-
Data release - as updated [made at SA Director of Mines’ discretion] : Paralana Creek (part of the Beverley Project). Annual reports for the period 29/9/2009 to 15/11/2015.
Work undertaken on EL 4378 during the 2009-2010 reporting year included the drilling of 478 vertical rotary mud holes totalling 132,960 m, and core drilling totalling 4117 m performed in 16 of these holes for stratigraphic unit / resource...-
Document
Published: 24 Dec 1915
-
Lake Frome South, Central Lake Frome and Lake Frome North areas (the Lake Frome Potash Project). Joint annual reports plus final report to licences' joint full surrender, for the period 5/1/2015 to 26/4/2018.
The entire extent of the main Lake Frome salina was taken up in early 2015 with three contiguous licences covering a total area of 2718 square km, to explore for a salt lake brine potash resource which might be economic to develop to supply the local...-
Document
Published: 30 Apr 1918
-
Lake Frome [West]. First partial surrender report, for the period 18/10/2013 to 17/10/2016.
An area on the south-western edge of the Frome Embayment, that is centred ~100 km south of the Beverley uranium mine, has been taken up to explore for possible buried palaeochannel and sandstone hosted roll front style secondary uranium mineralisation...-
Document
Published: 02 Nov 1917
-
Data release - as updated [made at SA Director of Mines' discretion] : North Mulga, Wooltana and Paralana areas (Frome Basin Project). Joint annual reports for the period 24/9/2012 to 31/12/2018.
The continuation of Heathgate's programme of exploration for economic buried Tertiary sediment-hosted uranium mineralisation within part of the north-western Frome Embayment during 2012-2013 has comprised exploratory drilling of 36 vertical rotary mud...-
Document
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 4 partnership DPY4-13, Lake Frome area Holocene and Neogene calcrete - hosted uranium mineral prospects. Project interim and final reports.
Surficial sedimentary uranium deposits are estimated to comprise about 4% of world uranium resources. Calcrete deposits form approximately 5% of Australia's total uranium reserves and resources. Exploration for calcrete - hosted uranium of Neogene age...-
Document
Published: 11 Jun 1908
-
Data release - as updated [made at SA Director of Mines’ discretion] : Lake Callabonna / Petermorra (part of the Lake Elder Project). Annual reports for the period 19/3/1998 to 30/4/2015.
Exploration Licence 2494 was granted in March 1998 to Paladin Energy Minerals NL and Brightstar Power Corporation Pty Ltd - the Paladin Brightstar Joint Venture (PBJV), with Paladin Resources NL as manager. The target commodity being explored for by...-
Document
Published: 20 May 1915
-
RB 2009/00001 Explanatory Notes for [the] CALLABONNA 1:250 000 Geological Map, sheet SH 54-6.
The CALLABONNA map area includes the southern end of the Strzelecki Desert and the north- eastern Flinders Ranges, between latitudes 29° to 30° S and longitudes 139° 30' to 141° E. Cameron Corner adjoins New South Wales and Queensland in the...-
Document
Published: 01 Oct 2009
-
Curnamona (part of the Siccus JV Project). Annual reports and final report to licence surrender, for the period 4/8/1997 to 7/11/2001.
Sedimentary uranium orebodies within Tertiary palaeochannels were the target of exploration in the area of the Siccus River, south of Lake Frome. Extensive research into available open file past exploration data allowed the identification of both...-
Document
-
North Mulga. First partial relinquishment report for the period 25/8/2003 to 24/8/2004.
Drilling of fourteen exploration holes has been completed to date within the subject licence area, in a search for economic roll-front uranium occurrences within Tertiary sediments. Based on the current available data, the eastern portion of the...-
Document
Published: 02 Mar 1905
-
Lake Frome East. Progress and final reports to licence expiry for the period 13/11/79 to 12/5/80.
As part of a wider search over SA for possible continental salt lake occurrences of NaCO3-rich brines and of fossil crystalline trona beds, presumed to be equivalent to the Lake Magadi (Kenya) / Green River Basin (Utah - Wyoming) style Tertiary...-
Document
Published: 30 Apr 1980
-
Wooltana. First partial relinquishment report for the period 19/9/2002 to 18/9/2004.
Two small peripheral areas of the subject licence have been relinquished owing to their perceived poor potential for containing economic palaeochannel uranium mineralisation within Tertiary sediments. The western area is seen as being almost devoid...-
Document
Published: 02 Mar 1905
-
Mount Yerila. First partial surrender report for the period 26/8/2002 to 25/8/2004.
Two peripheral areas of the subject licence have been relinquished owing to their perceived poor potential for containing economic palaeochannel uranium mineralisation within Tertiary sediments. Two rotary mud drillholes were drilled in the western...-
Document
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 2 partnership DPY2-11, Lake Blanche region Quaternary palaeochannel / palaeolake margin calcrete - hosted or roll-front style uranium mineral prospects. Project final report.
Approved PACE project DPY2-11 was an attempt to find calcrete or roll-front type sedimentary uranium mineralisation in Quaternary fluvial channels that drain the northern and eastern margins of the uranium-enriched Mount Painter and Mount Babbage...-
Document
Published: 20 Sep 1906
-
Woolatchi Creek. Progress and annual reports for the period 20/2/80 to 11/4/83.
41 open-hole rotary drillholes (total 5999 metres) were drilled and geophysically logged to search for possible sedimentary uranium occurrences in the Early Cretaceous Parabarana Formation and in overlying altered Miocene sands, over an area of the...-
Document