-
Marree. Annual report to licence expiry/full surrender for the period 16/9/2005 to 15/9/2006.
During a search for possible economic shallow alluvial or bedrock-hosted gold in the district surrounding Marree, two grab samples taken at sites located respectively south-west and east of the township found traces of gold, including 15.4 ppm Au in a...-
Document
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 5 partnership DPY5-07 - northern Gawler Craton - Welbourn Hill and Nicholson Hill magnetic/gravity anomalies IOCG-U mineral prospects. Project final report.
As part of a search for possible high crustal level, Olympic Dam - type IOCG deposits hosted by Mesoproterozoic basement rocks, Eromanga Uranium undertook deep diamond drill testing of two large, semi-coincident magnetic/gravity anomalies recognised...-
Document
-
Pyramid Bore. Annual reports and final report to licence full surrender, for the period 8/7/2005 to 5/1/2010.
An area located approximately 10 km north of Glendambo has been explored for possible economic buried uranium deposits which might be indicated by aerial radiometric anomalies associated with playa lakes in the region, since these latter mark zones of...-
Document
Published: 20 May 1910
-
Data release - as updated : Edward Creek (part of the Edward Creek Joint Venture Project). Annual reports and final report to licence expiry/full surrender, for the period 23/9/2008 to 11/11/2018.
Reedy Lagoon Corp. (RLC) has continued to look for minerals other than diamond, operating as the manager of exploration work for base metals (mainly copper) and uranium that was undertaken by the Edward Creek Base Metal Joint Venture (“ECBMJV”) during...-
Document
-
ELs 4678 - 4689 (the Oodnadatta Project). Joint annual reports, plus final reports at licences' individual or joint full surrenders, for the period 22/2/2011 to 9/9/2014.
The Oodnadatta Project consisted originally of twelve exploration licenses covering 7125 square km in far northern South Australia, this mainly being ground situated to the south and south-east of Oodnadatta. Uranium Equities Limited (UEQ) believed...-
Document
Published: 28 Oct 1914
-
ELs 4653 - 4661 (the Marla Project). Joint annual reports, plus final reports at licences' individual or joint full surrenders, for the period 25/1/2011 to 9/9/2014.
Nine licence areas occupying a 70 km x 30 km region overlying a west-northwest trending structural corridor situated along the northern margin of the Gawler Craton, have been explored for possible buried large-scale deposits of iron oxide - associated...-
Document
Published: 23 Oct 1914
-
PACE Discovery Drilling (drilling partnerships with DSD and industry): Year 8 partnership DPY8-11 - Lambina Station, northern Gawler Craton, Proterozoic sediment-hosted stratiform base metal prospect. Drilling project final report.
A small licence area centred ~70 km east of Marla has been taken up to explore for possible economic buried sedex style base metal deposits or IOCG style mineralisation which may exist there, hosted by largely unknown Proterozoic basement rocks,...-
Document
Published: 20 Nov 1915
-
Algebuckina. Annual reports to licence expiry/full surrender, for the period 3/8/2008 to 28/9/2014.
The only field work undertaken by Red Metal during its final six years of tenure of EL 3226/4307 Algebuckina was the assaying in 2011 of 88 soil and rock chip samples which it had collected from the vicinity of historically reported surface copper...-
Document
Published: 01 Oct 1914
-
Data release [made at SA Director of Mines' discretion] : Edward Creek (part of the Edward Creek Joint Venture Project). Progress and annual reports for the period 7/12/1987 to 22/9/2008. [ Index Part 2 of 2 ].
After licence management was returned to Reedy Lagoon for a third time, the licensee studied Cauldron Resources' 1996 aeromagnetic data and identified an additional three magnetic anomalies (EC23, 26 and 27) possessing possible kimberlite traits....-
Document
-
Bamboo Lagoon (latterly part of the Billa Kalina IOCG JV Project). Data release made at EL 4899 licence surrender: relevant parts of project licences' joint annual reports, plus a licence-specific final report, for the period 31/5/2012 to 30/5/2016.
