-
Macclesfield (part of the Mount Barker Project). Annual reports and final report to licence expiry/full surrender, for the period 6/4/2016 to 5/6/2019.
An area surrounding the township of Macclesfield, and lying a short distance south-east of Terramin Limited's Bird-in-Hand historic gold mine redevelopment project, has been explored for inferred sediment-hosted primary gold mineralisation that may...-
Document
Published: 13 Jun 1919
-
Echunga (part of the Mount Barker Project). Annual reports, first partial surrender report and final report to licence full surrender, for the period 7/7/2016 to 5/6/2019.
An area surrounding the historic Echunga goldfield locality, and lying a short distance south-east of Terramin Limited's Bird-in-Hand historic gold mine redevelopment project, has been explored for inferred sediment-hosted primary gold mineralisation...-
Document
Published: 13 Jun 1919
-
Meadows (part of the Mount Barker Project). First annual report plus final report to licence expiry/full surrender, for the period 20/4/2017 to 19/4/2019.
A small area covering part of the Meadows Fault scarp and part of the adjoining Tertiary-Recent Meadows Basin has been explored for inferred sediment-hosted primary gold mineralisation that may have formed in favourable Neoproterozoic bedrock...-
Document
Published: 13 Jun 1919
-
Bangor. Combined first annual/final report at licence full surrender, for the period 23/8/2018 to 22/11/2019.
A large area centred ~20 km east-northeast of Port Germein, covering ground at the southern end of the Flinders Ranges, has been explored for possible altered sediment - hosted gold deposits of disseminated, Carlin style which are genetically...-
Document
Published: 14 Oct 1919
-
Whyte-Yarcowie. Annual reports plus final report to licence expiry/full surrender, for the period 23/3/2017 to 22/3/2022.
An area of the Adelaide Fold Belt centred on the township of Whyte Yarcowie has been explored for possible buried economic hydrothermally emplaced cobalt mineralisation that might be associated with manganese oxides hosted by altered dolomitic...-
Document
Published: 31 Mar 1922
-
Pernatty Lagoon. Final report, Project ADI RD02-295 [Accelerated Discovery Initiative Round 2, 2022].
This report pertains to the Pernatty C Zambian Copperbelt (ZCB) Project which was partially funded by a $298,500 grant through the State Government’s Accelerated Discovery Initiative (ADI) which aims to make a major contribution to achieving the South...-
Document
Published: 02 Aug 1922
-
Data release - as updated [made at SA Director of Mines' discretion] : Mount Gunson (part of the Mount Gunson Project). Annual reports for the period 18/10/2008 to 24/3/2018.
During licence Year 15 (2008-2009), activities at Mount Gunson comprised: - pegging of three Mineral Claims at the MG 14 deposit in December 2008; - acquiring part of a larger project-wide ground gravity survey during April-May 2009 (510 stations...-
Document
Published: 22 Aug 1918
-
Cattlegrid mine and surrounding lease areas. Mine planning calculations of deposit reserves, including those of orebody extensions, plus a report on a review of copper resources, for the period 1983-1984.
There is no abstract created for this record-
Document
-
Report on geological investigations in the Mundallio North Anomalous area SML 346.
There is no abstract created for this record-
Document
Published: 01 Jan 1971
-
RB 65/00035 Clare Regional Geochemical Project.
This investigation was a feasibility study, therefore environmental factors are dealt with in much more detail than would be necessary in a routine geochemical report. Apparently these factors has little significant effect on the results. Spot...-
Document
Published: 01 Jan 1967
-
RB 76/00100 Geochemical survey of the Truro 1:63 360 sheet.
There is no abstract created for this record-
Document
Published: 01 Jan 1976
-
Wyacca (part of the Hawker Project). Annual reports plus final report to licence expiry/full surrender, for the period 18/1/2006 to 17/1/2011.
EL 3492 was originally taken out to cover the historic copper workings at Wyacca, located 40 km east of Hawker, as part of an exploration project addressing possible economic shallow oxide copper mineralisation associated with old mines and workings...-
Document
Published: 06 Apr 1911
-
Leigh Creek. Progress and annual reports to licence expiry/renewal for the period 4/3/1974 to 3/3/1976.
Ongoing exploration of abandoned historic mine workings and the surrounding area at the Mountain of Light prospect, located approximately 2 miles east of Copley, was aimed at delineating an economic copper oxide/carbonate - mineralised orebody and any...-
Document
-
Laura. Summary and annual reports to licence expiry/full surrender, for the period 9/8/1993 to 23/1/1996.
A manganese-rich Adelaidean stratigraphic unit outcropping along the western flank of the Mount Remarkable Range, which returned 1.8% Co, 1.5% Cu and 1.0% Zn in a grab sample from the Willowie Cobalt prospect, warrants further work because it is...-
Document
-
Eurelia. Progress and annual reports to licence expiry/renewal for the period 30/10/1969 to 29/7/1971.
An exploration licence area covering 120 square miles in the vicinity of the Eurelia Anticline was taken up by Utah Development to search for possible economic Zambian Copperbelt-style stratiform copper deposits within upper Adelaidean metasedimentary...-
Document
-
Mount Davidson. Progress, annual and final reports to licence expiry for the period 15/1/1970 to 14/1/1972.
Exploration for possible hydrothermal/stratabound replacement-type base metal deposits in an area located 28 miles north-east of Hawker, adjacent to the northern margin of the Worumba Diapir, has consisted of photogeological mapping of structures...-
Document
Published: 17 Jan 1972
-
Report on geological mapping of the Mount McTaggart copper prospect [in] SML 575.
Detailed 1:1200 scale geological mapping on the existing prospect grid, plus geochemical and petrological studies of mineralised and host rock samples, suggest that the mineralisation at Mount McTaggart may be related to pneumatolytic metasomatism....-
Document
-
Bute. Data release at the full surrender of a subsequent licence : Progress reports to licence expiry/renewal, for the period 10/6/1978 to 28/9/1979.
As part of ongoing base metal exploration of the area surrounding Bute, initial work done after the expiry of EL 248 comprised the completion of one diamond drillhole to TD 411.2 m within Carpentarian basement, targeting a magnetic anomaly thought to...-
Document
Published: 20 Nov 1979
-
Bute. Data release at the full surrender of a subsequent licence : Progress reports to licence expiry/renewal, for the period 10/6/1976 to 9/6/1978.
There is no abstract created for this record-
Document