-
Pernatty Quarry. Reports on site investigations for the period September 1986 - March 1989, re. Pernatty Crushing Contract no. 1 [let to McMahon Construction Pty Ltd].
Geoscientific information on quarry materials, copied from former Highways Department files. The subject quarry site was chosen in order to provide crushed rock products for the reconstruction of the Pimba - Wirrappa section of the Stuart Highway....-
Document
Published: 17 Mar 1989
-
Data release - as updated [made at SA Director of Mines' discretion] : Charlinga area. Annual technical report for the period ending 22/03/2019.
The Hesso project is located in the Charlinga area approximately 65km North of Port Augusta along the Stuart Highway. The primary mineral target for the Hesso project is kaolin. Historic activities in the area reported occurrences of kaolinite clay in...-
Document
Published: 09 May 1919
-
Data release [made at SA Director of Mines' discretion] : Mount Gunson (part of the Mount Gunson Project). Annual reports for the period 15/7/1994 to 17/10/2008 [ Index Part 4 of 4 ].
During licence Year 12, following encouraging results made by its continuing exploratory drilling, Gunson Resources was able to negotiate a joint venture over the Mount Gunson Project tenements with Falconbridge Limited through its subsidiary Noranda...-
Document
-
Pandurra. Progress reports to licence expiry/renewal, for the period 23/3/1973 to 22/3/1975.
Regional exploration for Mount Gunson type stratabound copper mineralisation over an area extending from Whyalla to near Lake Torrens comprised geological mapping, rock chip geochemical sampling, and the drilling of 157 rotary stratigraphic holes...-
Document
-
Pandurra. Progress reports and final report to licence expiry/renewal, for the period 7/4/1975 to 6/4/1977.
Ongoing exploration for a possible Cattlegrid type stratabound copper deposit over an area south-west of Lake Torrens included aerial magnetic and EM surveys, drill testing of EM anomalies by 47 percussion holes totalling 2086 m, a regional magnetic...-
Document
-
Aerial [INPUT] EM survey data interpretation and follow-up drilling results, Winnie Pinnie area, Stuart Shelf, for the period April 1976 to May 1979.
The results of 1185 line km of aerial EM surveying carried out in the vicinity of Winnie Pinnie Dam, 85 km north-west of Port Augusta, using the Barringer INPUT system, have been interpreted as a possible means of identifying prospective Adelaidean...-
Document
-
Mount Gunson. Reports on trial seismic refraction surveys conducted in 1966 and 1972 to map possible ore-bearing horizons.
Reports describe the results of two attempts to use seismic refraction methods to map an unconformable subsurface interface between lithic sandstone and quartzite units within the Whyalla Sandstone. This palaeosurface is important as a locus for...-
Document
-
Report on the Magazine Hill clay, Pandurra area, SA.
The Magazine Hill clay stratum is a weathering product of the black shale facies beds of the Woocalla dolomite and of the siltstones of the Yudnapinna Beds. Some evidence suggests that the stratum was formed during a pre-Marinoan marine regression and...-
Document
Published: 18 Oct 1974
-
Data release - as updated [made at SA Director of Mines' discretion] : Eucolo Creek (also called the Churchill Dam Project). Annual reports for the period 31/1/2006 to 14/11/2018.
EL 3511 Eucolo Creek, of 528 square km, is situated near the eastern margin of the Gawler Craton within the Olympic Dam Domain, approximately 90 km south-west of the Olympic Dam IOCG-U deposit (3.98 billion tonnes at 1.1% Cu, 0.4 kg/t U3O8 and 0.5 g/t...-
Document
Published: 01 Dec 1918
-
Mount Gunson (part of the Mount Gunson Project). Third partial surrender report, for the period 16/6/1994 to 22/9/2010.
No work has been undertaken recently on the currently relinquished portion of EL 4460. However, previously this piece of ground, located between Lake Dutton and the southern end of Pernatty Lagoon, has formed part of three successive licences held...-
Document
-
Report on the Mount Whyalla barite mine, Pandurra area, SA.
Report briefly discusses the mode of occurrence and inferred genesis of a previously worked small barite deposit, now located within EL 50, that is the subject of new interest by a private prospector seeking permission to peg a mineral claim.-
Document
-
Lake Dutton. Progress reports to licence expiry/renewal, for the period 1/10/1968 to 30/9/1970.
Possible economic stratiform base metal mineralisation formed within the Woocalla Dolomite Formation, which is shallowly buried over a wide area south-east of Lake Dutton, was targeted by ongoing work in an area located west and south-west of Pernatty...-
Document
-
Pernatty Lagoon. First partial surrender report at licence expiry/renewal, for the period 20/7/1973 to 19/7/1975.
Exploration conducted by CSR Ltd for possible economic stratiform base metal deposits in the western part of EL 81 addressed several targets, including Cattle Grid type disconformity - related copper mineralisation, Sweet Nell / MG14 type...-
Document
-
Lake Macfarlane - Lake Finniss area. Progress reports to licence expiry/full surrender, for the period 1/7/1967 to 31/12/1967.
Consultants were engaged by the licensee to conduct an extensive geological and geochemical investigation of a 2700 square mile area surrounding the Mount Gunson copper deposit, and to perform an interpretation of available regional aeromagnetic data....-
Document