/1979.
Airborne and ground geophysical surveys were undertaken in the Billa Kalina area, prior to commencing to drill in a search for Olympic Dam type Cu-U-Au mineralised haematitic breccias, in order to delineate and detail several broad magnetic anomalies...-
Document
-
Unlocking South Australia's Mineral and Energy Potential - A Plan for Accelerating Exploration. Theme 2 (drilling partnerships with PIRSA and industry) : Year 1 partnership no. DPY1-02, Titan mineral prospect. Project interim and final reports.
Titan prospect is located within Exploration Licence 3209, and lies 30 km north of the Olympic Dam mine. The prospect was first drilled by Western Mining Corp. in 1976 with diamond drillhole BD 1, and in 1981 with a second hole, BD 2. Both holes hit...-
Document
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 6 partnership DPY6-07 - Intercept Hill JV Project, central Stuart Shelf area - Oak Dam South Proterozoic basement IOCG mineral prospects. Drilling project final report.
The Intercept Hill Project area is located in the central part of the Stuart Shelf. Gawler Craton basement rocks in the project area comprise leucocratic granite of the Hiltaba Suite, volcanic rocks of the Gawler Range Volcanics and metasediments of...-
Document
-
RB 2007/00006 The geology and mineral potential of the PORT AUGUSTA [mapsheet] area, eastern Gawler Craton.
The PORT AUGUSTA 1:250,000 mapsheet area covers the north-eastern part of the Eyre Peninsula, the northern Spencer Gulf and the south-western Flinders Ranges, and extends from latitude 32°00'S to 33°00'S and longitude 136°30'S to 138°00'S. The main...-
Document
Published: 01 Apr 2007
-
RB 2009/00022 Stuart Shelf geochemical project.
The Carrapateena mineral discovery was the outcome of a PACE Initiative drilling project co-funded by RMG Services Pty Ltd and the Government of South Australia. Two holes were drilled, the second of which (CAR002) encountered a major body of...-
Document
Published: 01 Dec 2009
-
Pandurra. First partial surrender report, for the period 23/3/1973 to 6/4/1976.
Surface geological mapping and open hole rotary drilling of 21 stratigraphic holes totalling 8717 m were carried out within the relinquished ground portion, which from reviewing the results is regarded as having low potential for copper and other base...-
Document
-
Emmie Bluff. Progress reports and annual reports to licence expiry/full surrender, for the period 21/6/1976 to 20/6/1978.
Ongoing exploration for possible buried Olympic Dam-style Cu-Au-U mineralisation, conducted over an area of the Stuart Shelf located 15 km south-east of Arcoona Homestead, has comprised RC drilling (20 holes, aggregate penetration 1768 m) and diamond...-
Document
-
Red Lake. Progress reports to licence expiry/renewal, for the period 12/1/1976 to 11/1/1978.
The exploration target for stratabound base metals in the Red Lake area, which lies just to the east of Pernatty Lagoon and abuts the Arcoona Plateau, was the top of Pandurra Formation erosional surface. Percussion (17 holes totalling 2619 m) and...-
Document