-
RB 98/00014 Clare Drilling. Phase 2 - June 1997.
Phase Two of a drilling program at Clare, South Australia was undertaken in June, 1997. A total of 6 bores were drilled, 4 of these at existing locations established during Phase One drilling in January, 1996, and a further 2 at Watervale Oval as...-
Document
Published: 01 Mar 1998
-
Data release [made at SA Director of Mines’ discretion] : Reaphook Hill and Mount Frome (part of the Flinders Ranges Project). Respective early annual reports, for the period 17/1/2000 to 16/1/2002.
Two adjoining licence areas located ~50-70 km to the east and south-east of Blinman are being explored for possible economic buried willemite (zinc silicate), scholzite (zinc phosphate) and other base metal mineralisation associated with particular...-
Document
-
Mount Mantell. Final report at licence surrender, for the period 22/11/1983 to 21/2/1984.
An area centred approximately 100 km north-east of Hawker was taken up to look for possible economic Mississippi Valley type lead-zinc mineralisation that may have formed locally within the Cambrian Wilkawillina Limestone. A proposed programme of...-
Document
-
Manna Hill [not 'Mannahill']. Progress reports to licence expiry/full surrender, for the period 16/10/1987 to 15/1/1990.
TARGET: Possible concealed, saddle-reef type lode developments of inferred Telfer-style gold deposits at the Manna Hill Goldfield. EXPLORATION: Reconnaissance inspection of old mine workings, rock chip sampling (79), and shallow RAB bedrock drilling...-
Document
-
PACE Discovery Drilling (drilling partnerships with DSD and industry): Year 8 partnership DPY8-21 - Yerelina Gladstone Mining Field sediment-hosted and structurally controlled hydrothermal/replacement style stratabound base metal prospects. Final report.
High-grade silver-lead-zinc mineralisation formed within the Neoproterozoic Tapley Hill Formation (THF) was historically mined 100 years ago at Yerelina in the northern Flinders Ranges. Despite the existence of numerous poorly documented small-scale...-
Document
Published: 08 Dec 1915
-
Data release - as updated [made at SA Director of Mines’ discretion] : Boolooroo Goldfield and Kate Hill. Joint annual reports for the period 2/1/2009 to 8/2/2019.
Two adjoining licence areas located ~ 40 km north-east of Leigh Creek township, in the ranges lying immediately east of the Telford coal basin, are being explored for possible economic occurrences of marble rock which are believed to hold enormous...-
Document
-
RB 2010/00019 Hardrock extractive minerals for metropolitan Adelaide - strategic review. [Summary version]
The purpose of the project is to provide essential data on the hardrock extractive (construction material) resources supplying the Adelaide metropolitan area, in order to be able to: - Critically examine current hardrock supplies and resources and how...-
Document
Published: 01 Oct 2010
-
Melton. Progress reports to licence surrender, for the period 21/7/1980 to 24/5/1989.
A small area located about 20 km north-west of Port Wakefield was taken under licence by ETSA to try to secure limestone/dolomite material of suitable quality and in sufficient quantity to provide chemical additives for aiding the process of...-
Document
Published: 20 Apr 1989
-
Mount Norwest (part of the Willouran Ranges Project). Annual reports to licence expiry/cancellation, for the period 8/9/2010 to 7/9/2013.
A search primarily directed at assessing the stratiform copper and magnesite potential of an area centred 50 km south-west of Marree has consisted mainly of office studies comprising the collection and review of open file geoscientific data. Early in...-
Document
-
Mount Norwest (part of the Willouran Ranges Project). First partial surrender report for the period 19/6/2014 to 18/6/2016.
61% of a subsequent licence area located in the southern Willouran Ranges has been surrendered due to its perceived diminished prospectivity for buried economic Neoproterozoic stratiform copper mineralisation and inferred MVT, replacement or...-
Document
-
Mount Ogilvie. Technical, annual and final reports to licence expiry for the period 14/2/97 to 22/5/2003.
Photo lineament analysis of an area centred on Mount Ogilvie, 30 km north-east of Leigh Creek, identified several targets considered to be potentially prospective for mineralisation. During a brief field visit seeking work clearance from native title...-
Document
Published: 23 Jul 1903
-
Boolooroo. Progress reports for the period 18/12/1969 to 17/12/1971.
A consultant's technical review was received on existing recent exploration data originating from the SA Mines Department, for the Mount Coffin Diapir and its immediate environment. It was found that significant geochemical and induced polarisation...-
Document
-
Mineral Resource Potential Map Series - Quorn.
There is no abstract created for this record-
Map
Published: 01 Sep 1916
-
Mineral Resource Potential Map Series - Adelaide.
There is no abstract created for this record-
Map
Published: 01 Jun 1915
-
Mineral Resource Potential Map Series - Port Augusta.
There is no abstract created for this record-
Map
Published: 01 Sep 1916
-
Moolooloo. First and final progress report to licence surrender, for the period 1/7/1968 to 15/3/1969.
Exploration for possible economic hydrothermal / replacement style copper deposits within two known mineralised areas on the northern margin of the Blinman Diapir comprised geological mapping of the stratigraphic / structural setting of accessible...-
Document
-
Progress report on [near-mine] exploration activities [performed by the] Burra [Joint] Venture, for the period 10/10/1965 to 28/2/1967.
At the invitation of the South Australian Department of Mines, a mining company consortium has been formed to continue recent SA Government studies at Burra aimed at establishing the economic feasibility of re-opening the historic copper workings to...-
Document
Published: 29 Mar 1967