-
South Australian geological field [guides] and excursion guides.
There is no abstract created for this record-
Document
-
Lake Yantawena (West). Progress and final reports for the period 26/11/1970 to 25/11/1972.
Acquisition and interpretation of an airborne scintillation spectrometer survey, and the unhindered drilling and gamma and electric logging of 16 rotary open holes (total 3242 feet), were undertaken. Lower Tertiary non-marine palaeochannel sand...-
Document
Published: 09 Feb 1973
-
Lake Frome. Progress reports to licence expiry/full surrender, for the period 18/12/1979 to 17/12/1981.
Ongoing exploration for possible Tertiary sediment-hosted roll front uranium occurrences in an area abutting western Lake Frome has consisted of the drilling of 7 open rotary holes for a total of 1384 m, to test ground midway between previously...-
Document
-
Lake Callabonna. Progress and final reports for the period 11/6/1971 to 10/6/1972.
Ongoing exploration for economic sedimentary uranium deposits in the Lake Callabonna region involved further reconnaissance rotary mud drilling and well geophysical logging (9 holes, total 3195 feet) to evaluate radiometric anomalies found in...-
Document
-
Kalabity. Progress reports to licence expiry/renewal for the period 15/3/1971 to 17/6/1973, plus related technical reports about in situ leach uranium mining methods in Wyoming.
The recently completed drilling of 189 open rotary holes (total penetration 22,427 m), plus the redrilling and geophysical re-logging by joint venturer Minad-Teton of 19 previously completed Carpentaria Exploration Co. uranium exploration holes (for a...-
Document
Published: 02 Jan 1974
-
RB 81/00087 Review of the geology and hydrocarbon exploration history of the Duntroon Basin gazetted area, offshore South Australia.
The Duntroon Basin is an ESE-trending Mesozoic to Tertiary sedimentary embayment in the continental shelf, located SE of the Great Australian Bight Basin and west of Kangaroo Island. The report includes a discussion of the stratigraphy based on...-
Document
Published: 01 Oct 1981
-
RB 98/00021 Review of open file company exploration data from 1992 to mid-1997, Olary Domain, CURNAMONA 1:250 000 map sheet, South Australia.
This report comprises Open file company data, released since the previous MESA review (Yates and Randell, 1994) of the CURNAMONA 1:250 000 map sheet, includes exploration for base and precious metals (especially stratiform/stratabound Broken...-
Document
Published: 01 Jul 1997
-
Regolith mapping on the Mingary 1:100,000 map area, Curnamona Province.
There is no abstract created for this record-
Document
-
Lake Arthur West. Final report at licence surrender for the period 29/8/2006 to 3/4/2009.
An area located 55 km east of Marree was explored for possible sedimentary uranium deposits hosted by Tertiary piedmont sediments shed from granitic basement outcrops of the northern Mount Babbage Inlier. A study of available regolith stratigraphic...-
Document
Published: 06 Apr 1909
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 5 partnership DPY5-26 - south-western Cooper Basin district - Tertiary sedimentary uranium mineral prospects. Project interim and final reports.
As a PACE Initiative Year 5 drilling project that was approved for part-subsidy by PIRSA, a 16,777 m shallow rotary mud drilling programme was undertaken during the period August to November 2008 within five of the Sturt Joint Venture exploration...-
Document
Published: 31 Jan 1909
-
Neales River (part of Lake Eyre West Project). Annual reports to licence expiry/full surrender for the period 5/12/2005 to 4/12/2007.
An area of ground located 55 km due west of the northern end of Lake Eyre North was taken up to explore for possible economic uranium mineralisation formed within either Mesozoic to Recent cover rocks or the underlying Proterozoic crystalline...-
Document
Published: 08 Jan 1908
-
Notes on the genesis of uranium deposits in the Yarramba Channel [on] EL 85 South Eagle and EL 98 Yarramba.
It is proposed that the buried Tertiary Yarramba Palaeochannel feature hosting the sedimentary uranium mineralisation was incised into Cretaceous and Precambrian basement rocks. Within the channel, quartzose sands and abundant detrital organic matter...-
Document
Published: 02 Jan 1974
-
Mundaerno South. Annual reports plus final report to licence expiry/full surrender, for the period 23/7/2007 to 22/7/2014.
A small area centred ~33 km north-west of Cockburn and ~26 km south-southeast of the Honeymoon deposit has been explored for possible buried, calcrete hosted secondary uranium deposits that may have formed in Quaternary valley fill sediments, and also...-
Document
Published: 20 Feb 1914
-
Lake Arthur East, Lake Arthur West and Lake Arthur (the Lake Surprise Project and the Mumpie Project). Data release made in lieu of submitting partial surrender reports : annual and joint annual reports for the period 29/8/2006 to 28/8/2014.
A wide basinal area located east of Marree and bordering the northern Willouran Ranges is being explored afresh for sedimentary uranium occurrences in response to market conditions and the demonstrated prospectivity of the local cover rocks, which...-
Document
Published: 30 Oct 1914
-
Yarramba. Annual reports submitted until the commencement of licences' joint reporting on the South Eagle / Honeymoon Project, for the period 10/4/2000 to 26/8/2009. [ Index Part 1 of 2 ].
Southern Cross Resources Australia Pty Ltd (Southern Cross) purchased Rio Tinto Exploration Limited’s share of the Northern Olary Joint Venture, including its interest in the subject EL 2310 Yarramba, in November 2000. Southern Cross has held the...-
Document
-
Data release - as updated [made at SA Director of Mines’ discretion] : Ethiudna. Annual reports to licence expiry/renewal, for the period 22/2/2004 to 22/2/2015.
An area centred ~50 km north-west of Olary is continuing to be explored for possible buried economic Prominent Hill or Olympic Dam type iron oxide associated copper-gold (IOCG) breccia style mineralisation. The area is considered highly prospective...-
Document
-
Data release made at renewal of the Sturt Joint Venture Project ELs 4062 through 4090, in lieu of submitting a joint partial surrender report for them : joint annual reports, for the period 25/2/2008 to 24/2/2013.
A very large area of the remote far north-east of the State was taken up early in 2008 by the unlisted Thorne-Clarke family company, to explore for sediment-hosted secondary uranium mineralisation of the type found in intracratonic sedimentary basins...-
Document
-
Data release - as updated : Security Dam. Annual reports plus final report to licence expiry/full surrender, for the period 27/8/2007 to 26/8/2017.
A small licence area located ~30 km north of Cockburn has been being explored for possible economic shallowly buried sedimentary roll front style uranium mineralisation that may have formed within inferred Tertiary fluvial channel sands of the...-
Document
Published: 10 Oct 1917
-
Davis Hill and Mount Wells (the Lake Gregory Project). Annual reports, joint annual reports and final report to licences' joint expiry/full surrender, for the period 5/11/2007 to 4/11/2012.
The two Lake Gregory project licences were located between the Birdsville Track and Lake Gregory, approximately 100 km north-northeast of Marree, and to the north of uranium exploration tenements held by Adavale Minerals. Regalpoint selected these...-
Document
Published: 03 Dec 1912
-
Data release - as updated [made at SA Director of Mines’ discretion] : Paralana Creek (part of the Beverley Project). Annual reports for the period 29/9/2009 to 15/11/2015.
Work undertaken on EL 4378 during the 2009-2010 reporting year included the drilling of 478 vertical rotary mud holes totalling 132,960 m, and core drilling totalling 4117 m performed in 16 of these holes for stratigraphic unit / resource...-
Document
Published: 24 Dec 1915