Cleve Central area. Progress and final reports to licence expiry for the period 7/6/1979 to 11/10/1985.
Exploration for Broken Hill or Aggeneys type Proterozoic stratiform base metal massive sulphides within the Hutchison Group in the Mount Shannan area, north of Cleve, has included the acquisition, processing and interpretation of airborne magnetic,...-
Document
-
Whyalla. Annual reports and final report to licence expiry/full surrender, for the period 12/6/2003 to 11/6/2008.
Evaluation of the perceived Olympic Dam style copper-gold and Stuart Shelf type stratabound copper potential of, respectively, the Proterozoic basement and the Adelaidean cover rocks in an area lying immediately to the west of the Cultana Inlier was...-
Document
Published: 01 Oct 1908
-
Commonwealth Hill, Perfection Well, Wirrida North, Nelson Bore and Ingomar (the Commonwealth Hill Joint Venture Project). Joint annual reports and final report to licences' respective expiry/renewal, for the period 6/10/1995 to 6/12/1998.
Exploration for Challenger - type primary gold deposits that may possibly have formed within buried Archaean basement rocks in the Commonwealth Hill area, which is the purpose of one of two joint venture agreements currently in force between Minotaur...-
Document
Published: 06 Jan 1999
-
Mount Ive. Annual and final reports to licence expiry/full surrender for the period 17/7/2006 to 16/7/2008.
Exploration for possible IOCG drilling targets within an area located 100 km north-northeast of Kyancutta, that abuts the southern shoreline of Lake Gairdner, initially involved planning for a regional gravity survey to be acquired across three of...-
Document
-
Tallaringa and Mount Igy (the Tallaringa JV Project). Joint annual reports to licences' joint full surrender, for the period 18/1/2009 to 6/2/2015.
During the 2009-2010 project joint reporting year, the following activities occurred: - the conduct of an Aboriginal heritage work area clearance survey in the northern part of EL 3485 Tallaringa by the Antakarinja Land Management Council Native...-
Document
-
PACE 2020 Discovery Drilling 2012 : Year 7 Drilling Partnership no. DPY7-21 - Uranium Equities Limited, Marla Project, Proterozoic basement magnetic and gravity anomaly IOCGU targets. Drilling project final report.
Uranium Equities, the licensee parent and operator of the seven Marla Project tenements, is exploring them with the aim of discovering economic iron oxide - associated copper–gold±uranium (IOCGU) deposits, that it considers may have given rise to a...-
Document
-
Data release [made at SA Director of Mines' discretion] : Bulgunnia (part of the Gawler JV Project). Annual reports for the period 19/11/1997 to 1/1/2013.
Within an area of the Wilgena and Christie Domains centred 40 km north of Tarcoola, exploration is continuing for Archaean to Proterozoic basement-hosted epithermal, hydrothermal and metamorphic type gold and base metal occurrences. Here an 841 square...-
Document
-
Data release [made at SA Director of Mines’ discretion] : Kapinnie (part of the Brimpton Lake Project). Annual reports for the period 17/9/2003 to 4/3/2010.
An area extending to the north of Kapinnie on western Eyre Peninsula area is being explored by grant licensee Anglo American and (since March 2003) its joint venture partner Lynch Mining, looking for possible buried economic Archaean volcanic or...-
Document
-
Nuckulla [Hill]. Information status at licence full surrender, for the period 4/2/2016 to 9/3/2017 : no work performed.
There is no abstract created for this record-
Document
-
Wipipippee Hill. First partial surrender report, for the period 3/5/2012 to 2/5/2016.
Two separate blocks of ground in the centre and the east of EL 4865, together comprising ~43% of the original area of the licence, have now been relinquished. To date, exploration work undertaken generally on the licence has focused on data...-
Document
-
Buckleboo (part of the Buckleboo Project). Combined first annual/final report at licence full surrender, for the period 7/1/2014 to 20/2/2015.
A very small area located ~25 km north-west of Kimba has been explored for possible economic buried base and precious metal mineralisation that may have formed within Archaean metasedimentary bedrock and be related to younger igneous intrusions....-
Document
-
Menninnie Dam (part of the Fleurieu - Menninnie Dam Exploration Joint Venture Project). Combined annual report for the 5-year period 24/9/2005 to 26/10/2010, plus annual reports for the period 27/10/2010 to 26/10/2012.
During the 5-year period 2005-2010, intensified exploration undertaken at Menninnie Dam was focussed on the discovery and delineation of structurally controlled hydrothermal Pb-Zn-Ag mineralisation. Carbonate-rich Hutchison Group metasediments forming...-
Document
-
Data release [made at SA Director of Mines’ discretion] : Menninnie Dam (part of the Fleurieu - Menninnie Dam Exploration Joint Venture Project). Annual reports for the period 24/9/2001 to 23/9/2005.
The buried Menninnie Dam zinc-lead(-silver-copper) deposit, located approximately 55 km north of Kimba on northern Eyre Peninsula, and sitting adjacent to the south-eastern margin of the Gawler Ranges, is being evaluated for its future commercial...-
Document
-
Data release - as updated [made at SA Director of Mines’ discretion] : Nonning (latterly part of Terramin's Menninnie Zinc Project). Annual reports for the period 30/3/2006 to 30/11/2012.
An area centred ~70 km north of Kimba, which also lies about 7 km north of the Menninnie Dam lead-zinc-silver deposit, was taken up to explore for possible buried economic volcanic epithermal/hydrothermal Mesoproterozoic Fe-rich Cu-Au mineralisation...-
Document
-
Reid Lookout and Siam [Station]. Information status at licences' joint full surrender, for the period 21/3/2016 to 13/7/2017: no work performed.
There is no abstract created for this record-
Document
-
Fairview [Homestead]. Information status at licence full surrender, for the period 19/1/2016 to 13/4/2017 : no work performed.
There is no abstract created for this record-
Document
-
Data release - as updated [made at SA Director of Mines’ discretion] : Mount Kolendo [not "Taringa"] (part of the Menninnie Zinc Project). Annual reports for the period 21/2/2011 to 20/2/2013.
An area located adjacent to the southern margin of the Gawler Ranges, that includes some exposures of Mesoproterozoic Gawler Range Volcanics (GRV), and which at its southern boundary lies approximately 15 km north-east of the Menninnie Dam Pb-Zn-Ag...-
Document
-
[Mount] Fairview. Information status at licence full surrender, for the period 17/2/2016 to 9/3/2017 : no work performed.
There is no abstract created for this record-
Document
-
Glyde [Hill]. Information status at licence full surrender, for the period 4/2/2016 to 9/3/2017 : no work performed.
There is no abstract created for this record-
Document
-
Wipipippee Hill. Final report at licence expiry/full surrender, for the period 3/5/2012 to 2/5/2019.
The subject tenement, one of six that have recently been fully surrendered by licensee Menninnie Metals Pty Ltd, was acquired to explore for extensions/repeats of the mineralising system that hosts the Menninnie Dam and Viper deposits, and to...-
Document