-
Assessment of hydrocarbon resource potential in Australian sedimentary basins: development of fission track techniques.
This project has advanced the techniques of fission track analysis as a means of reconstructing the thermal evolution of sedimentary basins so that the conditions and timing of hydrocarbon generation can be assessed. It has been shown that the...-
Document
-
Blanchewater Hill. Progress and final reports for the period 11/8/80 to 10/8/82.
Drilling of two percussion holes (aggregate 400 metres) near Yerila, south of Lake Blanche, failed to give encouragement to the search for possible Permian coal and Tertiary uranium in the southern Eromanga Basin / Lake Blanche Lineament uplift area...-
Document
-
South Eagle [part of a joint licence area with Kalabity]. Uranium exploration progress and technical reports to licence expiry/renewal, for the period 15/5/1974 to 14/2/1976.
During the EL 132 tenure, work has consisted of a mineability evaluation of the Honeymoon uranium deposit, plus additional U exploration over the South Eagle farmout. Initially, 5 rotary holes (total 594.9 m) were drilled to the north of the...-
Document
-
Lake Carnanto. Progress reports and final report to licence full surrender, for the period 30/11/1978 to 11/2/1983.
The south-eastern Lake Frome Embayment in the vicinity of Quinyambie Station was explored for Upper and Lower Tertiary 'blanket' or 'roll front' type sedimentary uranium, via the drilling of 75 open vertical rotary mud holes with a total penetration...-
Document
-
Lake Phillipson area. Progress and technical reports for the periods 23/11/1978 to 22/11/1980, and 12/2/1981 to 11/5/1982. [forms Part 2 of a SADME - compiled Lake Phillipson coal deposit data package released in December 1994].
The licensee's 1981 coal search programme at Lake Phillipson had the following objectives: - delineation of the total extent of the coal measures; - resolution of seam stratigraphy and correlation of seams between the Main and West Areas; -...-
Document
-
Frome Downs and Curnamona. Respective progress reports, annual reports and JV partner's final report to licences' joint expiry/renewal, for the period 11/2/1971 to 12/2/1973.
77 rotary / diamond holes drilled by Pacminex (total 9385 m, including 196 m cored) plus another 53 holes drilled within SML 544 by joint venturer Esso (total 7029 m) indicate that a highly prospective radioactive mineralised zone occurs within...-
Document
-
RB 60/00107 Stuart Range no. 3 bore, Coober Pedy, stratigraphy and micropalaeontology.
Stuart Range No.3 bore, which was deepened by rotary drilling during January-March 1965 in a search for additional underground water supplies for the Coober Pedy Opalfield, and which was completed as a stratigraphic bore (with some bottomhole rotary...-
Document
Published: 26 May 1965
-
RB 85/00055 Preliminary report on the palynostratigraphy of SADME Toodla no. 1 well, southwestern Eromanga Basin.
5 spore / pollen zones and 3 dinoflagellate zones are recognised in Toodla 1, ranging from late Jurassic to Late Albian. The Mesozoic units penetrated by this well on palynological evidence are younger than traditionally recognised in other parts of...-
Document
Published: 01 Oct 1985
-
RB 96/00021 Palynological dating and correlation of Mesozoic sediments from the ABMINGA 1:250 000 sheet, SA.
Palynological evidence indicates that all 13 submitted drill core sedimentary rock samples, excepting one (taken at 138.2 metres depth in hole A68-1), are late Aptian to earliest Albian in age. The sediments were deposited in environments ranging...-
Document
Published: 01 May 1996
-
Olympic Dam Project. [Artesian] mound springs of the Lake Eyre South region [environmental] monitoring : half-yearly reports for the period from April 1998 to October 2005.
There is no abstract created for this record-
Document
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 3 partnership DPY3-18, Glencoe (Lake Frome East) area roll-front style uranium mineral prospects. Project interim and final reports.
The subject EL 3391 is located in the eastern Lake Frome region, and is prospective for roll-front type uranium mineralisation emplaced within sediments of the Tertiary Lake Eyre Basin. In December 2006, as part of the PACE Initiative Year 3...-
Document
Published: 02 Mar 1907
-
Data release - as updated [made at SA Director of Mines’ discretion] : Ethiudna. Annual reports to licence expiry/renewal, for the period 22/2/2004 to 22/2/2015.
An area centred ~50 km north-west of Olary is continuing to be explored for possible buried economic Prominent Hill or Olympic Dam type iron oxide associated copper-gold (IOCG) breccia style mineralisation. The area is considered highly prospective...-
Document
-
Data release - as updated [made at SA Director of Mines’ discretion] : Paralana Creek (part of the Beverley Project). Annual reports for the period 29/9/2009 to 15/11/2015.
Work undertaken on EL 4378 during the 2009-2010 reporting year included the drilling of 478 vertical rotary mud holes totalling 132,960 m, and core drilling totalling 4117 m performed in 16 of these holes for stratigraphic unit / resource...-
Document
Published: 24 Dec 1915
-
Curnamona Province.
CURNAMONA PROVINCE SUMMARY Age: Sedimentation - late Palaeoproterozoic to early Mesoproterozoic. Felsic and mafic volcanism - late Palaeoproterozoic to early Mesoproterozoic. Granitic intrusion - late Palaeoproterozoic to early...-
Document
Published: 01 Jan 2003
-
Abminga Diamond Project. Data release made at licence renewal [and project cessation]: progress reports and annual reports for the period 25/10/1993 to 17/3/2004.
The Abminga Diamond Project, undertaken by Caldera Resources NL, was granted exploration project status, including permission for EL joint reporting, in July 1996. This event followed up to two years of work by other operators on a number of...-
Document
-
Report on recent exploration in SMLs 543, 544, Crocker Well prospect 22, Lake Frome, South Australia.
A 64 line km gravity survey, with stations located at 150 m spacing, was conducted to locate the position of the main Billeroo West palaeochannel within the northern part of SML 543, in order to assess the need to retain under exploration tenure the...-
Document
-
Starvation Lake. Progress reports and final report on regional exploration programme at licence surrender, for the period 13/1/1972 to 31/7/1972.
In a search for possible economic roll-front, blanket style uranium deposits within Tertiary sediments in part of the eastern Frome Embayment, the licensee undertook 1:75,000 scale geological mapping and exploratory auger drilling of the Quaternary...-
Document
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 1 partnership DPY1-47 - [prospecting for] water in Permian palaeochannels draining the Mount Woods Inlier. Project final report.
Development of the Prominent Hill copper-gold deposit in the Mount Woods region will require an adequate source of water to support planned mining and ore processing operations, currently estimated to involve at least 6 million tonnes of ore per year....-
Document
Published: 10 Jun 1905
-
Data release - as updated [made at SA Director of Mines’ discretion] : Mount Yerila. Annual reports for the period 27/8/2009 to 26/8/2015.
During the 2009-2010 licence year, 8 vertical open rotary mud drillholes, YR035 to YR042, were completed along two drill traverses for a total penetration of 1614 m. They were designed to intersect the Eyre Formation adjacent to interpreted faults in...-
Document
Published: 10 Sep 1913
-
Data release [made at SA Director of Mines' discretion] : Edward Creek (part of the Edward Creek Joint Venture Project). Progress and annual reports for the period 7/12/1987 to 22/9/2008. [ Index Part 2 of 2 ].
After licence management was returned to Reedy Lagoon for a third time, the licensee studied Cauldron Resources' 1996 aeromagnetic data and identified an additional three magnetic anomalies (EC23, 26 and 27) possessing possible kimberlite traits....-
Document