-
Mount Allalone. Progress and annual reports for the period 14/6/89 to 31/7/95.
Base metal exploration of two lead-zinc mineralized areas previously discovered by Billiton and WMC within Hutchison Group metasediments near Mt Allalone, northwest of Buckleboo on central Eyre Peninsula, comprised ground magnetic and EM surveys, RAB...-
Document
Published: 02 Nov 1995
-
RB 79/00088 Wilkinson 1. Well completion report.
Wilkinson 1 stratigraphic well was drilled by the SA Department of Mines and Energy in mid-1978, about 250 km south-west of Coober Pedy, in the Tallaringa Trough. Here a thick section of Cambrian claystones, limestones and evaporites, at least 594 m...-
Document
Published: 01 Oct 1979
-
Data release [made at SA Director of Mines' discretion] : Bulgunnia (part of the Gawler JV Project). Annual reports for the period 19/11/1997 to 1/1/2013.
Within an area of the Wilgena and Christie Domains centred 40 km north of Tarcoola, exploration is continuing for Archaean to Proterozoic basement-hosted epithermal, hydrothermal and metamorphic type gold and base metal occurrences. Here an 841 square...-
Document
-
Reaphook Hill and Mount Frome (a tenement group having amalgamated expenditure commitments, which is part of the Flinders Ranges Project). Joint annual reports for the period 4/8/2001 to 1/7/2015.
During the third year of exploration nominally ending on 1/7/2002 [and subsequent to the starting date of 5/3/2002 for the application of provisions of the Flinders Ranges Project's multi-tenement Amalgamation of Expenditure Agreement (AEA), whence...-
Document
Published: 07 Aug 1915
-
Murray Basin. Final report, Project ADI RD02-289 [Accelerated Discovery Initiative Round 2, 2022].
Hillgrove Resources Ltd (HGO) has identified a large number of geophysical targets through the south-east Cambro-Ordovician basement of South Australia prospective for Cu-Au mineralisation and covered by the Tertiary-Quaternary Murray Basin sediments....-
Document
Published: 12 Sep 1922
-
Mount Olinthus. Progress reports plus interim final report to licence expiry/renewal, for the period 12/7/1978 to 7/11/1987.
TARGET: Unconformity related, vein-like and vein-type uranium in the Cleve Metamorphics, Katunga Dolomite and Mangalo Schist; lead-zinc sulphides of Broken Hill or Balmat-Edwards type in the Hutchison Group. EXPLORATION: Uranium exploration...-
Document
-
Baratta. Progress and final reports for the period 27/5/1971 to 26/4/1972.
An airborne spectrometer/magnetometer survey of the Upper Proterozoic rocks of the northern Bibliando Dome, covering 877 line miles at approximately a height above ground level of 300 feet and line spacing of 1000 feet, was conducted by joint venturer...-
Document
-
Data release [made at SA Director of Mines' discretion] : Bremer. Progress reports and annual reports to licence expiry/renewal, for the period 8/3/1991 to 7/3/1995. [ Index Part 1 of 3 ].
Exploration of an extensive area lying to the north of and surrounding Strathalbyn, 40 km south-east of Adelaide, is targeting possible economic stratiform base and precious metals mineralisation hosted within the Cambrian Kanmantoo Group...-
Document
-
Data release [made at SA Director of Mines' discretion] : Bremer. Progress and annual reports to licence expiry/renewal, for the period 8/3/1991 to 7/3/1995. [ Index Part 2 of 3 ].
In May 1992 six traverses of shallow RAB drilling were completed at the Angas prospect (222 holes for a total penetration of 1550 m). The objective was to test the Cambrian bedrock geochemistry beneath shallow Tertiary and Recent sediments that cover...-
Document
-
Aroha. Progress reports and final report to licence expiry/full surrender, for the period 27/5/1980 to 26/5/1982.
As part of Esso's continued exploration programme for buried Late Proterozoic stratiform uranium deposits in the Uno - Corunna area, detailed geochemical, petrological, thermoluminescence and lead isotope studies were performed on samples obtained by...-
Document
-
Wedge Hill (Mount Wedge Project). Annual and final reports for the period 26/5/1997 to 25/5/1999.
Groundwater sampling, aeromagnetic interpretation, shallow auger sampling and isotope studies were carried out over an area 30 km northeast of Elliston. Heavy mineral concentrates from composite auger samples contained zircon, galena and sphalerite,...-
Document
-
Mount Compass (the Finniss River Project). Combined first annual/final report to licence expiry/full surrender, for the period 19/11/1996 to 18/11/1997.
A gossanous bedrock outcrop present within Early Cambrian sediments of the central Fleurieu Peninsula, and situated 16 km north-east of Mount Compass township, was investigated as a possible Mississippi Valley - type (MVT) base metals target....-
Document
-
Mulyungarie (part of the Yarramba Joint Venture Project). Data release upon first partial relinquishment and in consequence of a transfer of licence ownership : progress and technical reports for the period 4/7/1978 to 2/5/1991. [ Index Part 2 of 2 ].
After the signing of a new joint venture agreement for the three Yarramba Project tenements (EL 1004 South Eagle, EL 1352 Strathearn and the subject EL 1060 Mulyungarie) in early 1986, the CSR-led partners began exploration for possible Olympic Dam -...-
Document
Published: 31 May 1991
-
Hiltaba. Progress and final reports for the period 22/6/1972 to 21/6/1973.
Rock chip and stream sediment samples were analysed for U, Th and base metals. In addition, water samples from bores were analysed for U. All assays were low. It was concluded that the Hiltaba Granite has slightly elevated but insignificant levels...-
Document
Published: 17 Oct 1973