-
RB 98/00010 Regolith studies related to the Challenger gold deposit, Gawler Craton, South Australia. Geochemistry and stratigraphy of the Challenger gold deposit - Volume 1: text, and Volume 2: appendices.
The Challenger gold deposit lies in the northern Gawler Craton, South Australia, 750 km NW of Adelaide, and 140 km NW of Tarcoola. A 1.5 km traverse (the regolith line) was chosen for the study of geochemical dispersion and regolith stratigraphy...-
Document
Published: 01 Mar 1998
-
South Vivian [Homestead]. Annual reports and final report to licence expiry/full surrender, for the period 12/6/2007 to 11/6/2009.
An area located on the northern Stuart Shelf between Olympic Dam and Prominent Hill, approx. 50 km south-southwest of the latter, has been explored for possible Olympic Dam type iron oxide - associated copper-gold (IOCG) deposits and for Canadian...-
Document
Published: 17 Oct 1909
-
Port Broughton, Redhill and Mount Remarkable - Port Augusta areas (part of the Moonta North Project ELs combined reporting group). Annual reports and joint final report at licences' surrender, for the period 19/4/2002 to 22/5/2006.
Economic deposits of iron-oxide associated copper-gold mineralisation of the Moonta-Wallaroo or Olympic Dam style, hosted in Palaeoproterozoic basement rocks of the Moonta Sub-domain, were targeted by exploration in three now surrendered licences,...-
Document
-
Wynbring [Siding]. Data release made in lieu of submitting a first partial surrender report upon licence expiry/renewal : annual reports for the period 30/8/2004 to 29/8/2009.
An area located approximately 160 km north-northwest of Ceduna is being explored for possible economic nickel-copper-platinum group metal magmatic mineral deposits, which may have formed within Archaean to Proterozoic basement rocks in a geological...-
Document
-
Porter Hill. Annual reports for the period 26/8/1998 to 26/5/2000 (the commencement of the Lake Torrens Project joint reporting period) : part of a data release made on 31/12/2006 upon a subsequent partial surrender.
Following the detection in late 1997, by reconnaissance mobile metal ion partial leach analytical methods, of anomalous base and precious metal concentrations in the soil above several low amplitude magnetic anomalies on Tasman Resources' EL 2340, the...-
Document
Published: 25 Oct 1999
-
Moonta - Wallaroo area. Second partial surrender report, for the period 10/1/2002 to 11/4/2009.
Work completed within the three now relinquished small portions of this licence (total 6.16%) has included regional and semi-detailed calcrete sampling (56 samples taken at 1 km spacing, plus 111 infill samples taken on 400 m grid centres), parts of...-
Document
-
Mabel Creek. Annual reports submitted until the commencement of joint licence reporting on the Mabel Creek JV Project tenements, for the period 20/12/1999 to 23/3/2006.
Exploration currently underway for possible economic buried iron oxide - associated copper-gold (IOCG) mineralisation within Proterozoic basement on the Mabel Creek High, in one of two joint venture group project licence areas located approximately 50...-
Document
-
Bopeechee. Final report at licence expiry/full surrender, for the period 16/11/2000 to 27/7/2008.
In on-ground exploration of an area on the Stuart Shelf located 18-46 km north-east of Olympic Dam, possible economic sedex - style, Mount Isa / Nifty type stratabound copper was targeted within Neoproterozoic carbonate rocks as part of multiple...-
Document
-
Tarcoola. Data release in lieu of a 25% second partial surrender at licence renewal : progress and annual reports for the period 7/12/1990 to 20/4/2003. [ Index Part 1 of 4 ].
The abstract for this Envelope is contained (in three parts) as separately indexed records, due to SAMREF database system individual record data size limits presently applicable.-
Document
-
Unlocking South Australia's Mineral and Energy Potential - A Plan for Accelerating Exploration. Theme 2 (drilling partnerships with PIRSA and industry) : Year 1 partnership no. DPY1-12, Chianti mineral prospect. Project final report.
