Bundulla. Progress reports for the period 24/5/79 to 19/10/82.
Airborne and ground magnetic surveys were conducted in the Bundulla area of the Nullarbor Plain (SA), prior to drilling a prominent circular aeromagnetic feature. 2 percussion/rotary mud holes, each drilled to TD 369.5 m, penetrated crystalline...-
Document
-
Bunabie Rockhole, Hughes and Nullarbor Plain. Progress reports and final report to licences' joint full surrender, for the period 20/10/1980 to 19/10/1982.
Roxby Downs - type base metal deposits, potentially associated with linear and discrete magnetic anomalies of unknown origin in the basement, were the prime targets of exploration in an area extending between Koonalda and Hughes, adjacent to the SA/WA...-
Document
-
North Fowlers Bay - Chundaria. Annual reports and progress reports for the periods 15/9/1993 to 14/9/1998, and 28/10/1998 to 12/3/1999.
North Ltd's Barton Project commenced in 1990 across a number of licences progressively taken out over the western Gawler Craton, which eventually came to include EL 1865. Initial exploration for heavy mineral sand in the Barton-Ooldea area, 100-200...-
Document
Published: 06 May 1999
-
Review of Mineral exploration activity, 2003 and 2004.
2003 activity: Expenditure by companies on mineral exploration licences in South Australia for calendar year 2003 was $37.0 million, a slight increase on the $35.7 million spent in 2002. Mineral exploration drilling metreage, a key indicator of...-
Document
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 3 partnership DPY3-57, Streaky Bay area gravity highs and lows - IOCG and sedimentary uranium mineral prospects. Project final report.
As part of the PACE Initiative Year 3 subsidised drilling programmes, Minotaur Exploration proposed exploring a large tenement package in the Streaky Bay area simultaneously for Prominent Hill style iron oxide copper gold (IOCG) and palaeochannel...-
Document
-
Pyramid Bore. Annual reports and final report to licence full surrender, for the period 8/7/2005 to 5/1/2010.
An area located approximately 10 km north of Glendambo has been explored for possible economic buried uranium deposits which might be indicated by aerial radiometric anomalies associated with playa lakes in the region, since these latter mark zones of...-
Document
Published: 20 May 1910
-
Kottata Well and Broadacres (part of the Yaninee Project). Final report at licences' joint full surrender, for the period 29/9/2003 to 5/6/2008.
Mineral exploration in the Streaky Bay district has addressed the potential for finding Prominent Hill - style Proterozoic IOCG deposits, Phanerozoic iron-depleted gold mineralisation, and Tertiary palaeochannel - hosted sedimentary uranium...-
Document
-
Childara Well. Annual reports and final report to licence expiry/full surrender, for the period 19/2/2004 to 18/2/2009.
An area lying along the south-western margin of the Gawler Ranges has been explored by Minotaur Resources to assess the economic iron oxide - associated copper-gold mineralisation (IOCG) potential of near-coincident gravity and magnetic anomalies that...-
Document
Published: 23 Mar 1909
-
Tallaringa and Mount Igy (the Tallaringa JV Project). Joint annual reports to licences' joint full surrender, for the period 18/1/2009 to 6/2/2015.
During the 2009-2010 project joint reporting year, the following activities occurred: - the conduct of an Aboriginal heritage work area clearance survey in the northern part of EL 3485 Tallaringa by the Antakarinja Land Management Council Native...-
Document
-
Waddikee Rocks and Corrobinnie (part of the Eyre Peninsula Project). Joint second and sixth respectively partial surrenders report, for the overall period 17/10/1996 to 11/7/2016.
The stated exploration strategy for the Joint Venture's Eyre Peninsula Project tenements (that are still extant) is to explore predominantly for gold and copper, with uranium as a secondary focus. Regional programmes of calcrete geochemical sampling,...-
Document
-
Mount Igy. Annual reports submitted until the commencement of licence joint reporting for the Tallaringa JV ELs, for the period 18/1/2006 to 17/1/2009.
