Data release - as updated [made at SA Director of Mines' discretion] : North Mulga, Wooltana and Paralana areas (Frome Basin Project). Joint annual reports for the period 24/9/2012 to 31/12/2018.
The continuation of Heathgate's programme of exploration for economic buried Tertiary sediment-hosted uranium mineralisation within part of the north-western Frome Embayment during 2012-2013 has comprised exploratory drilling of 36 vertical rotary mud...-
Document
-
Karkaro. Progress report to licence full surrender, for the period 26/11/1974 to 25/2/1975.
TARGET: Possible open-pit mineable Lower Permian coal seams, present down to a depth of 100 m below surface, associated with an inferred basinal depression located to the north-west of and adjacent to previous SADM stratigraphic drillhole Karkaro 1,...-
Document
Published: 01 Jan 1975
-
Data release - as updated [made at SA Director of Mines’ discretion] : Wooltana. Annual reports for the period 8/8/1997 to 23/9/2009.
Exploration for possible economic buried sedimentary uranium mineralisation within a large portion of the north-western Frome Embayment located immediately south of the Beverley uranium deposit and covering the southern end of the Poontana Sub-basin,...-
Document
Published: 23 Nov 2009
-
Data release [made at SA Director of Mines’ discretion] : Arkaroola, Moolawatana and Mount Hopeless (the Frome Basin Project). Joint annual report for the period 1/1/2016 to 31/12/2018.
Exploration Licence 5017 Arkaroola, Exploration Licence 5118 Mt Yerila and Exploration Licence 5261 Petermorra cover a combined area of approximately 1831 square km within the northern Flinders Ranges and the Frome Basin. The area is being targeted...-
Document
Published: 16 Jan 2019
-
Data release [made at SA Director of Mines' discretion] : Algebuckina. Annual reports for the period 3/8/2004 to 2/8/2008.
An area surrounding the Algebuckina Inlier of the Proterozoic Peake and Denison Ranges, which is centred approximately 50 km south-east of Oodnadatta, is being explored for possible roll-front style sedimentary uranium deposits that may have formed...-
Document
Published: 20 Oct 2008
-
Data release - as updated [made at SA Director of Mines' discretion] : Lake Frome. Annual reports for the period 18/10/2013 to 17/10/2016.
An area abutting the south-western edge of Lake Frome and the southern boundary of the Gammon Ranges National Park, that is centred ~60 km south of the Beverley uranium mine, has been taken up to explore for possible buried palaeochannel and sandstone...-
Document
Published: 09 Dec 2016
-
Data release - as updated : Reaphook Hill. Licence-specific annual reports to the commencement of Frome Basin Project joint reporting, plus final report to licence expiry/full surrender, for the overall period 24/7/2013 to 11/1/2022.
An area on the south-western edge of the Frome Embayment, that is centred ~100 km south of the Beverley uranium mine, has been taken up to explore for possible buried palaeochannel and sandstone hosted roll front style secondary uranium mineralisation...-
Document
Published: 06 Jul 2021
-
Pyramid Bore. Annual reports and final report to licence full surrender, for the period 8/7/2005 to 5/1/2010.
An area located approximately 10 km north of Glendambo has been explored for possible economic buried uranium deposits which might be indicated by aerial radiometric anomalies associated with playa lakes in the region, since these latter mark zones of...-
Document
Published: 20 May 2010
-
Data release - as updated [made at SA Director of Mines’ discretion] : Mount Yerila. Annual reports for the period 27/8/2009 to 26/8/2015.
During the 2009-2010 licence year, 8 vertical open rotary mud drillholes, YR035 to YR042, were completed along two drill traverses for a total penetration of 1614 m. They were designed to intersect the Eyre Formation adjacent to interpreted faults in...-
Document
Published: 10 Sep 2013
-
Lake Frome [West]. First partial surrender report, for the period 18/10/2013 to 17/10/2016.