The subject report describes the results of drilling two fully cored rotary holes totalling 1161.10 m at the Chianti prospect, an unusually-shaped residual gravity anomaly located in Gunson Resources' EL 3264, 20 km north-east of the Mount Gunson...-
Document
-
Whyalla. Annual reports and final report to licence expiry/full surrender, for the period 12/6/2003 to 11/6/2008.
Evaluation of the perceived Olympic Dam style copper-gold and Stuart Shelf type stratabound copper potential of, respectively, the Proterozoic basement and the Adelaidean cover rocks in an area lying immediately to the west of the Cultana Inlier was...-
Document
Published: 01 Oct 1908
-
Carnding. Data release made in lieu of submitting a second partial relinquishment report at licence expiry/renewal : progress reports and annual reports for the period 29/9/1994 to 16/1/2005.
Renewed brownfields gold exploration in an area situated 20-40 km north and west of the Tarcoola Goldfield, previously held in part by the licensee as EL 1848, was prompted by the May 1995 success of the Samantha/Resolute/Dominion corporate joint...-
Document
Published: 28 Jul 1905
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 2 partnership DPY2-21, Yarlbrinda Shear Zone, subsidiary fault plays, Tunkillia - style gold prospects. Project final report.
It has lately been recognised by explorers that subsidiary fault splays developed adjacent to the main Yarlbrinda Shear Zone may be more prospective for hydrothermal gold deposits than the main zone. In an approved PACE Initiative Year 2 drilling...-
Document
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 2 partnership DPY2-13, evaluation of the Marathon South mineral occurrence. Project interim and final reports.
Following further detailed ground gravity surveying and data processing carried out to better understand the gravity response of relatively dense and weakly magnetic basement rocks at the Marathon South prospect, located within EL 3209 and lying...-
Document
Published: 10 May 1906
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 3 partnership DPY3-14, Pernatty Lagoon area (eastern Gawler Craton) IOCG mineral prospects. Project final report.
PACE proposal DPY3-14 aimed to discover a new iron oxide - associated copper-gold (IOCG) mineralised magmatic centre, similar to the Olympic Dam setting, within the eastern margin of the Gawler Craton. The Pernatty Lagoon project is located less than...-
Document
Published: 20 Sep 1906
-
Trumpeter (part of the Mount Woods Joint Venture Project). Annual and final reports to licence surrender for the period 19/12/2000 to 29/11/2007.
Ground covering a major east-west trending shear zone in the north-eastern portion of the Mount Woods Inlier was taken up by Goldstream Mining to allow an evaluation of its IOCG - style mineralisation potential, possibly for Fe-Cu-Au occurrences of a...-
Document
-
Botenella Range (now part of the Wilcherry Hill JV Project). Progress, annual and final reports to the commencement of the project licences' combined reporting status, for the period 14/2/1991 to 18/9/2002.
Exploration of an area lying west of Lake Gilles concentrated initially on assessing its potential for hosting syngenetic Palaeoproterozoic stratiform base metal deposits along perceived stratigraphic extensions of the beds containing the recently...-
Document
Published: 16 Oct 1903
-
Summary of the structural setting of the Perseverance mine area, Tarcoola.
There is no abstract created for this record-
Document
Published: 31 Jul 1993
-
Gawler Project Central Tenement Block [Part]. Data release at licences' joint partial surrender: Southern Gold gold exploration JV - specific annual reports 6/2/2006 to 30/6/2009. [Index Part 2 of 2].
After the Southern Gold joint venture agreement was signed in February 2006, that company as JV operator performed a due diligence review of Dominion Mining's exploration data, did some orientation soil calcrete and biogeochemical sampling at Typhoon...-
Document
Published: 02 Feb 1910
-
Gawler Project Central Tenement Block [Part]. Data release at licences' joint partial relinquishment: project combined annual reports, plus Southern Gold gold exploration JV - specific annual reports, 27/10/2004 to 30/6/2009. [Index Part 1 of 2].
During the first three years of the subject reporting period, exploration carried out by Dominion Mining as Gawler Project sole owner and operator was concentrated in and around the Challenger gold mine, to assist in defining ore reserves within the...-
Document
Published: 02 Feb 1910