An area centred ~150 km WSW of Coober Pedy has been explored for possible buried economic sandstone-hosted secondary uranium deposits which might have formed within northeastwards-draining tributaries of the Tertiary Tallaringa Palaeochannel. Another,...-
Document
Published: 23 Apr 1909
-
The Eyre Peninsula Project, and in part the Corrobinnie Uranium Joint Venture. Joint annual reports for the period 29/12/2008 to 31/12/2013.
During the sixth year of the project, licensee Adelaide Resources did not do any exploration directed at gold or base metals that might possibly occur on the subject tenements. However, its joint venture partner Quasar Resources undertook significant...-
Document
Published: 05 Mar 1914
-
Wilkinson Lakes East. Annual reports plus final report to licence full surrender, for the period 3/5/2010 to 6/2/2015.
An area centred ~150 km west of Coober Pedy, that is located mostly north-west of and that also has a small part lying immediately south-east of the Karari Fault, a major crustal structure which has controlled deposition at the southern limit of the...-
Document
-
Kingoonya. Annual reports and final report to licence full surrender, for the period 27/11/2006 to 21/4/2015.
An area surrounding the township of Kingoonya and straddling the Trans Australia Railway line, that comprises six tenement sub-blocks,has been explored for possible economic occurrences of buried Tertiary roll-front style secondary uranium...-
Document
Published: 23 Apr 1915
-
Data release - as updated [made at SA Director of Mines' discretion] : Brimpton Lake. Annual reports for the period 9/2/2005 to 8/8/2018.
An area of the southern Gawler Craton, which is located on Eyre Peninsula east of Elliston, is continuing to be explored for possible economic buried Archaean to Proterozoic bedrock-hosted primary base and precious metal deposits of inferred...-
Document
-
Cootanoorina Hill. Data release made in lieu of submitting a partial surrender report at licence expiry/renewal : annual reports for the period 6/4/2010 to 5/4/2015.
No work took place on the subject licence area, located ~ 60 km south of Oodnadatta on the western side of the Peake and Denison Ranges, during its first four years of tenure. It had been taken up originally to explore for possible undercover roll...-
Document
-
Penong B area and Yumbarra (part of the Eucla Basin Project tenement Group 2). Joint final report at licences' joint expiry/full surrender, for the period 16/11/2012 to 15/11/2017.
Two adjoining areas located north of Koonibba were taken up to explore this part of the south-eastern Eucla Basin for possible buried economic marine placer deposits of heavy mineral sands (HM), because they were believed to contain shallow or exposed...-
Document
Published: 12 Sep 1917
-
Muckanippie. Fourth partial surrender report submitted at licence expiry/renewal, for the period 20/10/2005 to 23/2/2016.
EL 3438 Muckanippie is located in the northern Gawler Craton, on the western margin of the Gawler Range Volcanics Domain, and is centred approximately 60 km north-west of Tarcoola. The principal target within EL 3438 is possible economic occurrences...-
Document
Published: 30 Jan 1917
-
Fig Tree Corner, Ooldea South, Barton, Colona North, Ooldea Range and Pidinga (the Eucla Basin HMS Project tenement Group One). Joint annual reports for the period 1/3/2011 to 31/12/2015.
During the 2011-2012 joint reporting year, Iluka undertook drilling on ELs 3638, 3742 and 4544 with three aims: to extend the Typhoon HM deposit resource, to follow-up results of brownfields drilling at the Sonoran prospect, and to do further infill...-
Document
Published: 28 Feb 1916
-
Thurlga Ramp (part of the Eyre Peninsula Project, Corrobinnie Uranium JV and Thurlga JV periods). Data release : final report at licence expiry/full surrender, for the period 1/1/2013 to 3/5/2019.
During the report period, licensee Andromeda Metals did no on-ground exploration. During its agreed 3-year earn-in period, joint venturer Investigator Resources undertook the following work described herein: - acquisition of high resolution aerial...-
Document
Published: 19 Jul 1919