An area on the south-western edge of the Frome Embayment, that is centred ~100 km south of the Beverley uranium mine, has been taken up to explore for possible buried palaeochannel and sandstone hosted roll front style secondary uranium mineralisation...-
Document
Published: 02 Nov 2017
-
Drennans Hut. Annual reports plus final report to licence full surrender, for the period 19/8/2013 to 5/6/2019.
An area in the south-west of the Frome Embayment, that was centred ~16 km south-southeast of Reaphook Hill, was taken up to explore for possible buried palaeochannel and sandstone hosted roll front style secondary uranium mineralisation which might...-
Document
Published: 22 Jul 2019
-
The Lake Eyre Project. Joint first annual report plus final report to project licences' joint full surrender, for the period 3/5/2011 to 7/3/2013.
A large area surrounding the southern end of Lake Eyre, which is known to be underlain by a thinning succession of Cretaceous basinal sediments, was taken up to explore for possible economic secondary sandstone-hosted uranium mineralisation. No field...-
Document
Published: 27 Mar 2013
-
Peake. Third partial surrender report for the period 3/8/2004 to 28/9/2010.
A now relinquished licence portion located along the western margin of the Denison Inlier has been explored for possible economic stratabound roll-front style or palaeochannel hosted sedimentary uranium deposits, inferred as likely to have formed...-
Document
Published: 01 Feb 2011
-
Edward Creek. Annual reports and final report to licence expiry/full surrender, for the period 16/9/2005 to 15/9/2009.
An area located immediately west of the Denison Inlier of the Proterozoic Peake and Denison Ranges, approximately 90 km south-east of Oodnadatta, was explored for possible roll-front style sedimentary uranium deposits that may have formed within...-
Document
Published: 20 Oct 2009
-
Peake Creek. Annual reports and final report to licence expiry/full surrender, for the period 16/9/2005 to 15/9/2009.
An area located immediately west of the Denison Inlier of the Proterozoic Peake and Denison Ranges, approximately 70 km south-east of Oodnadatta, was explored for possible roll-front style sedimentary uranium deposits that may have formed within...-
Document
Published: 20 Oct 2009
-
Mount Kingston East Areas 1 and 2, and Mount Harvey (the Denison Range Project). Joint annual reports to licences' expiry/full surrender, for the period 13/12/2010 to 12/6/2013.
The three Denison Range Project tenements, centred approximately 70 km south-east of Oodnadatta, which cover alluvial plains formed adjacent to the south-eastern edge of said range of hills that comprise eroding Palaeo- to Mid-Proterozoic uranium-rich...-
Document
Published: 22 Jul 2013
-
Data release - as updated [made at SA Director of Mines’ discretion] : North Mulga. Annual reports to licence expiry/renewal, for the period 10/7/1997 to 23/9/2012.
Exploration for possible economic buried sedimentary uranium mineralisation within a large portion of the north-western Frome Embayment located immediately east and north-east of the Beverley uranium deposit and covering the northern end of the...-
Document
Published: 05 Nov 2012
-
Algebuckina. Fourth partial surrender report, for the period 3/8/2004 to 28/9/2010.
Three now relinquished licence portions located along the western margin of the Denison Inlier have been explored for possible economic stratabound roll-front style or palaeochannel hosted sedimentary uranium deposits, inferred as likely to have...-
Document
Published: 01 Feb 2011
-
Data release - as updated [made at SA Director of Mines' discretion] : Mount Frome North. Annual reports for the period 19/8/2013 to 18/8/2016.
An area in the south-west of the Frome Embayment, that is centred ~80 km south-southeast of the Beverley uranium mine, has been taken up to explore for possible buried palaeochannel and sandstone hosted roll front style secondary uranium...-
Document
Published: 08 Sep 2016
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 3 partnership DPY3-15, Peake and Denison Inliers western flank Mesozoic sedimentary uranium mineral prospects. Project final report.
Approved PACE Initiative Year 3 drilling proposal DPY3-15 aimed to discover a roll-front style uranium deposit hosted in Mesozoic sandstones flanking the exposed radiogenic Peake and Denison Inliers, that is amenable to mining by in-situ leach...-
Document
Published: 13 Apr 2007