-
Commonwealth Hill, Perfection Well and Wirrida. Six-monthly progress, plus combined annual and final reports, to licence expiry/full surrender, for the period 7/12/1993 to 18/7/2006.
Exploration for possible economic deposits of epithermal/hydrothermal gold, plus precious metals and base metals, which might have formed in poorly outcropping Archaean and Proterozoic basement, commenced with a detailed interpretation of SAEI imaged...-
Document
Published: 10 Sep 1906
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 2 partnership DPY2-17, Mount Moulden and Mount Harcus mineral prospects. Project final report.
As part of the PACE Year 2 collaboration between PIRSA and the minerals industry, PepinNini Minerals proposed and was granted part subsidy funding for an extensive drilling programme in the western APY Aboriginal Lands of South Australia, to examine...-
Document
Published: 16 Jun 1906
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 1 partnership DPY1-32, Ki Ki intrusion mafic/ultramafic - hosted mineral prospects. Project final report.
To further investigate the Cu-Ni-PGE mineral sulphide potential of a known buried mafic / ultramafic layered igneous intrusive complex situated near Ki Ki in the upper South-East, the licensee of EL 3295 sought PACE Initiative funding to complete two...-
Document
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 5 partnership DPY5-18. Western Musgrave Province - Mount Caroline area magmatic nickel-copper-PGE and stratiform or epithermal / hydrothermal base metal mineral prospects. Final report.
In late 2008 PepinNini Minerals completed a stratigraphic drilling programme in the western Musgrave Province as an approved PACE Initiative Year 5 collaborative project with PIRSA. The programme was designed to investigate the Mount Caroline...-
Document
Published: 20 Jan 1909
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 5 partnership DPY5-19. White Hill igneous complex Proterozoic magmatic PGE-Ni-Cu mineral prospects. Project final report.
Following a review of historic exploration data for the Mount Woods Inlier, OZ Minerals decided that the White Hill igneous complex, located 6 km north-west of the Prominent Hill mining lease, is comprised of mafic and ultramafic cumulate rocks having...-
Document
-
PACE 2020 Discovery Drilling 2012: Year 7 Drilling Partnership DPY7-15 - NiCul Minerals Limited, Central Musgrave Project, Woodroffe and Cooperinna areas Proterozoic basement magmatic Ni-Cu-Co-PGE sulphide mineralisation targets. Drilling final report.
Early in 2012, explorer NiCul Minerals Limited (NiCul) sought PACE Initiative funding from the South Australian Government to help it undertake a programme of stratigraphic and targeted mineral exploration drilling within EL 3931 Woodroffe and EL 4587...-
Document
-
Data release [made at SA Director of Mines' discretion] : Mount Davies (part of the Central Giles Nickel Project). Annual reports for the period 4/3/1999 to 23/9/2009.
A licence area located in South Australia's Far North-west Aboriginal Lands, and centred approximately 20 km to the south-east of the Surveyor Generals Corner at the borders of Western Australia, South Australia and the Northern Territory, has been...-
Document
-
Koppio. Annual reports and final report to licence full surrender, for the period 6/1/1995 to 7/4/1997.
Geochemical sampling of ferruginous lag, stream sediments, BLEG soils, and rock chips, targeted possible Thompson Belt - type nickel-copper and precious metal mineralisation hosted by Lower Proterozoic Hutchison Group metasediments in an area 40 km...-
Document
-
Brownlow (part of the Padthaway and Black Hills Joint Venture Projects). Annual reports and first partial surrender report to licence expiry/renewal, for the period 26/8/1998 to 25/8/2002.
The area of EL 2544, centred 90 km north-east from Adelaide, was considered to be prospective for porphyry/skarn type and iron oxide - associated copper-gold (IOCG) systems related to high level intrusive igneous plutons. Initial exploration...-
Document
Published: 27 Jan 1903
-
Great Victoria Desert - Alinya area (part of the Nawa Domain Project). Annual reports plus final report to licence expiry/full surrender, for the period 25/6/2013 to 24/6/2016.
An area centred ~145 km west-northwest of Coober Pedy, and extending northwards for ~40 km from near the Anne Beadell Highway, has been explored for possible buried economic mineralisation that may occur in basement rocks of the Gawler Craton and the...-
Document
Published: 05 Oct 1916
-
Fig Tree Corner. Second partial surrender report, for the period 10/3/2005 to 4/4/2019.
Most of a sizeable licence area located on SA's Far West Coast, which formerly extended for 10 to 90 km inland from the vicinity of Bookabie, has now been partially relinquished owing to its perceived diminished prospectivity for Tertiary marine...-
Document
Published: 12 Apr 1919
-
Poondinga. Third partial surrender report, for the period 27/10/2004 to 4/4/2019.
309.6 square km or ~18.77% of the pre-existing area of EL 5564 Poondinga was partially relinquished on 19/2/2019 because in the licensee's view this south-eastern portion of the licence are does not appear to exhibit the geological features required...-
Document
Published: 12 Apr 1919
-
Tallaringa South-east - National Trig Point area (part of the Nawa Domain Project). First partial surrender report at licence expiry/renewal, for the period 29/11/2012 to 28/11/2017.
Portions of a tenement located within the Nawa Domain basement rocks subcrop region of the northern Gawler Craton have recently been relinquished by Woomera Exploration (WEX) in order to meet exploration expenditure compliance conditions of its...-
Document
Published: 08 Mar 1918
-
Mount Woodward. Annual reports plus combined 5-year annual/final report to licence expiry/full surrender, for the period 5/3/2001 to 6/10/2012.
There is no abstract created for this record-
Document
-
PACE 2020 Initiative : PACE Targeting, Year 1 partnership no. 19 - Musgrave Project area, SkyTEM helicopter-borne electromagnetic survey. Project PT1-19 final report.
To assist with exploration for possible buried magmatic massive copper-nickel sulphide deposits in Proterozoic Giles Complex ultramafic intrusions within the central Musgrave Province, and to simultaneously provide useful geophysical data for mapping...-
Document
-
Marla (part of the Nawa Domain Project). Annual report and final report to licence expiry/full surrender, for the period 25/6/2013 to 24/6/2015.
No work - reports only contain comments about the Project area's perceived prospectivity.-
Document
Published: 07 Sep 1915
-
Aston Hill (part of the Nawa Domain Project). Annual report and final report to licence surrender, for the period 25/6/2013 to 4/6/2015.
No work - reports only contain comments about the Project area's perceived prospectivity.-
Document
Published: 07 Sep 1915
-
Data release [made at SA Director of Mines’ discretion] : Ceduna. Licence-specific annual reports submitted until the commencement of project joint reporting, for the period 28/11/2001 to 18/4/2008.
EL 2870 Ceduna covers 1390 square km located adjacent to the coast near Ceduna on north-western Eyre Peninsula. Minotaur believed that the area, which lies relatively close to the continental Fowler Suture Zone, was prospective for Proterozoic...-
Document
Published: 12 Jun 1908
-
Tallaringa North - Manya Bore area (part of the Nawa Domain Project). Annual report and final report to licence surrender, for the period 25/6/2013 to 4/6/2015.
No work - reports only contain comments about the Project area's perceived prospectivity.-
Document
Published: 07 Sep 1915
-
Elliston. First partial surrender report, for the period 20/2/1996 to 19/2/1998.
Three of nine untested magnetic anomalies, identified by the reprocessing of company aeromagnetic data acquired over an area east of Elliston, were drilled as part of a regional search for buried diamondiferous kimberlites. The resulting three...-
Document