-
Cleve Central area. Progress and final reports to licence expiry for the period 7/6/1979 to 11/10/1985.
Exploration for Broken Hill or Aggeneys type Proterozoic stratiform base metal massive sulphides within the Hutchison Group in the Mount Shannan area, north of Cleve, has included the acquisition, processing and interpretation of airborne magnetic,...-
Document
-
Botenella Range (now part of the Wilcherry Hill JV Project). Progress, annual and final reports to the commencement of the project licences' combined reporting status, for the period 14/2/1991 to 18/9/2002.
Exploration of an area lying west of Lake Gilles concentrated initially on assessing its potential for hosting syngenetic Palaeoproterozoic stratiform base metal deposits along perceived stratigraphic extensions of the beds containing the recently...-
Document
Published: 16 Oct 1903
-
Data release - as updated : Lake Gilles (part of the East Eyre [Peninsula] Project). Annual reports to licence expiry/full surrender, for the period 22/12/2005 to 28/11/2016.
Exploration aimed primarily for economic buried Menninnie Dam - style base and precious metals mineralisation hosted by Palaeoproterozoic metasedimentary basement has been conducted on a licence located in the Lake Gilles district. The subject area...-
Document
Published: 11 Jan 1917
-
Mount Miccollo, Tin Hut Hill, Eurilla Dam, Wilcherry Hill, Uno, Peterlumbo and Mount Double (the Wilcherry Hill Project). Joint annual reports for the period 1/11/2002 to 31/10/2018.
During Year 6 of the project, Trafford Resources designed their drilling program to test the extent of the Pb/Zn/Ag/U mineralisation at the Telephone Dam Prospect, while JV partners Ironclad Mining’s drilling program was designed to define the Direct...-
Document
-
Data release [made at SA Director of Mines' discretion] : Lake Gilles. Annual reports submitted until the commencement of the Eurilla JV Project licences' joint reporting, for the period 30/1/2007 to 29/1/2010.
A sparsely drill-tested area centred about 10 km west of Lake Gilles is being explored for a variety of buried, possibly economic basement-hosted polymetallic mineralisation occurrences, including deposits of Menninnie Dam style Pb-Zn-Ag (Cu-Au),...-
Document
Published: 30 Mar 1910
-
Lake Gilles. Progress reports to licence expiry/full surrender, for the period 19/5/1969 to 18/5/1970.
Exploration for possible economic hypogene base metal sulphide deposits associated with poorly exposed iron-rich linear outcrops, overlying faulted Archaean to Palaeoproterozoic basement which is obscured by extensive Cainozoic sedimentary cover rocks...-
Document
Published: 01 Apr 1970
-
Kimba. Third partial surrender report submitted at licence expiry/renewal, for the period 6/11/2006 to 5/11/2016.
63 square km or 23% of the former area of EL 4938, in two separate blocks, has recently been relinquished due to a lack of encouraging results, and difficulty with land access onto certain private properties located therein due to some farmers’...-
Document
-
Myola. Annual reports and final report to licence full surrender, for the period 8/11/1996 to 29/7/2003.
Palaeoproterozoic gold, copper and base metal occurrences were the targets of exploration in an area surrounding the Iron Baron mine that, in a tectonic sense, incorporates parts of the Cleve, Middleback and Moonta Subdomains. Regional calcrete...-
Document
-
Lake Gilles (part of the East Eyre Peninsula Project). Second partial surrender report, for the period 22/12/2005 to 13/9/2016.
Approximately one-third of the southernmost sub-block 'D' of the subject EL 5109 has been relinquished to comply with expenditure commitments made for the East Eyre Peninsula Project. Activities within the now relinquished area have consisted of...-
Document
Published: 10 Oct 1916
-
Kimba. Second partial surrender report, for the period 6/11/2006 to 5/11/2015.
112.3 square km or 29% of the former area of EL 4938, in two separate blocks, has recently been relinquished due to a lack of encouraging results, and difficulty with land access onto certain private properties located therein due to some farmers’...-
Document
Published: 07 Dec 1915
-
Menninnie Dam (part of the Fleurieu - Menninnie Dam Exploration Joint Venture Project). Combined annual report for the 5-year period 24/9/2005 to 26/10/2010, plus annual reports for the period 27/10/2010 to 26/10/2012.
