-
Red Lake. Progress reports to licence expiry/renewal, for the period 23/2/1978 to 2/1/1983.
Exploration undertaken on ground situated east of Pernatty Lagoon has included the acquisition of extensive ground magnetic and gravity surveys plus a small aerial magnetic and radiometric survey, and performing many specific gravity and magnetic...-
Document
-
Mount Gunson - Pernatty. Quarterly reports and annual reports to licence expiry/full surrender, for the period 14/2/1987 to 15/4/1994.
Ongoing copper exploration in the Mount Gunson area was directed primarily at locating economic stratiform mineralisation in the Tapley Hill Formation, which overlies Pandurra Formation and the associated Cattlegrid orebody. New work comprised...-
Document
-
Emmie Bluff. Progress reports to licence expiry/full surrender, for the period 28/10/1978 to 11/2/1983.
Ongoing exploration for Olympic Dam-style Cu-Au-U mineralisation, over an area centred ~15 km south-east of Arcoona Homestead, during this period comprised 3D geophysical modelling of possible source geometries for, and RC drilling (10 holes, total...-
Document
-
Unlocking South Australia's Mineral and Energy Potential - A Plan for Accelerating Exploration. Theme 2 (drilling partnerships with PIRSA and industry) : Year 1 partnership no. DPY1-03, Marathon South mineral prospect. Project interim and final reports.
During exploration of Exploration Licence 3209 situated on the northern Stuart Shelf, gravity and magnetic modelling performed in early 2004 highlighted several anomaly source bodies, which immediately became of much interest as potential iron-oxide...-
Document
-
Unlocking South Australia's Mineral and Energy Potential - A Plan for Accelerating Exploration. Theme 2 (drilling partnerships with PIRSA and industry) : Year 1 partnership no. DPY1-12, Chianti mineral prospect. Project final report.
The subject report describes the results of drilling two fully cored rotary holes totalling 1161.10 m at the Chianti prospect, an unusually-shaped residual gravity anomaly located in Gunson Resources' EL 3264, 20 km north-east of the Mount Gunson...-
Document
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 2 partnership DPY2-13, evaluation of the Marathon South mineral occurrence. Project interim and final reports.
Following further detailed ground gravity surveying and data processing carried out to better understand the gravity response of relatively dense and weakly magnetic basement rocks at the Marathon South prospect, located within EL 3209 and lying...-
Document
Published: 10 May 1906
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 3 partnership DPY3-04, Churchill Dam area iron oxide - associated copper-gold and uranium mineral prospect. Project interim and final reports.
EL 3511 licensee Debnal and its joint venture partner Venture Minerals are exploring an area of the eastern Gawler Craton having a predicted high potential for the discovery of Olympic Dam type iron oxide - associated copper-gold-uranium (IOCG-U)...-
Document
-
Unlocking South Australia's Mineral and Energy Potential - A Plan for Accelerating Exploration. Theme 2 (drilling partnerships with PIRSA and industry) : Year 4 partnership no. DPY4-65, Chianti mineral prospect. Project completion dataset.
The subject set of reports describes the results of PACE Initiative Year 4 partly-subsidised drilling work conducted in the vicinity of the Chianti prospect, which lies approx. 20 km north of the old Mount Gunson mining camp. The aim of this work,...-
Document
-
Data release [made at SA Director of Mines’ discretion] : Woocalla (part of the Mount Gunson Project). Annual reports and final report to licence expiry/renewal over a reduced area, for the period 4/8/1995 to 3/8/2000.
Stuart Metals took up EL 2099 covering ground in the Wirrappa - Lake Blyth - Bookaloo Siding area primarily to explore it for stratiform copper mineralisation of the various styles present in the Mount Gunson area. In addition, it was thought that the...-
Document
-
Port Augusta - Lake Torrens area. Progress reports and final report to licence full surrender, for the period 28/11/1979 to 29/10/1986.
There is no abstract created for this record-
Document
-
Data release - as updated [made at SA Director of Mines’ discretion] : Oak Dam North-east. Annual reports for the period 18/1/2006 to 17/1/2011.
