Mikkira (south-west of Port Lincoln). Progress reports to licence expiry/full surrender for the period 2/3/1981 to 27/10/1987.
Exploration for graphite primarily, and secondarily for BIF-associated massive base metal sulphides, in the area surrounding the historic Uley graphite mine situated 15 km west south-west of Port Lincoln, initially comprised an airborne reconnaissance...-
Document
Published: 30 Oct 1987
-
Carpie Puntha and Peterlumbo. Joint second partial surrender report, for the period 14/2/1989 to 13/2/1992. Plus: Carpie Puntha and Waddikee. Joint final report to licences' expiry/renewal, for the period 14/2/1989 to 24/6/1992.
TARGET: Possible commercial Menninnie Dam type stratabound or stratiform base metal deposits in the Cowell - Kimba - Buckleboo region. EXPLORATION: Field reconnaissance and rock chip geochemical sampling of prospective areas identified from...-
Document
-
Data release - as updated [made at SA Director of Mines' discretion] : Verran and Malbrom (the Verran Project, then the Arno Graphite Project). Joint annual reports plus annual report, for the period 29/1/2014 to 28/1/2019.
Two licence areas together covering the hinterland to Arno Bay and Port Gibbon on eastern Eyre Peninsula, and extending as far north-westwards as Rudall, are being explored for economic buried graphite deposits that may have formed in deformed high...-
Document
-
PACE Copper Discovery Drilling (drilling partnerships with DSD and industry): Year 9 partnership DPY9-11, Thurlga Ramp, northern edge of Cleve Domain, volcanic epithermal / hydrothermal replacement type precious metal prospects. Drilling final report.
A licence area, which lies adjacent on the west to Investigator Resources' Peterlumbo Hill EL 5368 containing the Paris silver deposit (where there is a currently inferred resource of 42 Moz @ 139 ppm Ag), is being explored under a joint venture with...-
Document
-
Woollinie. Progress reports and annual reports plus final report to licence full surrender, for the period 20/12/1991 to 20/11/1995.
Exploration for Broken Hill / Menninnie Dam type Pb-Zn, and later for iron oxide - associated Cu-Au, that was undertaken over an area located north of Kimba within and adjacent to the Pinkawillinie Conservation Park, comprised the acquisition during...-
Document
-
Data release [made at SA Director of Mines' discretion] : Cockabidnie. Annual reports for the period 25/5/2016 to 24/5/2019.
An area covering the northern end of the Campoona Syncline is being explored for possible economic buried graphite formed within Palaeoproterozic schistose rocks, which may exist as northern extensions to the Central Campoona graphite resource as well...-
Document
Published: 26 May 2018
-
Data release [made at SA Director of Mines' discretion] : Malbrom. First annual report submitted until the commencement of joint venture project joint reporting, for the period 5/4/2013 to 4/4/2014.
A licence composed of four separate small sub-blocks which generally lie ~90 to 120 km north-northeast of Port Lincoln is being explored primarily for extensions to known graphite-bearing horizons which may exist to the north and south of the...-
Document
Published: 29 May 2014
-
Data release - as updated [made at SA Director of Mines' discretion] : Middlecamp Hills. Annual reports for the period 30/6/2009 to 29/6/2019.
Two small areas have been taken up in the Cleve Uplands district to explore structurally interesting portions of the Lower and Upper Middleback Jaspilite stratigraphic units for possible economic buried copper, gold, manganese and iron ore...-
Document
Published: 06 Aug 2018
-
Lake Gilles (latterly part of the Northern Eyre Peninsula Project). Annual reports until the commencement of project licences' joint reporting, plus the final report, for the respective periods 13/2/2007 to 31/5/2010 and 1/6/2014 to 31/5/2015.
