-
Bundulla. Progress reports for the period 24/5/79 to 19/10/82.
Airborne and ground magnetic surveys were conducted in the Bundulla area of the Nullarbor Plain (SA), prior to drilling a prominent circular aeromagnetic feature. 2 percussion/rotary mud holes, each drilled to TD 369.5 m, penetrated crystalline...-
Document
-
Hawks Nest. Progress reports and final report to licence full surrender, for the period 20/2/1980 to 29/12/1982.
An area 100 km north of Kingoonya which exhibits a strong regional gravity high and other, intersecting pronounced crustal geophysical features was acquired to search for an Olympic Dam type of base/precious metals deposit. Semi-detailed and detailed...-
Document
-
Cleve Central area. Progress and final reports to licence expiry for the period 7/6/1979 to 11/10/1985.
Exploration for Broken Hill or Aggeneys type Proterozoic stratiform base metal massive sulphides within the Hutchison Group in the Mount Shannan area, north of Cleve, has included the acquisition, processing and interpretation of airborne magnetic,...-
Document
-
The MIM-Peko Stuart Shelf Joint Venture Project. Progress reports to licences' joint full surrender and their re-issue as a single replacement tenement, for the period 15/2/1983 to 20/10/1989.
Exploration for Olympic Dam-style Cu-Au-U mineralisation, undertaken over areas to the south-east of Arcoona Homestead and in the vicinity of Woomera township, has comprised numerous reconnaissance and then detailed gravity, ground magnetic and CSAMT...-
Document
-
Emmie Bluff. Progress reports to licence expiry/full surrender, for the period 28/10/1978 to 11/2/1983.
Ongoing exploration for Olympic Dam-style Cu-Au-U mineralisation, over an area centred ~15 km south-east of Arcoona Homestead, during this period comprised 3D geophysical modelling of possible source geometries for, and RC drilling (10 holes, total...-
Document
-
Mount Allalone. Progress and annual reports for the period 14/6/89 to 31/7/95.
Base metal exploration of two lead-zinc mineralized areas previously discovered by Billiton and WMC within Hutchison Group metasediments near Mt Allalone, northwest of Buckleboo on central Eyre Peninsula, comprised ground magnetic and EM surveys, RAB...-
Document
Published: 02 Nov 1995
-
Archaean Metabasic Diamond Drilling Project.
The Archaean Metabasic Diamond Drilling Project was undertaken by SADME Regional Geology Branch (part of the Geological Survey of South Australia) in two locations within the north-western Gawler Craton. Metasediments in this region include banded...-
Document
-
RB 45/00118 Final report on iron ore prospecting, Corunna area, Iron Knob district.
In an area of limited basement outcrop located between 2 and 5 miles north-northwest of Iron Knob township, the Department's surface traverse channel sampling (969'), percussion boring (643’) and diamond drilling (1270’) tested a low grade...-
Document
Published: 04 Dec 1957
-
RB 94/00019 BARTON Bedrock Drilling Project, 1993.
Between June and December 1993, 184 vertical RC stratigraphic drillholes totalling 10,126.2 m (average hole depth 55 m) were drilled by Mines and Energy South Australia at 2 km spacing along roadsides traversing much of the BARTON 1:250k map sheet...-
Document
Published: 01 Jun 1994
-
RB 93/00004 Tarcoola - Tallaringa bedrock drilling 1991. Summary.
Archaean and Early and Middle Proterozoic rocks of the north-western Gawler Craton have features which suggest good prospectivity for base metals, precious metals and other commodities. However, outcrop is poor and there has been relatively little...-
Document
Published: 01 Feb 1993
-
RB 97/00012 South Australian Steel and Energy Project. Coober Pedy iron ore investigation. Review of previous company exploration on the BILLA KALINA and COOBER PEDY 1:250 000 map sheets.
This report is a summary of company exploration of the Coober Pedy Ridge and Mount Woods Inlier, northern Gawler Craton, for the period until 1993, being information extracted from data on open file with the emphasis on data referring to the iron ore...-
Document
Published: 01 Feb 1997
-
RB 97/00009 South Australian Steel and Energy Project. Coober Pedy iron ore investigation. Peculiar Knob prospect.
As part of the South Australian Steel and Energy Project, MESA has targeted significant aeromagnetic anomalies in the search for a possible iron ore resource. At Peculiar Knob prospect, previous company exploratory drilling in 1985 of such a magnetic...-
Document
Published: 01 Feb 1997
-
RB 92/00039 Kingoonya bedrock drilling 1991.
36 reverse circulation drillholes totalling 1448 m (average depth 40.2 m) were drilled to determine the bedrock geology and geochemistry below sedimentary cover, in selected locations on the KINGOONYA 1:250,000 mapsheet area that had been recommended...-
Document
Published: 01 May 1992
-
RB 96/00024 Gawler Ranges drilling report 1994.
The Mesoproterozoic Gawler Range Volcanics - Hiltaba Granite Suite - related Olympic Dam style Cu-U-Au mineralisation, and Menninnie Dam replacement style Pb-Zn-Ag mineralisation, have served to raise the prospectivity of rocks in and underlying the...-
Document
Published: 12 Sep 1996
-
Port Broughton, Redhill and Mount Remarkable - Port Augusta areas (part of the Moonta North Project ELs combined reporting group). Annual reports and joint final report at licences' surrender, for the period 19/4/2002 to 22/5/2006.
Economic deposits of iron-oxide associated copper-gold mineralisation of the Moonta-Wallaroo or Olympic Dam style, hosted in Palaeoproterozoic basement rocks of the Moonta Sub-domain, were targeted by exploration in three now surrendered licences,...-
Document
-
Wynbring [Siding]. Data release made in lieu of submitting a first partial surrender report upon licence expiry/renewal : annual reports for the period 30/8/2004 to 29/8/2009.
An area located approximately 160 km north-northwest of Ceduna is being explored for possible economic nickel-copper-platinum group metal magmatic mineral deposits, which may have formed within Archaean to Proterozoic basement rocks in a geological...-
Document
-
Porter Hill. Annual reports for the period 26/8/1998 to 26/5/2000 (the commencement of the Lake Torrens Project joint reporting period) : part of a data release made on 31/12/2006 upon a subsequent partial surrender.
Following the detection in late 1997, by reconnaissance mobile metal ion partial leach analytical methods, of anomalous base and precious metal concentrations in the soil above several low amplitude magnetic anomalies on Tasman Resources' EL 2340, the...-
Document
Published: 25 Oct 1999
-
Mabel Creek. Annual reports submitted until the commencement of joint licence reporting on the Mabel Creek JV Project tenements, for the period 20/12/1999 to 23/3/2006.
Exploration currently underway for possible economic buried iron oxide - associated copper-gold (IOCG) mineralisation within Proterozoic basement on the Mabel Creek High, in one of two joint venture group project licence areas located approximately 50...-
Document
-
Roxby Hill. Annual and final reports to licence surrender for the period 6/2/2006 to 13/11/2008.
In a search for possible economic iron oxide - associated copper-gold mineralisation buried under deep cover to the south-west of the Olympic Dam deposit, a semi-detailed gravity survey consisting of 302 stations was read at 800 m intervals on 1.6 km...-
Document
Published: 09 Mar 1909
-
Calca and Poochera (the Streaky Bay Project). Data release made in lieu of submitting a first partial relinquishment report : joint annual reports for the period 22/10/2001 to 13/2/2005.
A multipart licence project area located approximately 100-150 km south-east of Ceduna is being targeted for possible Voiseys Bay type nickel, copper, cobalt and platinum group metal deposits within mafic to ultramafic basement rocks buried beneath...-
Document