-
The MIM-Peko Stuart Shelf Joint Venture Project. Progress reports to licences' joint full surrender and their re-issue as a single replacement tenement, for the period 15/2/1983 to 20/10/1989.
Exploration for Olympic Dam-style Cu-Au-U mineralisation, undertaken over areas to the south-east of Arcoona Homestead and in the vicinity of Woomera township, has comprised numerous reconnaissance and then detailed gravity, ground magnetic and CSAMT...-
Document
-
Woomera, Portulacca Ridge and Red Lake. Joint final report at licences' joint full surrender, for the period 15/2/1983 to 7/11/1986.
The three licences now being surrendered were originally taken out by Seltrust in the mid-1970s to search for stratabound base metals and Olympic Dam type mineralisation. After Seltrust withdrew from the subsequently formed Stuart Shelf joint venture...-
Document
-
South Vivian [Homestead]. Annual reports and final report to licence expiry/full surrender, for the period 12/6/2007 to 11/6/2009.
An area located on the northern Stuart Shelf between Olympic Dam and Prominent Hill, approx. 50 km south-southwest of the latter, has been explored for possible Olympic Dam type iron oxide - associated copper-gold (IOCG) deposits and for Canadian...-
Document
Published: 17 Oct 1909
-
Coondambo. Second partial surrender report, for the period 7/6/2001 to 6/6/2009.
As part of a search for possible buried economic Olympic Dam type IOCG-U deposits in volcanic basement, or for stratiform Athabasca Basin type uranium occurrences in the overlying cover, farminee Marathon Resources carried out detailed calcrete...-
Document
-
Bopeechee. Final report at licence expiry/full surrender, for the period 16/11/2000 to 27/7/2008.
In on-ground exploration of an area on the Stuart Shelf located 18-46 km north-east of Olympic Dam, possible economic sedex - style, Mount Isa / Nifty type stratabound copper was targeted within Neoproterozoic carbonate rocks as part of multiple...-
Document
-
Pyramid Bore. Annual reports and final report to licence full surrender, for the period 8/7/2005 to 5/1/2010.
An area located approximately 10 km north of Glendambo has been explored for possible economic buried uranium deposits which might be indicated by aerial radiometric anomalies associated with playa lakes in the region, since these latter mark zones of...-
Document
Published: 20 May 1910
-
Data release - as updated : McDouall Peak. Annual reports and final report to licence expiry/full surrender, for the period 8/10/2007 to 7/10/2022.
Quasar Resources has been exploring a large licence area centred approximately 40 km south-west of the Prominent Hill mine for possible economic buried iron-oxide-copper-gold (IOCG) style mineralisation, epithermal base metal mineralisation of the...-
Document
Published: 27 Oct 1922
-
The Lake Torrens Project; plus the Olympic Domain Project. Joint annual reports for the period 1/1/2006 to 31/12/2010.
Licensee Copper Range originally took up a group of three tenements located in central South Australia covering areas within and west of Lake Torrens, with the intent, much reinforced following the Carrapateena deposit discovery made in 2005, of...-
Document
Published: 04 Mar 1911
-
Coober Pedy Project. Annual reports, joint annual reports, and final reports at individual licences' full surrender, for the period 4/4/2011 to 3/4/2015.
Five separate areas located in the northern Gawler Craton adjacent to the Mount Woods Domain, which to date have received only minor attention from mineral explorers and so have had limited drilling done, have been explored for possible buried...-
Document
Published: 15 Apr 1915
-
Pernatty [Station] (part of the Punt Hill Project). First partial surrender report at licence expiry/renewal, for the period 29/11/2005 to 7/5/2016.
Two separate sub-areas formerly comprising 33% of a licence area located between Pernatty Lagoon and the southern end of Lake Torrens have been relinquished by licensee Monax Mining. The exploration objective for holding this ground previously had...-
Document
Published: 27 Jun 1916
-
Pernatty Lagoon. Final report, Project ADI RD02-295 [Accelerated Discovery Initiative Round 2, 2022].