A licence area originally comprising three separate sub-blocks located along the northern and southern sides of the Lake Gilles Conservation Park has been explored by grant licensee Lincoln Minerals Ltd (LML) and its joint venture partner IronClad...-
Document
Published: 19 Jun 2015
-
The Northern Eyre Peninsula JV Project. Data release made in lieu of submitting a licence final report at the full surrender of EL 5170 Kimba Gap: Joint annual reports for the period 1/2/2013 to 9/2/2017.
During the Northern Eyre Peninsula Project (NEPP) 2013-2014 reporting year, exploration field work took place on two of the six project tenements. On EL 4884 Minbrie, a single 151 m deep vertical RC drillhole, BURC092, was completed in August 2013,...-
Document
Published: 25 Sep 2018
-
Data release - as updated [made at SA Director of Mines' discretion] : Lipson Cove. Annual reports for the period 29/9/2009 to 28/9/2014.
An area in the Cowell Hills centred ~20 km north of Tumby Bay on eastern Eyre Peninsula was taken up primarily to explore and evaluate known talc and graphite occurrences, but the grant licensee's initial review of previous exploration data revealed...-
Document
Published: 12 Dec 2014
-
Carpie Puntha and Peterlumbo (part of the Wilcherry Hill Joint Venture Project). Data release made at the third renewal / partial surrender of the latter licence: progress reports and annual reports for the period 14/2/1989 to 30/8/2003. [Index 1 of 2].
Two contiguous areas located south of the Gawler Ranges, between Buckleboo and Franklin Harbour, were taken up primarily to explore the Early Proterozoic metasedimentary sequence for possible Broken Hill type economic stratiform / hydrothermal base...-
Document
Published: 16 Oct 2003
-
Data release - as updated [made at SA Director of Mines’ discretion] : Verran. Annual reports submitted until the commencement of joint venture project joint reporting, for the period 29/1/2010 to 28/1/2014.
An area located in the Cowell Hills is being explored for possible economic buried iron ore deposits. The desired commodity is DSO (Direct Shipping Ore) haematite mineralisation similar to that of the Middleback Range iron deposits, where pods of...-
Document
Published: 23 May 2014
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 6 partnership DPY6-37 - Eurilla JV Project, north-central Eyre Peninsula - Jungle Dam Palaeoproterozoic hydrothermal vein-hosted primary uranium mineral prospects. Drilling final report.
In 2007, Lincoln Minerals discovered greenfields uranium mineralisation near Jungle Dam on its EL 3690, located about 45 km north-east of Kimba on the northern Eyre Peninsula. EL 3690 straddles a NNW-trending splay of the Kalinjala Shear Zone (~1720...-
Document
Published: 15 Aug 2011
-
Data release - as updated [made at SA Director of Mines’ discretion] : Carappee Hill. Annual reports for the period 20/2/2010 to 19/2/2019.
The continuation during 2010 of exploration of the Palaeoproterozoic bedrock in a small area located 60 km west-northwest of Cowell has mainly consisted of the conduct of three shallow drilling campaigns and the examination and analysis of downhole...-
Document
Published: 25 Feb 2019
-
Data release - as updated [made at SA Director of Mines' discretion] : Eurilla, Lake Gilles, Moseley Nobs and Uno (the Northern Eyre Peninsula Project). Joint annual reports for the period 1/6/2010 to 31/5/2018.
Four tenements, which all lie within a 60 km radius to the north of the township of Kimba, and are mostly located around Lake Gilles, are continuing to be explored by grant licensee Lincoln Minerals Ltd (LML) and its joint venture partner IronClad...-
Document
Published: 30 Jul 2018
-
Data release - as updated [made at SA Director of Mines' discretion] : Dutton River. Annual reports for the period 4/11/2009 to 3/11/2012.
An area located in the Lincoln Uplands of eastern Eyre Peninsula, immediately west of Port Neill, is being explored for possible economic shear-hosted polymetallic gold and base metal mineralisation that may be associated with the Kalinjala Mylonite...-
Document
Published: 06 Nov 2012