During the four years of tenure of EL 4899, no field work took place there during licence Years 1, 3 and 4. The reported activities conducted on this now wholly surrendered tenement, which formed a part of Maximus Resources' Billa Kalina Project...-
Document
Published: 29 Apr 1916
-
Data release - as updated [made at SA Director of Mines' discretion] : Kalkaroo (part of the Mundi Mundi Plains JV Project). Annual reports for the period 21/4/2005 to 20/4/2010.
An area of shallowly covered Curnamona Province metalliferous basement rocks abutting the South Australia / New South Wales border, approximately 80 km north-east of Olary, is believed to be prospective for Broken Hill and McArthur River style...-
Document
Published: 06 Oct 1910
-
Data release - as updated : Pound Creek. Annual reports and final report to licence full surrender, for the period 1/12/2010 to 16/11/2017.
South Australia Ludi Mining Pty Ltd (“SALM”) acquired Exploration Licence 4619 in the vicinity of Coward Springs to explore it for large Mesoproterozoic copper/gold/uranium deposits analogous to Olympic Dam, which is located approximately 120 km to...-
Document
Published: 21 Nov 1917
-
PACE Copper Discovery Drilling (drilling partnerships with DSD and industry): Year 9 partnership DPY9-10 - northern Curnamona Province, Woolatchi magnetic anomaly Proterozoic basement IOCG mineral prospect. Drilling project final report.
The PACE Initiative Year 9 collaborative drilling project DPY9-10, which was undertaken between the Callabonna joint venture partners and DSD, aimed to discover a new copper-gold mineralised Iron Oxide Copper-Gold (IOCG) magmatic centre, similar in...-
Document
Published: 30 May 1917
-
Nilpinna (part of the Edward Creek Project). Annual reports to licence expiry/full surrender, for the period 13/5/2016 to 12/5/2018.
In continuing exploration for possible buried economic kimberlite diamond deposits that may have been intruded into Mesozoic and older basement and later become weathered out into cover sediments located along the western faulted margin of the Peake...-
Document
-
Data release - as updated [made at SA Director of Mines' discretion] : Lake Callabonna. Annual reports for the period 6/12/2013 to 5/12/2018.
In continuing exploration of a fragmented licence area consisting of four separate small sub-blocks located just short distances to the south and south-east of Lake Callabonna, the JV partners are pursuing the same targets as previously, including...-
Document
Published: 22 Jan 1919
-
Cootanoorina Hill. Data release made in lieu of submitting a partial surrender report at licence expiry/renewal : annual reports for the period 6/4/2010 to 5/4/2015.
No work took place on the subject licence area, located ~ 60 km south of Oodnadatta on the western side of the Peake and Denison Ranges, during its first four years of tenure. It had been taken up originally to explore for possible undercover roll...-
Document
-
Data release - as updated [made at SA Director of Mines' discretion] : Curdimurka. Annual reports for the period 4/9/2014 to 3/9/2018.
An area centred near Lake Phibbs, ~70 km west of Marree, which also abuts the southern edge of Lake Eyre South, is being explored for possible economic buried Olympic Dam type IOCG-U mineralisation that might exist within covered basement in a poorly...-
Document
Published: 03 Sep 1918
-
Peake and Denison Ranges. Progress reports and technical reports to licence expiry/full surrender, for the period 17/2/1969 to 4/5/1971.
An airborne magnetic/radiometric survey was flown over the licence in 1969. Three anomalies located near Peake Homestead Ruins and the Coppertop mine gave disappointing ground survey uranium responses from traverses made with a hand-held...-
Document
-
Olympic Dam operations. Environmental management programme annual report. 01/03/90 - 28/02/91.
Reports on monitoring of: - air and solid waste pollution; - drill pad rehabilitation; - meteorology, vegetation, flora, fauna and soil salinity; - mine ground water drainage; - artesian water drawdown at Wellfield A in the Great Artesian Basin;...-
Document
-
Olympic Dam operations. Wellfield A area. Production history and aquifer response for the period July, 1989 to June, 1990.
Data relating to work carried out, water production and aquifer response from the Wellfield A area in the Great Artesian Basin is presented.-
Document
Published: 01 Jan 1990