Blanchewater Hill. Progress and final reports for the period 11/8/80 to 10/8/82.
Drilling of two percussion holes (aggregate 400 metres) near Yerila, south of Lake Blanche, failed to give encouragement to the search for possible Permian coal and Tertiary uranium in the southern Eromanga Basin / Lake Blanche Lineament uplift area...-
Document
-
South Eagle [part of a joint licence area with Kalabity]. Uranium exploration progress and technical reports to licence expiry/renewal, for the period 15/5/1974 to 14/2/1976.
During the EL 132 tenure, work has consisted of a mineability evaluation of the Honeymoon uranium deposit, plus additional U exploration over the South Eagle farmout. Initially, 5 rotary holes (total 594.9 m) were drilled to the north of the...-
Document
-
Preliminary evaluation of in situ leaching on MTA [Minad-Teton Australia's] uranium deposits in the Lake Frome area, SA.
In-situ leaching of a uranium orebody can only be successful if the deposit meets a number of essential criteria. These criteria are: 1. The ore occurs in a generally porous and permeable horizontal bed underlain and overlain by impermeable strata;...-
Document
-
Lake Carnanto. Progress reports and final report to licence full surrender, for the period 30/11/1978 to 11/2/1983.
The south-eastern Lake Frome Embayment in the vicinity of Quinyambie Station was explored for Upper and Lower Tertiary 'blanket' or 'roll front' type sedimentary uranium, via the drilling of 75 open vertical rotary mud holes with a total penetration...-
Document
-
Frome Downs. Progress reports and partial relinquishment reports to licence expiry/renewal, for the period 20/6/1978 to 14/9/1982.
153 rotary mud open holes (total 19,689 m) and 11 cored holes (total 1384 m) have been drilled during the reporting period to evaluate the Goulds Dam uranium deposit and to further explore the region to its north and south for sedimentary uranium...-
Document
-
Mulyungarie. Progress reports to licence expiry/renewal for the period 13/5/1972 to 12/5/1973.
Ongoing exploration for possible economic sandstone-type uranium deposits formed in Tertiary palaeochannels in the Yarramba area, 50 km north-west of Cockburn, has included further open hole rotary drilling and downhole geophysical logging (176 holes...-
Document
-
Continuous solvent extraction studies.
Work carried out at Amdel and at the Colorado School of Mines' Research Institute has indicated that both a two solvent system (EHPA and TBP or DBBP) and a three solvent system (EHPA, DBBP and Alamine 336) of cationic exchangers are satisfactory for...-
Document
-
Clayton, Cooryanna and Lake Eyre (part of the Mount Flint Project). Combined first annual/final report at licences' joint full surrender, for the period 26/3/2008 to 25/3/2009.
Exploration conduced over three semi-adjacent small licence areas located 50-75 km north-east, north and north-west of Marree targeted possible near-surface sedimentary uranium deposits in sandstone palaeochannels, and also sedimentary phosphate rock...-
Document
Published: 01 May 1909
-
Beverley Uranium Project - Environmental Impact Statement, June 1998, and related reports.
There is no abstract created for this record-
Document
-
SADM/Amdel Project MP 1/1/172: In situ leaching of uranium (Honeymoon deposit, Frome Embayment). [Results of analytical, mineralogical and metallurgical testwork performed on diamond drill core samples]. Progress reports 1-6, May 1975 to November 1976.
At the request of Mines Administration and of the South Australian Mines Department, Amdel has undertaken a project designed to obtain data on the in situ leaching potential of the uranium ore in the Honeymoon deposit, located in the Lake Frome region...-
Document
Published: 05 Nov 1976
-
Notes on the genesis of uranium deposits in the Yarramba Channel [on] EL 85 South Eagle and EL 98 Yarramba.
It is proposed that the buried Tertiary Yarramba Palaeochannel feature hosting the sedimentary uranium mineralisation was incised into Cretaceous and Precambrian basement rocks. Within the channel, quartzose sands and abundant detrital organic matter...-
Document
Published: 02 Jan 1974
-
Lake Arthur East, Lake Arthur West and Lake Arthur (the Lake Surprise Project and the Mumpie Project). Data release made in lieu of submitting partial surrender reports : annual and joint annual reports for the period 29/8/2006 to 28/8/2014.
A wide basinal area located east of Marree and bordering the northern Willouran Ranges is being explored afresh for sedimentary uranium occurrences in response to market conditions and the demonstrated prospectivity of the local cover rocks, which...-
Document
Published: 30 Oct 1914
-
Data release - as updated [made at SA Director of Mines’ discretion] : Ethiudna. Annual reports to licence expiry/renewal, for the period 22/2/2004 to 22/2/2015.
An area centred ~50 km north-west of Olary is continuing to be explored for possible buried economic Prominent Hill or Olympic Dam type iron oxide associated copper-gold (IOCG) breccia style mineralisation. The area is considered highly prospective...-
Document
-
Davis Hill and Mount Wells (the Lake Gregory Project). Annual reports, joint annual reports and final report to licences' joint expiry/full surrender, for the period 5/11/2007 to 4/11/2012.
The two Lake Gregory project licences were located between the Birdsville Track and Lake Gregory, approximately 100 km north-northeast of Marree, and to the north of uranium exploration tenements held by Adavale Minerals. Regalpoint selected these...-
Document
Published: 03 Dec 1912
-
Data release - as updated [made at SA Director of Mines’ discretion] : Paralana Creek (part of the Beverley Project). Annual reports for the period 29/9/2009 to 15/11/2015.
Work undertaken on EL 4378 during the 2009-2010 reporting year included the drilling of 478 vertical rotary mud holes totalling 132,960 m, and core drilling totalling 4117 m performed in 16 of these holes for stratigraphic unit / resource...-
Document
Published: 24 Dec 1915
-
Frome Downs Homestead. Progress and technical reports to licence expiry/renewal, for the period 1/1/1969 to 31/12/1970.
Reconnaissance shallow stratigraphic drilling with subsequent borehole geophysical electric and radioactivity logging in the south-western Frome Embayment (21 rotary mud partly cored holes, total 8841 feet), over areas lying adjacent to outcropping...-
Document
Published: 31 Dec 1970
-
Summary report on Honeymoon assessment programme (Phase 1), Honeymoon uranium deposit, South Australia.
This report summarises results of a rotary drilling and coring programme undertaken between 21/10/1978 and 16/2/1979 at the Honeymoon uranium deposit. 99 open plug holes totalling 12,452.7 m and 16 core holes totalling 1894 m were drilled in a...-
Document
-
Lake Frome [part of the Paralana Plains Uranium Project joint venture area]. Progress reports and technical reports to licence surrender/re-issue over a different area, for the period 22/4/1971 to 21/4/1973.
Exploration on SML 564 has consisted of a continuation of deep rotary mud open hole, plug and core drilling plus washing-out of existing, older Petromin "P...w" series drillholes to allow new generation downhole geophysical logging, aimed at further...-
Document
-
Honeymoon Project - pilot wellfield drilling, January-March 1982.
Drilling was undertaken at the Honeymoon deposit, as allowed for under Miscellaneous Purposes Leases 14 and 15 and Retention Leases 10, 11 and 12, located within EL 597. This drilling was carried out as part of the construction of the 6 litre/second...-
Document
-
Honeymoon uranium : a summary of the proposed in-situ leach mining operation.
This report discusses technical aspects of the Honeymoon uranium deposit and the proposed in-situ leach mining method intended for extracting about 3000 tonnes of contained U3O8. Economic forecasts and mine development plans are presented as a way of...-