During the 5-year period 2005-2010, intensified exploration undertaken at Menninnie Dam was focussed on the discovery and delineation of structurally controlled hydrothermal Pb-Zn-Ag mineralisation. Carbonate-rich Hutchison Group metasediments forming...-
Document
-
Data release [made at SA Director of Mines' discretion] : Caralue and Kimba (the Ellemby Project, prior to inclusion as part of the East Eyre Peninsula Project). Joint annual reports for the period 6/11/2007 to 5/11/2010.
Two adjacent areas which are respectively centred near and to the south-west of Kimba are being explored for buried basement-hosted gold and nickel mineralisation, and, following establishment of a joint venture, for possible IOCG type deposits and...-
Document
-
Lake Gilles (latterly part of the Northern Eyre Peninsula Project). Annual reports until the commencement of project licences' joint reporting, plus the final report, for the respective periods 13/2/2007 to 31/5/2010 and 1/6/2014 to 31/5/2015.
A licence area originally comprising three separate sub-blocks located along the northern and southern sides of the Lake Gilles Conservation Park has been explored by grant licensee Lincoln Minerals Ltd (LML) and its joint venture partner IronClad...-
Document
Published: 19 Jun 1915
-
Moseley Nobs (part of the East Eyre Peninsula Project). Third partial surrender report, for the period 5/7/2006 to 4/7/2015.
EL 4860 has been part of the Investigator Resources Ltd tenement holding since that company was spun-off from Southern Gold in 2007 (as Sunthe Uranium Ltd). The Eastern Eyre Peninsula project group of licences, which lie along and just beyond the...-
Document
Published: 08 Oct 1915
-
Data release [made at SA Director of Mines’ discretion] : Carappee Hill. Annual reports for the period 17/10/2003 to 19/2/2010.
Paleoproterozoic metasediments of the Hutchison Group, and Lincoln Complex granitoids, were the targets of exploration for gold, base metals, and granite dimension stone in an area 40 km south of Kimba. In reporting year 3 for EL 2858, no field work...-
Document
Published: 04 Mar 1910
-
Data release [made at SA Director of Mines’ discretion] : Menninnie Dam (part of the Fleurieu - Menninnie Dam Exploration Joint Venture Project). Annual reports for the period 24/9/2001 to 23/9/2005.
The buried Menninnie Dam zinc-lead(-silver-copper) deposit, located approximately 55 km north of Kimba on northern Eyre Peninsula, and sitting adjacent to the south-eastern margin of the Gawler Ranges, is being evaluated for its future commercial...-
Document
-
PACE Copper Discovery Drilling (drilling partnerships with DSD and industry): Year 9 partnership DPY9-21 - Eyre Peninsula Project, Central Gawler Gold Province, Baggy Green North prospect biogeochemical anomaly. Drilling project final report.
Early in 2016, Adelaide Resources submitted a proposal to DSD for a grant of PACE Initiative Year 9 collaborative drilling project subsidy funds to help it drill ~80 exploratory aircore or RC holes for a total of approximately 8000 m to further...-
Document
-
Middlecamp Hills. First partial surrender report, for the period 30/6/2009 to 19/10/2017.
A small part, just 8 square km, of the Cleve Uplands district thought to contain outcrops of the Lower and Upper Middleback Jaspilite stratigraphic units has been explored for possible economic buried copper, gold, manganese and iron ore occurrences....-
Document
Published: 24 Oct 1917
-
Wilcherry Hill. Drilling at the Weednanna Au-Fe deposit, an exploration model for gold deposits formed in the southern Gawler Craton. Collaborative drilling and research final report, Project ADI RD02-265 [Accelerated Discovery Initiative Round 2, 2022].
Between 8 August and 6 October 2021, six inclined, rotary mud precollared diamond cored holes (21WDDH001 to 006) totalling 1560.6 m were drilled at the Weednanna gold and iron deposit located ~40 km north of Kimba on northern Eyre Peninsula, as part...-
Document
-
Tumby Bay and Butler. Progress and final reports to licence surrender for the period 15/7/91 to 30/5/93.
Exploration for gold in the banded iron formations of the Hutchison Group, conducted in the Tumby Bay area and west of Arno Bay on Eyre Peninsula, comprised a regional BLEG stream geochemical survey and follow-up stream, soil and rock chip sampling....-
Document