This report pertains to the Pernatty C Zambian Copperbelt (ZCB) Project which was partially funded by a $298,500 grant through the State Government’s Accelerated Discovery Initiative (ADI) which aims to make a major contribution to achieving the South...-
Document
Published: 02 Aug 1922
-
The Olympic Domain Project. Joint annual reports for the period 1/1/2011 to 31/12/2016, plus individual licence full surrender final reports.
During the sixth year of the project, three gravity anomalies located on West Lake Torrens EL 4754, a short distance east of the Carrapateena IOCG prospect, were identified by Copper Range as worthy of follow up. A detailed infill ground gravity...-
Document
Published: 01 Mar 1919
-
Unlocking South Australia's Mineral and Energy Potential - A Plan for Accelerating Exploration. Theme 2 (drilling partnerships with PIRSA and industry) : Year 1 partnership no. DPY1-02, Titan mineral prospect. Project interim and final reports.
Titan prospect is located within Exploration Licence 3209, and lies 30 km north of the Olympic Dam mine. The prospect was first drilled by Western Mining Corp. in 1976 with diamond drillhole BD 1, and in 1981 with a second hole, BD 2. Both holes hit...-
Document
-
Roxby Downs North (part of the Olympic Domain Project). Final report at licence surrender for the period 18/6/2007 to 17/6/2009.
During its 2-year tenure of EL 3810, which consisted of two parcels of ground situated 25 to 70 km north-west of the Olympic Dam mine, Copper Range undertook a review of existing geological and geophysical data and identified a ring structure and...-
Document
Published: 17 May 1909
-
Yalymboo, Dingo Hill and Black Oak Hill (the Cariewerloo Project). Joint annual reports and separate final reports to licence's respective expiry/full surrender, for the period 5/6/2006 to 20/6/2009.
Possible Mesoproterozoic unconformity-related uranium deposits within the Cariewerloo Basin, involving an inferred structural preparation component whereby basic intrusive members of the Gairdner Dyke Swarm cut across this unconformity in a manner...-
Document
Published: 19 Nov 1909
-
Oak Dam (part of the Gawler Craton Joint Venture Project). Annual reports and final report to licence expiry/full surrender, for the period 17/7/2006 to 16/7/2011.
EL 3603, located on the Stuart Shelf approximately 50 km south of Olympic Dam, was taken under licence to explore for possible economic iron oxide - associated copper-gold-uranium (IOCG-U) deposits of Olympic Dam style that may have formed in...-
Document
Published: 28 Sep 1911
-
Pandurra. Annual reports to commencement of Pandurra JV Project licences' joint reporting, for the period 16/9/2005 to 23/2/2012.
An area comprising two separate sub-blocks centred approximately 40 km west of Port Augusta was taken up to explore for possible buried economic IOCG style epithermal/hydrothermal mineralisation that may have formed within Mesoproterozoic basement...-
Document
Published: 14 May 1912
-
Lake Gairdner South (part of the West Roxby Project). Data release: annual reports for the period 30/7/2007 to 29/7/2012.
An area centred approximately 60 km south-west of Woomera was taken up to explore its IOCG mineralisation potential, as a large regional gravity anomaly lying just east of Lake Gairdner was of interest in this regard. Work on the subject licence did...-
Document
-
Intercept Hill. Annual reports to licence expiry/full surrender, for the period 8/5/2003 to 14/7/2013. [Index Part 1 of 2].
An area on the Stuart Shelf which is centred ~45 km north-northwest of Mount Gunson and 70 km south-east of Olympic Dam was taken up to explore primarily for possible economic buried Mesoproterozoic basement-hosted copper-gold deposits, perhaps of...-
Document
Published: 15 Nov 1913
-
Data release [made at SA Director of Mines' discretion] : Pernatty Lagoon [East]. Annual reports to licence expiry/renewal, for the period 27/6/1997 to 26/6/2002.
An area of the Stuart Shelf located between Pernatty Lagoon and the Beda Arm of Lake Torrens, with its western boundary lying 15 km east of the historic Mount Gunson copper mining field, is being explored for possible economic basement-hosted IOCG...-
Document