A relatively large but little-explored area of the central-eastern Stuart Shelf, which is almost wholly covered by scrubby sand dunes and swampy salt lakes, thereby making surface access very difficult despite it being located only ~30 km to 50 km km...-
Document
Published: 16 Mar 1911
-
Data release - as updated [made at SA Director of Mines' discretion] : Carrapateena Arm, Hatch Hill, Beda Arm and Lake Torrens South (the OZ Minerals Carrapateena Project). Annual reports (separate and joint) for the period 8/1/2008 to 6/1/2016.
Exploration of the Lake Torrens JV Project area during 2008, managed by Teck Cominco Australia (Teck), consisted of diamond drilling some wedge holes off a parent to determine the lateral and vertical dimensions of bornite and chalcopyrite - dominated...-
Document
-
Mount Gunson and Mount Moseley (part of the Mount Gunson JV Project). Partial surrender reports, for the overall tenure period 15/7/1994 to 25/5/2021.
No exploration work has been undertaken on either of the recently relinquished portions of the two subject licences. Within the JV project tenements, exploration targets being addressed are: (1) possible economic buried IOCG (iron oxide-associated...-
Document
Published: 17 Oct 1918
-
Data release [made at SA Director of Mines' discretion] : Mount Gunson (part of the Mount Gunson Project). Annual reports for the period 15/7/1994 to 17/10/2008 [ Index Part 4 of 4 ].
During licence Year 12, following encouraging results made by its continuing exploratory drilling, Gunson Resources was able to negotiate a joint venture over the Mount Gunson Project tenements with Falconbridge Limited through its subsidiary Noranda...-
Document
-
Data release [made at SA Director of Mines' discretion] : Mount Gunson (part of the Mount Gunson Project). Annual reports for the period 15/7/1994 to 17/10/2008 [ Index Part 3 of 4 ].
During the eighth year of tenure, work done on EL 2639 included: - the conduct of infill ground gravity and CSAMT surveys; - geophysical modelling and interpretation of the new survey data; - geological interpretation and refinement of drilling...-
Document
-
Lake Torrens - Port Augusta and Point Paterson areas. Progress reports to licence expiry/renewal, for the period 26/11/1977 to 30/11/1979.
SALT MINING STUDY: Field tests on the feasibility of Lake Torrens salt production to supply raw material for the planned Redcliff Petrochemical Project were continued, with project planning technical data demonstrations given to visiting officials of...-
Document
-
Data release - as updated [made at SA Director of Mines' discretion] : North Roxby and Acropolis South. Joint annual reports, plus EL 3762 fifth annual report to licence sale, for the period 4/5/2009 to 3/5/2012.
Exploration for possible economic deposits of buried, Mesoproterozoic basement-hosted IOCG-U style mineralisation is being conducted over two separate multiple-block licence areas in the Olympic Dam district, EL 3761 (North Roxby) and EL 3762...-
Document
-
Stuart Shelf Project. EL 1338 first [and Project second overall] partial surrender report, for the period 2/5/1975 to 16/6/1991.
TARGET: Possible buried base and precious metal deposits associated with aeromagnetic anomalies, and also with either coincident or unrelated gravity anomalies, lying within a relinquished sector of the large contiguous multi-licence area that Western...-
Document
-
Uro Bluff. Progress reports to licence expiry/renewal, for the period 16/4/1975 to 15/4/1977.
Stratiform copper sulphides, hosted within the basal Tapley Hill Formation, and extensions of known kimberlite bodies were targeted in this program. Reconnaissance and closer (down to 1 km x 1 km) spaced diamond and percussion drilling (28 and 83...-
Document
-
Unlocking South Australia's Mineral and Energy Potential - A Plan for Accelerating Exploration. Theme 2 (drilling partnerships with PIRSA and industry) : Year 1 partnership no. DPY1-02, Titan mineral prospect. Project interim and final reports.
Titan prospect is located within Exploration Licence 3209, and lies 30 km north of the Olympic Dam mine. The prospect was first drilled by Western Mining Corp. in 1976 with diamond drillhole BD 1, and in 1981 with a second hole, BD 2. Both holes hit...-
Document